- A design contractor is paid separately for each swimming pool designed. Designed payments would be classified as _____ cost.
- indirect
- direct
- fixed
- administrative
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
This is a popular solution
Trending nowThis is a popular solution!
Step by stepSolved in 2 steps
Knowledge Booster
Similar questions
- . How much testing is performed by the Resident Project Representative and his staff?arrow_forwardonly answer The following information belongs to a target cost contract: Target cost = $200 M %3D Target band $180 M and ends $220 M Target contractor fee = $25 M %3D Cost saving share = 70/30 by owner Cost increase share 65/35 by contractor Contractor minimum fees =$10 M The GMC = $270 M %3D Minimum expected project cost = $ 150 M %3D Calculate the project cost, if the contractor Fee is ?Zero إختر أحد الخيارات: М 285.4 .а О M 292.4 b O M 297.4 .carrow_forwardTrue or false? If requested by the contractor, the Resident Project Representative or inspector may offer suggestions as to how to do the work.arrow_forward
- Why should the Resident Project Representative not receive the submittals from the sub-contractors directly?arrow_forwardWhat are the temporary facilities provided by the Contractor?arrow_forwardthe client request a recommendation of a contractor from the licensee the license has an obligation to recommend A. Three reputable contractors B. The least expensive contractor C. At least three bids for the work to be performed D. A licensed home improvement contractorarrow_forward
- Give the list of possible tasks that might be offered to the resident project representative during the contractor's payment request?arrow_forwardDescribe the troubles caused in the early years due to the unexperienced Resident Project Representatives?arrow_forwardDevelop a programming budget estimate for a 100,000 square-foot warehouse, assuming a square-foot cost factor of $60 per square foot. The site will be about 200,000 square feet with a site development cost of $3 per square foot. Use the following allowances to prepare your budget estimate: - Owner-furnished FFE: $1,000,000 - Owner soft costs: $800,000 - Programming fees: $50,000 - Geotechnical Investigation: $390,000arrow_forward
- Develop a programming budget estimate for a 100,000 square-foot warehouse, assuming a square-foot cost factor of $60 per square foot. The site will be about 200,000 square feet with a site development cost of $3 per square foot. Use the following allowances to prepare your budget estimate: - Owner-furnished FFE: $1,000,000 - Owner soft costs: $800,000 - Programming fees: $50,000 - Geotechnical Investigation: $390,000arrow_forwardOn a project that supports a full-time Resident Project Representative at the site, with the project manager located in the home office, to whom should all contractor submittals be submitted first?arrow_forwardYou want a mountain cabin built for weekend trips, vacations, to host family, and perhaps eventually to retire in. After discussing the project with a local contractor, you receive an estimate that the total con- struction cost of your 2000-ft2 lodge will be $250,000. The percentage of costs is broken down as follows: Percentage of Cost Items Total Costs Construction permits, legal and 8 title fees Roadway, site clearing, preparation Foundation, concrete, masonry Wallboard, flooring, carpentry Heating, ventilation, air conditioning (HVAC) Electric, plumbing, communications Roofing, flooring Painting, finishing 15 13 12 13 10 12 17 100 (a) What is the cost per square foot of the 2000-ft2 lodge? (b) If you are also considering a 4000-ft² layout option, estimate your construction costs if: i. All cost items (in the table) change propor- tionately to the size increase. ii. The first two cost items do not change at all; HVAC changes by 50%; and all others are proportionate.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Fundamentals Of Construction EstimatingCivil EngineeringISBN:9781337399395Author:Pratt, David J.Publisher:Cengage,Architectural Drafting and Design (MindTap Course...Civil EngineeringISBN:9781285165738Author:Alan Jefferis, David A. Madsen, David P. MadsenPublisher:Cengage Learning
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Cengage,
Architectural Drafting and Design (MindTap Course...
Civil Engineering
ISBN:9781285165738
Author:Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:Cengage Learning