A four-lane freeway (two lanes in each direction) is located on rolling terrain and has 12-ft lanes, no lateral obstructions within 6 ft of the pavement edges, and there are two ramps within three miles upstream of the segment midpoint and three ramps within three miles downstream of the segment midpoint. The traffic stream consists of cars, buses, and large trucks (no recreational vehicles). A weekday directional peak-hour volume of 1800 vehicles (familiar users) is observed, with 700 arriving in the most congested 15-min period. If a level of service no worse than C is desired,
c.) Determine the maximum number of large trucks and buses that can be present in the peak-hour Traffic stream. (Round off to nearest integer)
Step by stepSolved in 2 steps
- A 5% upgrade on a six-lane freeway (three lanes in each direction) is 1.25 mi long. On this segment of freeway, there is 3% SUTS and 7% TTs, and the peak-hour factor is 0.90. The lanes are 12 ft wide, there are no lateral obstructions within 6 ft of the roadway, and the total ramp density is 1.0 ramps per mile. What is the maximum directional peak-hour volume that can be accommodated without exceeding LOS C operating conditions in veh/h? Round of your answer to whole number. Blank 1arrow_forwardA developer has applied for a construction permit to build a supermarket at the southeast cornerof an intersection that is formed by a four-lane divided highway in the east-west direction and atwo-lane road in the north-south direction. Traffic on the two-lane road is controlled by a stop signat the intersection. The speed limit on the four-lane highway is 88 km/h. using the sight trianglerequirements at the intersection (Case B1), determine whether permission should be given for theconstruction if the following conditions exist. Provide a diagram for your solution.Major road lane width = 3.6 mMinor road lane width = 3.3 mMedian lane = 2.8 mDesign vehicle is a passenger carApproach grade = 2%Maximum feasible distance building from the center of the nearest lane of four-lane road = 5.4 mMaximum feasible distance building from the center of the nearest lane of two-lane road = 16.5 marrow_forwardA temporary diversion has been constructed on a highway of -3% gradient due to major repairs that are being undertaken. Determine the speed limit that should be imposed on the diversion if drivers can see the sign inform ing them of the diversion at a distance of 400 ft from the diversion and the posted speed limit on the highway is 60 mph.arrow_forward
- Structural Analysis (10th Edition)Civil EngineeringISBN:9780134610672Author:Russell C. HibbelerPublisher:PEARSONPrinciples of Foundation Engineering (MindTap Cou...Civil EngineeringISBN:9781337705028Author:Braja M. Das, Nagaratnam SivakuganPublisher:Cengage Learning
- Fundamentals of Structural AnalysisCivil EngineeringISBN:9780073398006Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel LanningPublisher:McGraw-Hill EducationTraffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning