2. Two cylindrical steel piles (P1 and P2) are to be driven along the shore. Two total stations were set up at TS3 and TS4 respectively to guide pile driving of the two piles. TS1 and TS2 were observed from both instrument and the following data were recorded (refer from the figure below). The distances from both instrument to the pile locations were also measured. a. Determine the coordinates of TS3. b. Determine the coordinates of TS4. c. Determine the coordinates of P1 d. Determine the bearing from P1toP2. N=8415.591 ATE4 E-3414.175 1975.655m ATS3 1451 931m 39 11'59" P1 3005.480m N=6523.709 E=3021.8324 2247.900m. 2094.661m 45°20'18" 1677.062m. 1994.379m 2702.590m

Principles of Foundation Engineering (MindTap Course List)
9th Edition
ISBN:9781337705028
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Braja M. Das, Nagaratnam Sivakugan
Chapter18: Sheet-pile Walls
Section: Chapter Questions
Problem 18.10P
icon
Related questions
Question
2. Two cylindrical steel piles (P1 and P2) are to be driven along the shore. Two total stations
were set up at TS3 and TS4 respectively to guide pile driving of the two piles. TS1 and TS2 were
observed from both instrument and the following data were recorded (refer from the figure
below). The distances from both instrument to the pile locations were also measured.
a. Determine the coordinates of TS3.
b. Determine the coordinates of TS4.
c. Determine the coordinates of P1
d. Determine the bearing from P1toP2.
N=8415.591
E=3414.175
1975.655m
ATS3
39°11'59",
1451 931m
3005.480m.
22
N=6523.709
1677.062m
54
2247.900m
E=3021.832
2094.66 1m
45°20'18"
1994.379m
2702.590m
Transcribed Image Text:2. Two cylindrical steel piles (P1 and P2) are to be driven along the shore. Two total stations were set up at TS3 and TS4 respectively to guide pile driving of the two piles. TS1 and TS2 were observed from both instrument and the following data were recorded (refer from the figure below). The distances from both instrument to the pile locations were also measured. a. Determine the coordinates of TS3. b. Determine the coordinates of TS4. c. Determine the coordinates of P1 d. Determine the bearing from P1toP2. N=8415.591 E=3414.175 1975.655m ATS3 39°11'59", 1451 931m 3005.480m. 22 N=6523.709 1677.062m 54 2247.900m E=3021.832 2094.66 1m 45°20'18" 1994.379m 2702.590m
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps

Blurred answer
Knowledge Booster
Pricing excavation and backfill
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Geotechnical Engineering (MindTap…
Fundamentals of Geotechnical Engineering (MindTap…
Civil Engineering
ISBN:
9781305635180
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781305081550
Author:
Braja M. Das
Publisher:
Cengage Learning