Production System : Production Systems

Decent Essays

Production system:- Production systems is a collaboration of workers, equipment and processes working together to manufacture a product. This system include the facilities where the factory and all the equipment in the company to manufacture a product comes under this category, the facilities also include the plant layout equipment etc.. Manufacturing support systems is part of production systems which include product design, manufacturing planning, manufacturing control and business functions. question 2) manufacturing systems is a system which include the integration and coordination of manual and automated workstations of an industry which uses material handling techniques to have good impact on manufacturing. A good example of this …show more content…

In this variety the products differentiate substantially ex:- difference between sedan car and SUV car Soft product variety :- In this variety where there will be some common parts, the proportion of common parts in assembled product will be in good number. ex:- the commonness between two different models of same model line of automobile like BMW sports line and luxury line. question 5) Processing operation makes a work material from one stage of completion to a more advanced stage that is close to final. It adds value by changing the dimensions, properties, or looks of the initial material. Assembly operation joins two or more components to create a new product. it 's more like joining initial processing operation products. question 6) (i) Qf = PQ = 100×1000 = 100,000 products/yr No of final assembly operations = 100,000 ops/yr No of processing operations Nof = PQnpnq = 100×1000×600×10 = 600,000,000 ops/yr (iii) Total processing operation time = (600 x 106 ops)(0.5 min./(60 min./hr)) = 5,000,000 hr/yr. Total assembly operation time = (100 x 103 ops)(3 hr/product) = 300,000 hr/yr Total processing and assembly time = 5,300,000 hr/yr At 2000 hours/yr per worker, w =(5,300,000 hr/yr)/(2000 hr/worker) = 2650 workers. (ii) With 1 worker per workstation for processing operations, n = w = 2500 = 2500 workstations. With 2 workers per stations for assembly, n = w/2 = 150/2 = 75 workstations. Total floor space A = (2575 stations)(200

Get Access