A barge is 15 ft wide and 40 ft long and floats with a draft (i.e., depth below water) of 4ft. It is piled so high with gravel that its center of gravity is 3ft above the waterline. Is it stable?
Q: Backsight Intermediate Foresight Rise Fall ReducedLe Top Sight 1.250 0.300 0.450 0.520 0.515 0.526…
A: To approach solving questions related to identifying contour lines or similar data interpolation…
Q: H 4G 44:50 CE427_Plate-2-1.... ← USTP UNIVERSITY OF SCIENCE AND TECHNOLOGY OF SOUTHERN PHILIPPINES…
A: Here is the solution. Explanation:To compute for ka (earth active pressure), the Rankine Theory was…
Q: pakita po ng full solution
A: Step 1: Step 2: Step 3: Step 4:
Q: The vertical reaction at support B is 6.53kN. a) considering the reference at the left-hand side,…
A: Step 1:
Q: A man wants to buy five materials for a 5 day work as shown in table 1.1 and for each item, the…
A:
Q: Need help with civil engineering and construction operations nvq level 2
A: The NVQ Level 2 in Civil Engineering and Construction Operations is a vocational qualification that…
Q: Answer fast
A:
Q: Please solve the problem in the picture, make sure you post pictures of your work instead of typing…
A: Step 1:Step 1: Understanding the problemThe table provides the number of flows that exceed the…
Q: ? 500 5000 500 ? mm TML=180 Wm Тома=80Nm Nd=15004N INd=1500 GN (1.46+1.6Q Lood Con C35/45 B420c **…
A: 1. Structural Inputs - Loads: - Normal force (Nd) = 1500 kN react at two columns. - Moment (Md) =…
Q: ✓ Details By rule of thumb, what is the estimated uncertainty in 437,853 ft2 if the estimated error…
A: Step 1:
Q: Please solve using paper:Problem 8. If w0 = 15 kN/m and L = 12 m, determine the resultant of the…
A: Rx=Area of the triangleRy=Area of the triangle = Moment due to Ry=Ry×Distance from O=45×12=540…
Q: Draw the orthographic projections for the image, show all measurements
A:
Q: For fully developed laminar pipe flow in a circular pipe, the velocity profile is given by u(r) = 2…
A: Approach to solving the question:The maximum velocity occurs at the center of the pipe. Average…
Q: Draw contours for the following data using the grid method. The following data of a piece of land…
A: The calculations are same as done for 854,856,and 860
Q: Determine the force in the barsAB, BE and DE, use the method of sections, draw and the solution must…
A: Solution:
Q: ✰ Problem 3 The saturated unit weight of a soil sample is 19.8 kN/m³, and the water content is…
A:
Q: Answer fast and draw diagram
A: Step 1: Reactions at SupportsThe total uniform load on the top horizontal beam:…
Q: Please calculate the centroid x and y bar, and Ixx for the following shapes. Show all work with neat…
A:
Q: Please explain the answer.
A: Step 1: Sketch Draw two rectangular shapes to represent the reservoirs.Draw two rectangular shapes…
Q: Question 1 and 2 must use Workbench program. Please screenshot the graphs.
A: Step 1: Step 2: Step 3: Step 4:
Q: Problem 5. At a certain time during a hurricane, the wind pressure acting on the wall of a high-rise…
A: Step 1: Determine the Resultant Force The wind pressure varies linearly along the height of the…
Q: The moisture content (w) of a soil sample is 18.6% and its dry unit weight (Ya) is 15.7 kN/m³.…
A: Given Data:Moisture content, w=18.6%=0.186Dry unit weight, γd=15.7kN/m3Specific gravity of solids,…
Q: Show free body diagram and handwritten solutions. Please make sure correct answer
A:
Q: Determine and draw the curves of the cohesive forces of the beams in the following questions.
A:
Q: Use geometric construction in answering this plate.
A:
Q: Answer fast and do calculation
A:
Q: Please solve the following problem step by step with clar solutions.
A:
Q: Given the following, determine the centroid about the x and y-axis for the following problem. Please…
A: Step 1: Step 2: Step 3: Step 4:
Q: https://www.bartleby.com/solution-answer/chapter-12-problem-1213p-principles-of-foundation-engineeri…
A:
Q: A traffic study showed that 25% of the headways between successive vehicles are less than 7 seconds.…
A: Given that the distribution of vehicle headways (time between successive vehicles) is negative…
Q: ◆ Problem 9 Soil has been compacted in an embankment at a bulk density of 2.15 Mg/m3 and a water…
A: Step 1:Step 2:Step 3:Step 4:
Q: Don't use chatgpt will upvote
A: Part 1: Direction and Magnitude of the Cannon's VelocityWe can use the principle of conservation of…
Q: Question #1. The rigid beam is supported by a pin at B and wires AD and CE. If the load P on the…
A: The following parameters are givenThe length of the link AD is LAD=3 mThe length of the link CE is…
Q: = 3. A rectangular beam having b = 10 in. and d= 17.5 in. spans 15 ft face to face of simple…
A: Calculate the Factored Shear Force Vu As you have already noted, the factored load per unit length…
Q: SAMPLE PROBLEMS 1. A force of 800N is exerted on a bolt A as shown. Determine the horizontal and…
A: Step 1: Step 2: Step 3:
Q: 5. Select a pair of channels and design the fillet welds using SMAW process. The loading is 85% live…
A: Step 1:For A36 SteelGiven:Live Load (LL) = 170 kipsDead Load (DL) = 30 kipsDesign Load…
Q: Following is the variation of the field standard penetration number () in a sand deposit:…
A: Step 1: Step 2: Step 3: Final Corrected Values: Depth…
Q: solve the following problem with step by step solutions so i can understand
A: Given Cross-section dimensions = (1.5 in × 2 in)Yield strength (Fy) = 36000 lb/in²Modulus of…
Q: Design Problem 3 The pretensioned circular beam shown below has straight cables with initial stress…
A: Step 1Step 2:
Q: The following table gives the variation of the field standard penetration number in a sand deposit:…
A:
Q: 6. Design the tension plate attached to the wide-flange (W) section as well the welds, assuming the…
A: Step 1:
Q: Please solve the following problem with steo by step solutions
A: Given the information:Required:Centroid about the x-axisSolution:To determine the centroid about the…
Q: Please help with this sample problem presented in our lecture. Explain the relevant concepts on how…
A:
Q: Determine the approximate quantity and types of equipment by specific tasks that you will use on…
A: The task is to build an earth dam that is 200 feet high, with a 20-foot crest width, and 2:1 side…
Q: Determine the moments of inertia and the product of inertia of the cross-sectional area of the…
A:
Q: Please solve using paper.Problem 10. A ball weighing 20 kg is placed as shown in the figure. If the…
A: Step 1: Step 2
Q: Need with diagram solutions no chat gpt. DESIGN ONLY FOR SHEAR AND MOMENT STRESSES
A: :
Q: Draw contours for the following data using the grid method. The following data of a piece of land…
A:
Q: Question 8 a. Given the Linear Programming Problem below, construct the dual of the problem. Min…
A:
Q: The floor system used in a school classroom. The live load is 0.4 k / ft2 and the slab is…
A:
Step by step
Solved in 2 steps with 2 images
- A belt conveyor is required to deliver crushed limestone having a bulk density of 75 lb/cu ft at the rate of 200 tons/hr. The conveyor is to be 200 ft between center of pulleys with a rise of 25 ft. The largest lumps are 4 in. and constitute 15% of the total. The conveyor will discharge over the end. For a belt speed of 200 fpm, what is the minimum width of belt that can be used? Calculate the horsepower for the drive motor.Answer number 20 ONLYA rectangular scow with a height of 7ft, width of 18ft and length of 32ft, being loaded with garbage has a draft of 5ft in water. Its center of gravity is 2ft above the waterline. given that the scow is stable, what is the draft of the scow in water.
- Number 11 - 13 onlyA project consists of replacing the truck on an existing existing roadroad line involving 3000 feet of track. The old track can be removed at a rate of 70 feet per hour. The old rail ties can be removed at a rate of 200 feet per hour. The new ties can be installed at a rate of 25 feet per hour, and the installment track can be installed at a rate of 40 feet per hour. show this operation on a linear schedule. Assume that the minimum float for an activity at any location is 1 day.Discuss the importance of load balancing as it may relate to safety in agricultural facilities.
- Estimate the volume of the earth that has to be removed to make room for the 96 km, 7 m diameter, concrete-lined water tunnel. Also, investigate the capacity of typical dump trucks used in removal of earth materials. P R O B L E M CopyrightRequired to prepare the action plan for the events show in table below and determine the Total Float ( TF) and Free Floats( FF)?? DUR ES EF LS LF TF FF B,C 3 -- A D 4 A E,F G 2 В 5 C F 2 C 1 D,F H 4 G,E 3 --- YARY A ABCDEFCHQuestion: Each of the four silos seen in the figure has an empty weight of 30MN, and can hold up to 105 MN of grain. The weight of the mat is 55 MN. Since each silo is filled independently, the resultant load imposed on the mat does not necessarily act through the centroid. Evaluate the various loading conditions and determine whether centrally loaded, one-way eccentric loaded, and two-way eccentric loading requirements will be met. If these requirements are not met, determine the minimum mat width, B, needed to satisfy these requirements. Allowable bearing capacity is given as qa=265kPa). 50m 12,5m Plan 50m 12,5m Profile Mat foundation
- i need the answer quicklyAggregates from a material storage site are required for the embankment of a roadway. The porosity of the aggregates at the storage is 75% and it is desired that these be compacted until a porosity of 20% is reached. The section of current interest for the embankment is 8m wide, 1.2m compacted thickness and 220m long. Compute the total cost if each truckload of aggregates to be transported will cost around 3550.00 and each truckload has a capacity of 7m3.Estimate the cycle time and production of a 30-cubic-yardwheel tractor scraper carrying rated capacity, operating on a4,500-foot level haul. The road flexes under load, has littlemaintenance, and is rutted. Material is 3,000 lb/BCY. Thescrapers are push-loaded by one 385-horsepower, tracktypepusher tractor. How many scrapers can be served bythis one pusher?