6- --It is the smallest time taken to complete the activity if everything goes on well A- Most likely time estimate B- Pessimistic time estimate C-Optimistic time estimate. D. None of these 7- -is phase involves setting the objectives of the projeet and the assumptions to be made A- Scheduling B- organizing C Controlling D- Planning 8 - The drawings, conditions, terms, and specifications setting forth the requirements for constructing the project. Refer to A- Quality B- Contract documents C- Project Manual D-All the above 9- To disconnect an activity before the completion of all the activities in a network diagram is known as A- Dangling B- Redundancy C-Looping D-Dummy activity 10- - refers to the amount of time by which the completion of an activity could be delayed beyond the earliest expected completion time without affecting the overall project duration time. A- Critical path B-Free float C- independent float D-Total float Page I of I

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
Hello, I have an exam and I need to answer all the options
6-
-It is the smallest time taken to complete the activity if everything goes on well
A- Most likely time estimate B- Pessimistic time estimate C- Optimistic time estimate.
D. None of these
7-
-is phase involves setting the objectives of the projeet and the assumptions to be made
A- Scheduling B- organizing
C Controlling D- Planning
8 - The drawings, conditions, terms, and specifications setting forth the requirements for constructing the
project. Refer to
A- Quality
B- Contract documents C- Project Manual
D-All the above
9- To disconnect an activity before the completion of all the activities in a network diagram is
known as
A- Dangling B- Redundancy C-Looping
D- Dummy activity
10-
- refers to the amount of time by which the completion of an activity could be delayed
beyond the earliest expected completion time without affecting the overall project duration time.
A- Critical path B-Free float C- independent float D-Total float
Page I of I
Transcribed Image Text:6- -It is the smallest time taken to complete the activity if everything goes on well A- Most likely time estimate B- Pessimistic time estimate C- Optimistic time estimate. D. None of these 7- -is phase involves setting the objectives of the projeet and the assumptions to be made A- Scheduling B- organizing C Controlling D- Planning 8 - The drawings, conditions, terms, and specifications setting forth the requirements for constructing the project. Refer to A- Quality B- Contract documents C- Project Manual D-All the above 9- To disconnect an activity before the completion of all the activities in a network diagram is known as A- Dangling B- Redundancy C-Looping D- Dummy activity 10- - refers to the amount of time by which the completion of an activity could be delayed beyond the earliest expected completion time without affecting the overall project duration time. A- Critical path B-Free float C- independent float D-Total float Page I of I
Expert Solution
steps

Step by step

Solved in 2 steps with 1 images

Blurred answer
Knowledge Booster
Material selection
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning