An air supply system for a power plant is being designed. There are two options unde consideration. The first option has two subsystems connected in parallel; the failure rate of each subsystem is equal with A1 = 0.01 per hour. Both subsystems must work for the air supply to fully function. A B The second option connects the subsystems with A as the main supply, providing 100% of the ai requirement, and B acting as a 100% cold standby. In this case, however, each subsystem has a higher failure rate of A2 = 0.02 per hour. The reliability of the "cold standby" switch is 0.95. A Switch B For a daily service time of 8 hours, which alternative has a higher reliability? Why?

MATLAB: An Introduction with Applications
6th Edition
ISBN:9781119256830
Author:Amos Gilat
Publisher:Amos Gilat
Chapter1: Starting With Matlab
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
QUESTION
An air supply system for a power plant is being designed. There are two options under
consideration.
The first option has two subsystems connected in parallel; the failure rate of each subsystem is
equal with A1 = 0.01 per hour. Both subsystems must work for the air supply to fully function.
A
B
The second option connects the subsystems with A as the main supply, providing 100% of the air
requirement, and B acting as a 100% cold standby. In this case, however, each subsystem has a
higher failure rate of A2 = 0.02 per hour. The reliability of the "cold standby" switch is 0.95.
A
Switch
For a daily service time of 8 hours, which alternative has a higher reliability? Why?
Transcribed Image Text:QUESTION An air supply system for a power plant is being designed. There are two options under consideration. The first option has two subsystems connected in parallel; the failure rate of each subsystem is equal with A1 = 0.01 per hour. Both subsystems must work for the air supply to fully function. A B The second option connects the subsystems with A as the main supply, providing 100% of the air requirement, and B acting as a 100% cold standby. In this case, however, each subsystem has a higher failure rate of A2 = 0.02 per hour. The reliability of the "cold standby" switch is 0.95. A Switch For a daily service time of 8 hours, which alternative has a higher reliability? Why?
Expert Solution
steps

Step by step

Solved in 5 steps with 8 images

Blurred answer
Similar questions
Recommended textbooks for you
MATLAB: An Introduction with Applications
MATLAB: An Introduction with Applications
Statistics
ISBN:
9781119256830
Author:
Amos Gilat
Publisher:
John Wiley & Sons Inc
Probability and Statistics for Engineering and th…
Probability and Statistics for Engineering and th…
Statistics
ISBN:
9781305251809
Author:
Jay L. Devore
Publisher:
Cengage Learning
Statistics for The Behavioral Sciences (MindTap C…
Statistics for The Behavioral Sciences (MindTap C…
Statistics
ISBN:
9781305504912
Author:
Frederick J Gravetter, Larry B. Wallnau
Publisher:
Cengage Learning
Elementary Statistics: Picturing the World (7th E…
Elementary Statistics: Picturing the World (7th E…
Statistics
ISBN:
9780134683416
Author:
Ron Larson, Betsy Farber
Publisher:
PEARSON
The Basic Practice of Statistics
The Basic Practice of Statistics
Statistics
ISBN:
9781319042578
Author:
David S. Moore, William I. Notz, Michael A. Fligner
Publisher:
W. H. Freeman
Introduction to the Practice of Statistics
Introduction to the Practice of Statistics
Statistics
ISBN:
9781319013387
Author:
David S. Moore, George P. McCabe, Bruce A. Craig
Publisher:
W. H. Freeman