A truck delivers 20,000 kg of HMA to the paver. The paver is placing a 4.3 m wide 40 mm thick mat that has a density of 2305 kg/m Calculate the distance the paver should travel. 1. 3 three trucks weighing 14,566kg, 15230kg, and 14021kg deliver HMA to paver. The mat is 4.5m wide and 55mm thick with a density of 2250kg/m 3 If the starting station is 8+915, at which station (to the meter) should the at after all 3 trucks have dumped? 2. the paver be 3. A paving job is nearing completion, and the foreman needs to let the plant know how much HMA is needed to complete. The calculations are based from station 1+330, and the finish station is 1+343. The mat is 3.7m wide x 55mm deep. The density at laydown is 2350kg/m 3 Calculate the mass required to finish the job in kg.

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
A truck delivers 20,000 kg of HMA to the paver. The paver is placing a
4.3 m wide 40 mm thick mat that has a density of 2305 kg/m ³ Calculate the
1.
distance the paver should travel.
three trucks weighing 14,566kg, 15230kg, and 14021kg deliver HMA to
the paver. The mat is 4.5m wide and 55mm thick with a density of 2250kg/m ³ If
the starting station is 8+915, at which station (to the meter) should the paver be
at after all 3 trucks have dumped?
2.
3.
A paving job is nearing completion, and the foreman needs to let the plant
know how much HMA is needed to complete. The calculations are based from
station 1+330, and the finish station is 1+343. The mat is 3.7m wide x 55mm deep.
The density at laydown is 2350kg/m ³ Calculate the mass required to finish the job
in kg.
Transcribed Image Text:A truck delivers 20,000 kg of HMA to the paver. The paver is placing a 4.3 m wide 40 mm thick mat that has a density of 2305 kg/m ³ Calculate the 1. distance the paver should travel. three trucks weighing 14,566kg, 15230kg, and 14021kg deliver HMA to the paver. The mat is 4.5m wide and 55mm thick with a density of 2250kg/m ³ If the starting station is 8+915, at which station (to the meter) should the paver be at after all 3 trucks have dumped? 2. 3. A paving job is nearing completion, and the foreman needs to let the plant know how much HMA is needed to complete. The calculations are based from station 1+330, and the finish station is 1+343. The mat is 3.7m wide x 55mm deep. The density at laydown is 2350kg/m ³ Calculate the mass required to finish the job in kg.
Expert Solution
steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Knowledge Booster
Methods of ground improvement
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning