A hydraulic shovel will be used to excavate sandy clay and load it into a 12 BCY dump truck. The shovel production at 100% efficiency is estimated to be 300 BCY/hour and job efficiency is 0.80. Truck travel time is estimated to be 8.0 minutes and truck fixed cycle time (excluding loading) is estimated to be 2.0 minutes. Equipment costs for the shovel and trucks are $40/h (shovel) and $20/h (truck). A. How many trucks are theoretically required to obtain maximum production? B. What is the expected production of the system in banked measure using this number of trucks? C. What is the expected unit loading and hauling costs in $/BCY?

Fundamentals Of Construction Estimating
4th Edition
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Pratt, David J.
Chapter10: Pricing Excavation And Backfill
Section: Chapter Questions
Problem 7RQ
icon
Related questions
Question
7.
A hydraulic shovel will be used to excavate sandy clay and load it into a 12 BCY
dump truck. The shovel production at 100% efficiency is estimated to be 300
BCY/hour and job efficiency is 0.80. Truck travel time is estimated to be 8.0
minutes and truck fixed cycle time (excluding loading) is estimated to be 2.0
minutes. Equipment costs for the shovel and trucks are $40/h (shovel) and $20/h
(truck).
A. How many trucks are theoretically required to obtain maximum
production?
B. What is the expected production of the system in banked measure using
this number of trucks?
C. What is the expected unit loading and hauling costs in $/BCY?
Transcribed Image Text:7. A hydraulic shovel will be used to excavate sandy clay and load it into a 12 BCY dump truck. The shovel production at 100% efficiency is estimated to be 300 BCY/hour and job efficiency is 0.80. Truck travel time is estimated to be 8.0 minutes and truck fixed cycle time (excluding loading) is estimated to be 2.0 minutes. Equipment costs for the shovel and trucks are $40/h (shovel) and $20/h (truck). A. How many trucks are theoretically required to obtain maximum production? B. What is the expected production of the system in banked measure using this number of trucks? C. What is the expected unit loading and hauling costs in $/BCY?
Expert Solution
steps

Step by step

Solved in 5 steps

Blurred answer
Knowledge Booster
Methods to determine productivity
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Fundamentals Of Construction Estimating
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:
9781337399395
Author:
Pratt, David J.
Publisher:
Cengage,