Transcribed Image Text:A Florida lottery machine and printer at Store #8302 operates
360 days a year. If the machine does not work and breaks
down, it costs the Florida Lottery Commission $2,160 per day. If
store employees are trained to perform local tests on the
machine each day plus the costs of machine repairpersons,
these preventive maintenance costs average $850 per day. If
preventive maintenance is performed daily, the probability the
equipment fails is zero. The probability of store lottery machine
breakdown is as follows.
Number of Lottery
Machine Breakdowns
per Day
0
1
1/3
Probability of a
breakdown
What are the economics of the situation? Do not round
intermediate calculations. Round your answers to the nearest
dollar.
The expected cost of a breakdown per day is $
The Florida Lottery Commission saves $
by performing preventive maintenance daily.
2
1/3
1/3
per year
SAVE
AI-Generated Solution
info
AI-generated content may present inaccurate or offensive content that does not represent bartleby’s views.
Unlock instant AI solutions
Tap the button
to generate a solution
to generate a solution
Click the button to generate
a solution
a solution
Knowledge Booster
Similar questions
- The following is an excerpt from a conversation between two sales clerks, Tracy Rawlin and Jeff Weimer. Both Tracy and Jeff are employed by Magnum Electronics, a locally owned and operated electronics retail store. Suggest appropriate control procedures that would have prevented or detected the theft of cash.arrow_forward1. An electronic component in a satellite radio made by Spacescope, Inc. has a failure rate of λ = 0.0000165 units/hour. Find the mean time to failure (MTTF). What is the probability (assuming an exponential probability distribution) that the component will not have failed after 20,000 hours of operation? Calculate your answer using the appropriate mathematical formula and verify your result using Excel. Then draw the reliability function to verify your answer visually. 2. Magnaplex, Inc. has a complex manufacturing process, with three operations that are performed in series. Because of the nature of the process, machines frequently fall out of adjustment and must be repaired. To keep the system going, two identical machines are used at each stage; thus, if one fails, the other can be used while the first is repaired (see accompanying figure). B Production System The reliabilities of the machines are as follows: Machine A Reliability 0.85 0.92 B с 0.90 a. Analyze the system…arrow_forwardAssume Bristol-Myers Squibb is faced with one source of business risk as worker's injury. The probability of worker injury is 0.09 and when the accident (injury) happens, the losses from a worker's injury has medical expenses of $8,000 and lost pay expenses of $90,000. What is the expected loss per worker? A-- $8,820 B-- $7,056 C-- none of the answers is correct D-- $7,417 E-- $17,640arrow_forward
- The Liebowitz Social Anxiety scale contains the following item: "Returning goods to a store where returns are normally accepted." According to Professor Jensen, this item would be a poor measure of social anxiety, in and of itself, because it has low: contact-to-connection reliability resonance exemplification validityarrow_forwardThere is a 4 percent error rate at a specific point in a production process. If an inspector is placed at this point, all the defects can be detected and eliminated. The inspector would cost $9 per hour and could inspect units in the process at the current production rate of 46 per hour. If no inspector is hired and defects are allowed to pass this point, there is a cost of $10 per defective unit to correct the defects later on. Assume that the line will operate at the same rate (i.e., the current production rate) regardless of whether the inspector is hired or not. a. if the inspector is hired, what will be the inspection cost per unit? b. if an inspector is not hired, what will be the defective cost per unit? c. should an inspector be hired based on costs alone?arrow_forwardSeveral years ago, Baecher, de Neufville, and Paté carried out a study of reported failures of large dams around the world. They concluded that the failure rate was 0.0001 per dam-year. A dam-year is defined as one dam operating for one year. The definitions of "failure" and "large dam" are subject to dispute, but the study has become the basis for much of the reliability studies done by agencies that operate dams. Almost everyone assumes that this failure rate represents a constant failure rate (CFR) scenario even though there is good reason to believe that a bathtub curve, with higher rates of failure at the beginning and end of the life cycle, might be more appropriate. Assuming that the CFR model is accurate, answer the following: a) What is the mean time to failure (MTTF) in dam-years for the Baecher et al. model? b) If an agency manages a portfolio of 350 dams, and they are independent of each other, what is the mean time the agency can expect to carry on before a failure occurs?…arrow_forward
- Output from a process contains 0.02 defective unit. Defective units that go undetected into final assemblies cost $25 each to replace. An inspection process, which would detect and remove all defectives, can be established to test these units. However, the inspector, who can test 20 units per hour, is paid $8 per hour, including fringe benefits. Should an inspection station be established to test all units? Assume that the line will operate at the same rate (i.e., the current production rate) regardless of whether or not the inspection operation is added. a-1. Without the inspector, what is the current hourly cost of defects? a-2. Should an inspection station be established to test all units based on costs alone? multiple choice Yes No a-3. If the inspection operation is added, what would be the cost to inspect each unit? Note: Round your answer to 2 decimal places. b. What would be the benefit (or loss) from establishing the inspection process? Note: Round your answer…arrow_forwardThe reliability dimension of quality relates to the useful life of a good or service. True Falsearrow_forwardOperational risk is an event risk where there is a wide range of events that can trigger losses. It can take place at which of the following levels noted in the examples below: a.Human error. b.All of the above. c.Outdated policy or procedures. d.Malfunction of a back-up system.arrow_forward
arrow_back_ios
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.

Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,

Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education

Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education


Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning

Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.