CPC40120/CPC50220 Module 1 – Assessment 2.2
Assessment Cover Sheet
The Cover Sheet must be completed before you start your assessment.
Student Surname
Mohseni azad
Student Given
Name
Payam
Qualification
CPC40120/CPC50220 CertIV/Diploma of Building and Construction (Building)
Module of Study
Module 1
Assessment Name
Activity 2.2 - Variations and client communications
Trainer Name
Alex Kubsch
Student Statement
Plagiarism is a form of cheating. It is taking and using someone else’s thoughts or writings and
representing them as your own. Plagiarism is a serious act and may result in a participant’s exclusion
from a Unit of Competency or a course. This in turn may require for students to pay to re-complete the
module or course at a later date. The following list outlines some of the activities for which a participant can be accused of plagiarism:
1.
Presenting any work by another individual as one’s own unintentionally
2.
Handing in assessments markedly similar to or copied from another student
3.
Presenting the work of another individual or group as their own work.
4.
Handing up assessments without the adequate acknowledgement of sources used, including assessments taken totally or in part from the internet.
Many of the workbook activities are ‘open book’ yet should still be conducted under test conditions
without consultation with other students. If you are unsure of any assessment requirements you should
check with your Trainer / Assessor.
By submitting this assessment electronically you declare that all work for assessment tasks submitted for
this assessment is your own with no part of any assessment being copied/plagiarised from another
person’s work, except where authorised and listed / referenced.
© House of Learning Pty Ltd
M1 – Activity 2.2 - Answer Sheet – V1.0| 08.07.2021 | Page 1 of 5
CPC40120/CPC50220 Module 1 – Assessment 2.2
Scenario - Leary Avenue, East Bentleigh
You will need to refer to this scenario for Activity 2.1 – Plans and Activity 2.2 – Variations and client
communications.
John and Joan Smith have engaged your services for the construction of their house, a two storey dwelling on
Leary Avenue in East Bentleigh. The contract documents have been signed and the site plans have been produced
externally by a surveyor.
For this scenario, you will need to refer to the following documentation:
PN33837 Leary Ave Plan Pack V2.0
PN33837 Leary Ave Project Documentation V2.0
Activity 2.1- Plans - Answer sheet V1.0
Prior to commencement of the project, you are required to review the project documentation and the plan pack in
order to ensure that you understand the documents before starting the construction process.
To complete the build, you are aware that you will need to contract different labourers to assist you with the
various stages of construction.
You are to work through the following tasks as part of the planning phase for this construction project.
PART A
Use this space
© House of Learning Pty Ltd
M1 – Activity 2.2 - Answer Sheet – V1.0| 08.07.2021 | Page 2 of 5
CPC40120/CPC50220 Module 1 – Assessment 2.2
PART A
Variations to the building requested by the
client (as listed in the contract)
Job Number and Sheet Number where
variation is identified
Under 300mm site fall over building
area.
Provide site fill to AHD42.352 as
required by council due to town
planning application.
NOTE: Includes supply & importation of
additional clean fill to site as required.
Job Number : 33837
Sheed Number : 3
1-2
Provide the following design changes
including :
-Provide 4500mm front setback in lieu
of 3500.
-Extend
kitchen
/family
1570mm[approx.] towards elevation C.
- Extend bed 1 / Rumpus
1570mm[approx.] towards elevation C.
Provide 2060mm x 1670mm bed 1 WIR
in lieu of 1560mm x 1670mm. Job Number: 33837
Sheed Number :4
1-2
Site classified P as per engineer site &
soil report.
Provide Class H concrete waffle pod
slab including wide edge beams,
additional/upgraded reinforcement &
bulk concrete bored piers in lieu of
standard as per engineers final waffle
pod slab design. Job Number: 33837
Sheed Number :6
1-2
© House of Learning Pty Ltd
M1 – Activity 2.2 - Answer Sheet – V1.0| 08.07.2021 | Page 3 of 5
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
Related Questions
3. (1) Define critical path, ES, EF, LS, LF, dummy activity and slack.
(2) Cables By Us is bringing a new product on line to be manufactured in their current facility in
existing space. The owners have identified 11 activities and their precedence relationships.
(a) Draw the network diagram of this project
(b) Calculate the project completion time
(c) Identify the critical path
日
OF 5
SONY
arrow_forward
The three basic stages of construction planning are:
(A) Preconstruction planning, post-construction planning, and legal review
(B) Pre-conceptual planning, preconstruction planning, and construction planning
(C) Pre-conceptual planning, conceptual planning, and post-conceptual planning
(D) Pre-construction planning, construction planning, and planning review
OD
O No answer text provided.
O No answer text provided.
O No answer text provided.
Question 2
arrow_forward
Given ann assessment on the role of the course in your education for CONSTRUCTION MATERIALS AND TESTING. No plagiarism and it must be not less than 10 sentences.
For strict compliance.
Thank you!
arrow_forward
1- Provide a brief response for each of the below case studies
2-State the code of fundamental canons of ethics, rules of practice and professional obligation.
3-write a brief conclusion for each case
CASE 1
Engineer A is a recently hired software engineer recruited from college by HyTechCo, a global software company. As part of his first assignment, Engineer A’s supervisor, Engineer B, requests that he write software to provide security for e-mailed documents within HyTechCo. After completing the project, Engineer A learns on an IT industry news Web site about an individual with another company who had made similar software available to overseas clients and was being investigated by the government because of U.S. laws that require that such software not be sent overseas because of national security concerns. Engineer A learns that the software he developed for HyTechCo has been sent overseas by HyTechCo’s IT department for use by HyTechCo’s offices abroad. Engineer A informs Engineer…
arrow_forward
OSHA Subject ( give sample answer ) 5 lines
arrow_forward
Please explain the photo attached
Topic: STANDARD OF PROFESSIONAL PRACTICE (SPP) ON CONSTRUCTION MANAGEMENT SERVICES
arrow_forward
One-page resume that can be used when you apply for your dream jobs after 3-4 years when you graduate in Civil Engineering.
arrow_forward
Can a graduate in civil engineering course sign plans and supervise construction projects, even though he/she did not pass the board exam? Explain.
arrow_forward
Activity List for a Reroofing Project
Activity Description
1 Mobilize
2 Set up scaffolding
3 Construct security barricades
4 Strip off old roofing
5 Repair damaged decking
6 Repair damaged cant strip
7 Replace sheet metal
8 Install felt roofing
9 Hot mop roof
10 Inspect roofing
11 Call for inspection
12 Remove scaffolding
13 Haul off roofing materials
14 Demobilize
Duration Days
Using the activity list provided above:
Draw a precedence diagram
1
2
1
3
2
1
1
1
2
1
1
2
2
1
*Under Predecessors, the following notation is used:
x/#: Activity x must finish # days before this activity can begin.
xSS/#: The # of days after activity x starts that this activity can begin.
xFF/#: This activity cannot finish until # days after x is completed.
XSF/#: This activity must finish # days before x can start.
Predecessors
1
2 SS/1
2,3
4 SS/1
4,5
5 SS/1
6,7
8
9
10 SF/3
10
6,7
12 FF/1, 13 FF/1
arrow_forward
Topics good for case study relating to construction safety and health
arrow_forward
Quality Engineering question
A Production Engineer working in Company A wants to maintain a Standard Operation Procedure (SOP) for the mobile phone assembly line and also monitor status of production (traveler). Please advise him the necessary documentation to do it and help him regarding the type of information the document and records should contain.
Please answer in your own words. please don't use handwriting. Thank you
arrow_forward
Write short notes on any two of the following:
PPRA
a)
b) DPR
arrow_forward
One-page resume that can be apply jobs for civil engineering after 3-4 years when you graduate in Civil Engineering
arrow_forward
Question 48
schedule is a schedule in which the resources for a project are assigned to activities so the activities can be closely monitored.
O resource-loaded
O time-loaded
A
look-ahead
O preliminary
amazon
Bcer
F12
Scr Lk
Artêtdéf
PrtSclimpréc
SysRg/Syst.
F4
F5
F6
F7
F8
F9
F10
F11
Bre
VA
arrow_forward
- Present a design proposal, utilising a selected alternative construction method, and explain how it is ‘fit for purpose’ in the given context.
- Present a design proposal that utilises alternative methods of construction.
arrow_forward
! I need a quick solution within 15 minutes With my best wishesTon
arrow_forward
Please explain the photo attached
Subject: Construction Management
arrow_forward
Using the same CPM diagram, what is the total project duration?
Immediate
Estimated
Activity
Activity Description
Predecessors
Duration
A
Excavate
2 weeks
Lay the foundation
Put up the rough wall
Put up the roof
Install the exterior plumbing
Install the interior plumbing
Put up the exterior siding
Do the exterior painting
B
A
4 weeks
C
10 weeks
D
C
6 weeks
4 weeks
5 weeks
7 weeks
9 weeks
7 weeks
8 weeks
4 weeks
E
C
F
E
G
D
E, G
Do the electrical work
F, I
Put up the wallboard
Install the flooring
Do the interior painting
Install the exterior fixtures
K
5 weeks
M
2 weeks
N
Install the interior fixtures
K, L
6 weeks
Total = 79 weeks
arrow_forward
pls answer ASAP
Why is safety management important? How will it affect the entire project construction? 10 points (Minimum of 100 words)
arrow_forward
Case Study Recommendations for Construction Safety and Health
arrow_forward
Engineering Management
arrow_forward
Of the items listed below, identify which components are included in a scope of
work?
A) A description of the work.
OB) Technical requirements
Oc) Identification of major components
OD) A detailed schedule
OE) Basis for the scope
OF) Work Breakdown Structure Deliverables
OG) List appropriate quality standards
OH) A list of project participants
1) Exclusions
OJ) Detailed description of the work.
arrow_forward
- Present a design proposal, utilising a selected alternative construction method, and explain how it is ‘fit for purpose’ in the given context.
1- Produce a design proposal, using computer-aided drawing tools, utilising alternative construction methods.
2- Present a design proposal that utilises alternative methods of construction.
3- Evaluate the effectiveness of using computer-aided drawing software and BIM.
4- Justify the use of a chosen alternative construction method.
arrow_forward
A practicing civil engineer attached his signature and seal on a set of construction plans and documents. However, on the day he attached his signature and seal, his professional license as a civil engineer has already expired the day before, and his application for renewal is still pending upon submission of some requirements for renewal. Is the signature and seal valid and acceptable? Explain.
arrow_forward
Give an example of a computation showing
the length of service (duration) of a
replacement in BAC (Bids and Awards
Committee) ( Subject: Construction
Engineering Project Management)
arrow_forward
Describe the procedure for ensuring that all tools and equipment are available prior to undertaking the activity.
arrow_forward
Construction-Management: i need the answer quickly,i need all the steps, clear and understandable handwriting, please.
arrow_forward
what is the document that identifies the documents and the specific preconstruction services that are to be performed.
a. AIA
b. RFP
c. short list
d. Award
arrow_forward
SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis (10th Edition)
Civil Engineering
ISBN:9780134610672
Author:Russell C. Hibbeler
Publisher:PEARSON
Principles of Foundation Engineering (MindTap Cou...
Civil Engineering
ISBN:9781337705028
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Cengage Learning
Fundamentals of Structural Analysis
Civil Engineering
ISBN:9780073398006
Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:McGraw-Hill Education
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning
Related Questions
- 3. (1) Define critical path, ES, EF, LS, LF, dummy activity and slack. (2) Cables By Us is bringing a new product on line to be manufactured in their current facility in existing space. The owners have identified 11 activities and their precedence relationships. (a) Draw the network diagram of this project (b) Calculate the project completion time (c) Identify the critical path 日 OF 5 SONYarrow_forwardThe three basic stages of construction planning are: (A) Preconstruction planning, post-construction planning, and legal review (B) Pre-conceptual planning, preconstruction planning, and construction planning (C) Pre-conceptual planning, conceptual planning, and post-conceptual planning (D) Pre-construction planning, construction planning, and planning review OD O No answer text provided. O No answer text provided. O No answer text provided. Question 2arrow_forwardGiven ann assessment on the role of the course in your education for CONSTRUCTION MATERIALS AND TESTING. No plagiarism and it must be not less than 10 sentences. For strict compliance. Thank you!arrow_forward
- 1- Provide a brief response for each of the below case studies 2-State the code of fundamental canons of ethics, rules of practice and professional obligation. 3-write a brief conclusion for each case CASE 1 Engineer A is a recently hired software engineer recruited from college by HyTechCo, a global software company. As part of his first assignment, Engineer A’s supervisor, Engineer B, requests that he write software to provide security for e-mailed documents within HyTechCo. After completing the project, Engineer A learns on an IT industry news Web site about an individual with another company who had made similar software available to overseas clients and was being investigated by the government because of U.S. laws that require that such software not be sent overseas because of national security concerns. Engineer A learns that the software he developed for HyTechCo has been sent overseas by HyTechCo’s IT department for use by HyTechCo’s offices abroad. Engineer A informs Engineer…arrow_forwardOSHA Subject ( give sample answer ) 5 linesarrow_forwardPlease explain the photo attached Topic: STANDARD OF PROFESSIONAL PRACTICE (SPP) ON CONSTRUCTION MANAGEMENT SERVICESarrow_forward
- One-page resume that can be used when you apply for your dream jobs after 3-4 years when you graduate in Civil Engineering.arrow_forwardCan a graduate in civil engineering course sign plans and supervise construction projects, even though he/she did not pass the board exam? Explain.arrow_forwardActivity List for a Reroofing Project Activity Description 1 Mobilize 2 Set up scaffolding 3 Construct security barricades 4 Strip off old roofing 5 Repair damaged decking 6 Repair damaged cant strip 7 Replace sheet metal 8 Install felt roofing 9 Hot mop roof 10 Inspect roofing 11 Call for inspection 12 Remove scaffolding 13 Haul off roofing materials 14 Demobilize Duration Days Using the activity list provided above: Draw a precedence diagram 1 2 1 3 2 1 1 1 2 1 1 2 2 1 *Under Predecessors, the following notation is used: x/#: Activity x must finish # days before this activity can begin. xSS/#: The # of days after activity x starts that this activity can begin. xFF/#: This activity cannot finish until # days after x is completed. XSF/#: This activity must finish # days before x can start. Predecessors 1 2 SS/1 2,3 4 SS/1 4,5 5 SS/1 6,7 8 9 10 SF/3 10 6,7 12 FF/1, 13 FF/1arrow_forward
- Topics good for case study relating to construction safety and healtharrow_forwardQuality Engineering question A Production Engineer working in Company A wants to maintain a Standard Operation Procedure (SOP) for the mobile phone assembly line and also monitor status of production (traveler). Please advise him the necessary documentation to do it and help him regarding the type of information the document and records should contain. Please answer in your own words. please don't use handwriting. Thank youarrow_forwardWrite short notes on any two of the following: PPRA a) b) DPRarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Structural Analysis (10th Edition)Civil EngineeringISBN:9780134610672Author:Russell C. HibbelerPublisher:PEARSONPrinciples of Foundation Engineering (MindTap Cou...Civil EngineeringISBN:9781337705028Author:Braja M. Das, Nagaratnam SivakuganPublisher:Cengage Learning
- Fundamentals of Structural AnalysisCivil EngineeringISBN:9780073398006Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel LanningPublisher:McGraw-Hill EducationTraffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Structural Analysis (10th Edition)
Civil Engineering
ISBN:9780134610672
Author:Russell C. Hibbeler
Publisher:PEARSON
Principles of Foundation Engineering (MindTap Cou...
Civil Engineering
ISBN:9781337705028
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Cengage Learning
Fundamentals of Structural Analysis
Civil Engineering
ISBN:9780073398006
Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:McGraw-Hill Education
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning