F104B Quiz Submitted2
.docx
keyboard_arrow_up
School
United States Military Academy *
*We aren’t endorsed by this school
Course
CGSC
Subject
Civil Engineering
Date
Apr 3, 2024
Type
docx
Pages
6
Uploaded by HighnessRose13103
QUESTION 1
1.
The __________ reflects the stages that organizations and their personnel and equipment will experience at one time or another (and often concurrently) during their service in the Army.
A
.
URS
B
.
AOLCM
C
.
TOE
D
.
FDU
10 points QUESTION 2
1.
The __________ phase of the force development process is where Total Army Analysis (TAA) takes place.
A
.
Determine Organizational Authorizations
B
.
Document Organizational Authorizations
C
.
Design Organizations
D
.
Develop Organizational Models
10 points QUESTION 3
1.
Which of the following term descriptions is NOT correct?
A
.
URS: When approved and resourced, the URS will become a modified table of organization and equipment (MTOE), the model which provides authorizations for the unit.
B
.
FDU: The primary method used by the Army to create new organizational designs and to change existing designs to overcome identified capability shortfalls that cannot be accommodated by doctrine, training leadership and education, or policy solutions.
C
.
TOE: A requirements document that prescribes the doctrinal wartime mission, the organizational structure, and the personnel and equipment requirements for a military unit and is the model for authorization documents.
D
.
BOIP: A requirements document that states the planned placement of quantities of new equipment and associated items of equipment and personnel.
10 points QUESTION 4
1.
The Army emphasis during force development phase __________ is to analyze the capability gap
from the DOTMLPF-P perspectives and to further refine concepts.
A
.
One
B
.
Two
C
.
Three
D
.
Six
10 points QUESTION 5
1.
All of the following stages are part of the Army Organizational Life Cycle Model (AOLCM), EXCEPT:
A
.
Training
B
.
Development
C
.
Force Management
D
.
Recruiting
10 points QUESTION 6
1.
Every division and above headquarters has a __________ that works force management. Use them.
A
.
Force Manager (FA50)
B
.
Director, Force Management (DFM)
C
.
Deputy Chief of Staff, G-4
D
.
G-3/5/7
10 points QUESTION 7
1.
Which assessment is an input along with current force structure and capability gaps in Phase I of the force development process that helps to identify capabilities for development?
A
.
Total Army Analysis (TAA)
B
.
Capabilities-Based Assessment (CBA)
C
.
Planning, Programming, Budgeting, and Execution (PPBE)
D
.
The Quadrennial Defense Review (QDR)
HQDA G-3/5/7 is responsible for integrating new capabilities, they typically conduct __________ analyses
twice in preparing a new organizational solution.
10 points QUESTION 8
1.
A
.
Force Design Directorate (FDD)
B
.
Force Design Update (FDU)
C
.
Force Integration Functional Area (FIFA)
D
.
Total Army (TA)
10 points QUESTION 9
1.
The __________ prescribe the correctly structured, equipped, trained, manned, sustained, deployed, stationed, and funded end state to be achieved at the culmination of modernization, as well as the required readiness level.
A
.
URS
B
.
TOE
C
.
MTOE
D
.
FIFA
10 points QUESTION 10
1.
The majority of all __________ and new __________ are centrally developed by the US Army Force Management Support Agency (USAFMSA).
A
.
TOEs, URSs
B
.
TOEs, FDUs
C
.
TOEs, BOIPs
D
.
TOEs, MTOEs
QUESTION 1
1.
The __________ prescribe the correctly structured, equipped, trained, manned, sustained, deployed, stationed, and funded end state to be achieved at the culmination of modernization, as well as the required readiness level.
A
.
URS
B
.
TOE
C
.
MTOE
D
.
FIFA
10 points QUESTION 2
1.
The following are the three principal questions of the force development process, EXCEPT:
A
.
What is my mission?
B
.
Who will do the work?
C
.
What must I have?
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
Related Questions
Q7.
Q8.
Q9.
Why manufacturing is considered a suitable industry for construction to use as a
guideline to improve the industry performance
A. Similar work process
B. Superiority of manufacturing industry
C. Manufacturing is an error free industry
D. All of the above
Which of the following is not true about the strategy that can be used to improve
construction industry performance
A. Using management philosophy from manufacturing industry
B. Be more focus on customer and end users' need
C. Using Design and Build procurement approach
D. Using partnering approach to support collaborative working environment
Which of the following is not consider as a tool in management from
manufacturing industry that can be adopted to improve construction industry
performance?
A.
B.
C.
D.
Quality Function Deployment
Concurrent Engineering
Quality Control System
Benchmarking
arrow_forward
Identify few areas of Operation Research applications in Civil Engineering works. Discus how Operation Research is being applied.
arrow_forward
Q#4:
Discuss the following terms briefly:
Emulsion breaking and Cutback curing,
Water bound and aggregate base,
Flexible pavement and Rigid pavements,
Cross slope and side slope of road,
Slope camber and barrel camber,
Perception time and reaction time,
Breast wall and retaining wall.
Subject: Transportation engneering 2
Note : plz give me to the point answer
arrow_forward
AE 2 ASSIGNMENT 1-M
1. A client is asking you to design a 4-storey residential building. He is choosing between a
reinforced concrete frame versus a steel frame for the skeletal frame of the building.
If you as the designer personally prefers steel construction. State two (2) ADVANTAGES of steel
construction (that were discussed) in hopes of convincing your client to opt for a steel frame. State
the reason why these are the two ADVANTAGES that you chose, give example for these
ADVANTAGES.
(Write your reasoning in paragraph form, it's best if you imagine reading your answer to your client
personally.)
2. Consider number 1. But this time you are against choosing steel construction over reinforced
concrete. State two (2) DISADVANTAGES of steel construction (that were discussed) in hopes of
convincing your client to NOT opt for a steel frame. State the reason why these are the two
DISADVANTAGES that you chose, give example for these DISADVANTAGES.
(Write your reasoning in paragraph form,…
arrow_forward
You have been asked to obtain an object/structure/component that has failed (It may come fromyour home, workshop, an automobile repair shop, a machine shop, and so on) and investigate to:1. Determine the cause and type of failure (i.e., simple fracture, fatigue, creep).2. What are the working and environmental conditions that causes the failure?3. Propose measures that can be taken to prevent future incidents of this type of failure.4. After you have determined the failure type of your case study, your leader asked you to writeshortly about the other mechanisms of failures.
arrow_forward
Method validation includes studies of precision and accuracy of a proposed method. How would you validate precision and accuracy?
arrow_forward
Task
A. High Level Analysis
B. Selection of Hardware Platform
C. Installation and Commissioning of hardware
D. Detailed Analysis of core modules
E. Detailed Analysis of supporting Modules
Programming of core modules
F.
G. Programming of supporting Modules
H. Quality Assurance of core modules
1. Quality Assurance of supporting Modules
J. Core module training
K. Development and QA of accounting Report
L. Development and QA of Management reporting
M. Development of Management Information System
N. Detailed Training
Duration Times are in days
5 days work per week (Saturdays and Sundays are day-off)
Create a Gantt Chart starting November 28, 2022.
Duration Prerequisite
1
1
2
2
2
2
3
1
1
1
1
1
1
1
A
B
A
D
D
E
F
G
C, H
E
E
L
I, J, K, M
arrow_forward
Q.4 (a) A new concrete bridge is to be constructed near the sea and its design has to incorporate features protecting it from exposure to marine environments. Among these, a new coating system is being proposed for concrete. You have been awarded a six-month contract to evaluate this system and materials involved. Describe the major parts of your programme, assuming that you also have access to a structure on which the coating has recently been used.
arrow_forward
Question 48
schedule is a schedule in which the resources for a project are assigned to activities so the activities can be closely monitored.
O resource-loaded
O time-loaded
A
look-ahead
O preliminary
amazon
Bcer
F12
Scr Lk
Artêtdéf
PrtSclimpréc
SysRg/Syst.
F4
F5
F6
F7
F8
F9
F10
F11
Bre
VA
arrow_forward
In the context of maintenance engineering, briefly explain the following terms:
Fault mode
Degradation
Severity level
Functional failure
• Causation of fault mode Relationship between reliability, availability and maintainability
arrow_forward
Answer the following:
Construction materials and testing civil engineering
What testing should be conducted in a project?
What materials to test in construction? And what are the laboratory test to be done?
Importance of Material Testing
arrow_forward
objectives
arrow_forward
conclusion for SMART Technology used in building construction
arrow_forward
You have been asked to select pipe for use within a chemical processing plant.
a) What information do you need to know from the process engineering department to select suitable pipe?
b) What information do you need to know from the civil structural engineering department to select suitable pipe?
c) What information do you need to know from the procurement department to select suitable pipe?
arrow_forward
- What is Computer-Aided Design or CAD?
- As Civil Engineering Students, what do you think the impact of using CAD or computer-based software in design and construction Industry today? Its significance and important changes.
- What are the Advantages using CAD software in the Design and Construction Industry. Give atleast 5 examples.
- Give some Disadvantages of CAD. Give atleast 5 examples.
arrow_forward
Hand/Power Tool Demonstration and Procedure for safety
Demonstrate the ability to identify hazards and potential hazards in the [Construction or General Industry] workplace and the means to avoid, control and/or prevent them.
arrow_forward
Please solve it ... note:: the subject is construction management
arrow_forward
Discuss the following terms briefly:
I. Water bound and aggregate base,
2. Cross slope and side slope of road,
3. Perception time and reaction time,
Subject: transportation engineering
arrow_forward
I need the answer as soon as possible
arrow_forward
Aim of the coursework
Identify and determine the scope of hazardous substances
Understanding the risk assessment procedure
Develop skills in recognizing hazards
Learning Outcomes
Identify and differentiate the kinds of hazardous substances.
Conduct hazard analysis
List simple safety procedures and precautions to save any process.
Task:
You are expected to carry out a risk assessment in your own college/lab/workshop.
Name of assessor – put any name.
Date – put any date of the assessment.
Time – put any time of the assessment.
Work area – briefly describe the work area in terms of function, size, number of floors, number of
people.
For example: Ground floor warehouse, 900 square metres with up to 50 people.
Task being assessed – Be specific, e.g. Use of forklift truck to move goods from loading bay to racking.
You need to select FOUR hazards that are not being adequately controlled.
Common hazards include:
Working at height (e.g. working at height on a ladder 3 metres high)
Manual…
arrow_forward
Emergency response during fires include the following except.
fire exits are ready but unchecked
B
prepare a fire alarm on every location
© agency contact numbers are ready
D seek medical treatment if hurt
E have an emergency fire extinguisher
Chemicals are found in many products used at construction sites. Workers may be exposed to dangerous chemicals during
construction activities. These include asbestos, lead, silica, carbon monoxide, and spray paints.
A) True
B
False
These are the benefits in controlling or preventing ergonomic hazards except.
A) absenteeism
B
increase productivity
increase morale
D fewer worker injuries
increased savings
arrow_forward
CE 103-Q#1
Answer the following questions.
1. What made you decide to become a civil engineer?
2. What kind of personality traits do you believe a civil engineer needs to be
successful?
3. What are the biggest challenges that you believe civil engineers face?
4. What is your process for testing the workability of concrete?
5. How much concrete do you need to fill 1800 sq.ft. of space?
6. Are you familiar with the various types of slump test indicators?
7. What do you believe should be the number-one priority for any civil engineer?
END- Goodluck
arrow_forward
A forensic engineer accepts a retainer from an attorney for a plaintiff and receives selected documentation from the attorney. Subsequently the engineer bills for work that includes a review of the case documentation. Still later, because of a disagreement with the attorney, the engineer ceases to perform the work
without delivering a report to the attorney and all of the documentation provided earlier. Several months later, the engineer is approached by the defense attorney's in the same case and accepts an assignment to function as an expert for the defense in the same legal dispute. Was it ethical for the engineer to accept
the new assignment?
OA.
Yes. Several months passed before she was approached by the defense attorneys.
O B. No. She did not have the consent of all concerned parties.
OC. Yes. She returned all moneys paid her.
O D. No. She drew no conclusions during her firs review of the material.
arrow_forward
Home-Work 1
Q1:- what is the function of the Substructure and Superstructure in the
Building.
Q2:- for the given building shown below determine the Substructure
and Superstructure of the Building
Roof
Second Floor
Ground Floor
arrow_forward
8) According to ASTM CI50, initial setting time needs to be longer than 45 minutes and
tmal setting time needs to be shorter than 375 minutes. Why does initial setting have a lower
(time) limit and final setting have an upper limit?
arrow_forward
4) The answer must be typed, avoid handwriting. The answer should be short and completely correct, I give a negative score to the answer that I feel is wrong; So please be careful, thank you.
arrow_forward
SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis (10th Edition)
Civil Engineering
ISBN:9780134610672
Author:Russell C. Hibbeler
Publisher:PEARSON
Principles of Foundation Engineering (MindTap Cou...
Civil Engineering
ISBN:9781337705028
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Cengage Learning
Fundamentals of Structural Analysis
Civil Engineering
ISBN:9780073398006
Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:McGraw-Hill Education
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning
Related Questions
- Q7. Q8. Q9. Why manufacturing is considered a suitable industry for construction to use as a guideline to improve the industry performance A. Similar work process B. Superiority of manufacturing industry C. Manufacturing is an error free industry D. All of the above Which of the following is not true about the strategy that can be used to improve construction industry performance A. Using management philosophy from manufacturing industry B. Be more focus on customer and end users' need C. Using Design and Build procurement approach D. Using partnering approach to support collaborative working environment Which of the following is not consider as a tool in management from manufacturing industry that can be adopted to improve construction industry performance? A. B. C. D. Quality Function Deployment Concurrent Engineering Quality Control System Benchmarkingarrow_forwardIdentify few areas of Operation Research applications in Civil Engineering works. Discus how Operation Research is being applied.arrow_forwardQ#4: Discuss the following terms briefly: Emulsion breaking and Cutback curing, Water bound and aggregate base, Flexible pavement and Rigid pavements, Cross slope and side slope of road, Slope camber and barrel camber, Perception time and reaction time, Breast wall and retaining wall. Subject: Transportation engneering 2 Note : plz give me to the point answerarrow_forward
- AE 2 ASSIGNMENT 1-M 1. A client is asking you to design a 4-storey residential building. He is choosing between a reinforced concrete frame versus a steel frame for the skeletal frame of the building. If you as the designer personally prefers steel construction. State two (2) ADVANTAGES of steel construction (that were discussed) in hopes of convincing your client to opt for a steel frame. State the reason why these are the two ADVANTAGES that you chose, give example for these ADVANTAGES. (Write your reasoning in paragraph form, it's best if you imagine reading your answer to your client personally.) 2. Consider number 1. But this time you are against choosing steel construction over reinforced concrete. State two (2) DISADVANTAGES of steel construction (that were discussed) in hopes of convincing your client to NOT opt for a steel frame. State the reason why these are the two DISADVANTAGES that you chose, give example for these DISADVANTAGES. (Write your reasoning in paragraph form,…arrow_forwardYou have been asked to obtain an object/structure/component that has failed (It may come fromyour home, workshop, an automobile repair shop, a machine shop, and so on) and investigate to:1. Determine the cause and type of failure (i.e., simple fracture, fatigue, creep).2. What are the working and environmental conditions that causes the failure?3. Propose measures that can be taken to prevent future incidents of this type of failure.4. After you have determined the failure type of your case study, your leader asked you to writeshortly about the other mechanisms of failures.arrow_forwardMethod validation includes studies of precision and accuracy of a proposed method. How would you validate precision and accuracy?arrow_forward
- Task A. High Level Analysis B. Selection of Hardware Platform C. Installation and Commissioning of hardware D. Detailed Analysis of core modules E. Detailed Analysis of supporting Modules Programming of core modules F. G. Programming of supporting Modules H. Quality Assurance of core modules 1. Quality Assurance of supporting Modules J. Core module training K. Development and QA of accounting Report L. Development and QA of Management reporting M. Development of Management Information System N. Detailed Training Duration Times are in days 5 days work per week (Saturdays and Sundays are day-off) Create a Gantt Chart starting November 28, 2022. Duration Prerequisite 1 1 2 2 2 2 3 1 1 1 1 1 1 1 A B A D D E F G C, H E E L I, J, K, Marrow_forwardQ.4 (a) A new concrete bridge is to be constructed near the sea and its design has to incorporate features protecting it from exposure to marine environments. Among these, a new coating system is being proposed for concrete. You have been awarded a six-month contract to evaluate this system and materials involved. Describe the major parts of your programme, assuming that you also have access to a structure on which the coating has recently been used.arrow_forwardQuestion 48 schedule is a schedule in which the resources for a project are assigned to activities so the activities can be closely monitored. O resource-loaded O time-loaded A look-ahead O preliminary amazon Bcer F12 Scr Lk Artêtdéf PrtSclimpréc SysRg/Syst. F4 F5 F6 F7 F8 F9 F10 F11 Bre VAarrow_forward
- In the context of maintenance engineering, briefly explain the following terms: Fault mode Degradation Severity level Functional failure • Causation of fault mode Relationship between reliability, availability and maintainabilityarrow_forwardAnswer the following: Construction materials and testing civil engineering What testing should be conducted in a project? What materials to test in construction? And what are the laboratory test to be done? Importance of Material Testingarrow_forwardobjectivesarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Structural Analysis (10th Edition)Civil EngineeringISBN:9780134610672Author:Russell C. HibbelerPublisher:PEARSONPrinciples of Foundation Engineering (MindTap Cou...Civil EngineeringISBN:9781337705028Author:Braja M. Das, Nagaratnam SivakuganPublisher:Cengage Learning
- Fundamentals of Structural AnalysisCivil EngineeringISBN:9780073398006Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel LanningPublisher:McGraw-Hill EducationTraffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Structural Analysis (10th Edition)
Civil Engineering
ISBN:9780134610672
Author:Russell C. Hibbeler
Publisher:PEARSON
Principles of Foundation Engineering (MindTap Cou...
Civil Engineering
ISBN:9781337705028
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Cengage Learning
Fundamentals of Structural Analysis
Civil Engineering
ISBN:9780073398006
Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:McGraw-Hill Education
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning