62 What is a stand-alone PV system considered under NEC labeling requirements? Power source Energy generator Storage system D Interactive system 63 What is the purpose of visual inspection when commissioning a PV system? To perform a detailed analysis of system output To ensure operation of ground-fault protection devices To confirm all modules are producing as expected, given environmental conditions D To identify easy-to-find, deficient details of installation without the use of instrumentation Domain: Installation 64 Which tool may be used to identify loose electrical connections that create heat? Refractive index hydrometer Infrared non-contact thermometer C Irradiance meter D Digital multimeter

Power System Analysis and Design (MindTap Course List)
6th Edition
ISBN:9781305632134
Author:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Chapter3: Power Transformers
Section: Chapter Questions
Problem 3.56P: Three single-phase two-winding transformers, each rated 3kVA,220/110volts,60Hz, with a 0.10 per-unit...
icon
Related questions
Question
62
What is a stand-alone PV system considered under NEC labeling requirements?
A
Power source
Energy generator
Storage system
D
Interactive system
63
What is the purpose of visual inspection when commissioning a PV system?
To perform a detailed analysis of system output
B
To ensure operation of ground-fault protection devices
To confirm all modules are producing as expected, given environmental conditions
D
To identify easy-to-find, deficient details of installation without the use
instrumentation
Domain: Installation
64
Which tool may be used to identify loose electrical connections that create heat?
A
Refractive index hydrometer
B
Infrared non-contact thermometer
Irradiance meter
Digital multimeter
65
What is the power rating of a PV array that consists of thirty 265W modules connected in three
series strings of 10 modules each?
2.65kW
7.95kW
7.95kWh
795kWh
Transcribed Image Text:62 What is a stand-alone PV system considered under NEC labeling requirements? A Power source Energy generator Storage system D Interactive system 63 What is the purpose of visual inspection when commissioning a PV system? To perform a detailed analysis of system output B To ensure operation of ground-fault protection devices To confirm all modules are producing as expected, given environmental conditions D To identify easy-to-find, deficient details of installation without the use instrumentation Domain: Installation 64 Which tool may be used to identify loose electrical connections that create heat? A Refractive index hydrometer B Infrared non-contact thermometer Irradiance meter Digital multimeter 65 What is the power rating of a PV array that consists of thirty 265W modules connected in three series strings of 10 modules each? 2.65kW 7.95kW 7.95kWh 795kWh
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 4 steps

Blurred answer
Knowledge Booster
Single Phase and Three Phase Inverter
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Power System Analysis and Design (MindTap Course …
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning