2.3. Tom's engineering wants to improve productivity, they are looking at material handling systems, and the cells are supported by a fleet of Forklift trucks. The average travel distance per delivery will be 900 m loaded and the average empty travel distance will be 900 m. The fleet must make a total of 66 deliveries/hr. Loading takes 0.68 min and unloading times is 0.50 min and the speed of the vehicles = 350 m/min. speed of the forklift truck when loaded is 350m/min and when empty is 420 m/min Assume the traffic factor for the system = 0.89, availability = 0.58, and efficiency = 76%. Determine the following: 2.3.1. Ideal cycle time per delivery 2.3.2. The resulting average number of deliveries/hr. that a forklift truck can make 2.3.3. How many trucks are required to accomplish the 60 deliveries/hr.?

Solid Waste Engineering
3rd Edition
ISBN:9781305635203
Author:Worrell, William A.
Publisher:Worrell, William A.
Chapter5: Separation Processes
Section: Chapter Questions
Problem 5.14P: Two materials, A and B, are to be separated using two unit operations, 1 and 2. The feed has 10...
icon
Related questions
icon
Concept explainers
Question
please answer within 30 minutes.
2.3. Tom's engineering wants to improve productivity, they are looking at material handling
systems, and the cells are supported by a fleet of Forklift trucks. The average travel distance
per delivery will be 900 m loaded and the average empty travel distance will be 900 m. The
fleet must make a total of 66 deliveries/hr. Loading takes 0.68 min and unloading times is
0.50 min and the speed of the vehicles = 350 m/min. speed of the forklift truck when loaded
is 350m/min and when empty is 420 m/min Assume the traffic factor for the system = 0.89,
availability = 0.58, and efficiency = 76%.
Determine the following:
2.3.1. Ideal cycle time per delivery
2.3.2. The resulting average number of deliveries/hr. that a forklift truck can make
2.3.3. How many trucks are required to accomplish the 60 deliveries/hr.?
Transcribed Image Text:2.3. Tom's engineering wants to improve productivity, they are looking at material handling systems, and the cells are supported by a fleet of Forklift trucks. The average travel distance per delivery will be 900 m loaded and the average empty travel distance will be 900 m. The fleet must make a total of 66 deliveries/hr. Loading takes 0.68 min and unloading times is 0.50 min and the speed of the vehicles = 350 m/min. speed of the forklift truck when loaded is 350m/min and when empty is 420 m/min Assume the traffic factor for the system = 0.89, availability = 0.58, and efficiency = 76%. Determine the following: 2.3.1. Ideal cycle time per delivery 2.3.2. The resulting average number of deliveries/hr. that a forklift truck can make 2.3.3. How many trucks are required to accomplish the 60 deliveries/hr.?
Expert Solution
steps

Step by step

Solved in 2 steps

Blurred answer
Knowledge Booster
Electrical plans
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Solid Waste Engineering
Solid Waste Engineering
Civil Engineering
ISBN:
9781305635203
Author:
Worrell, William A.
Publisher:
Cengage Learning,