Whitaker
.docx
keyboard_arrow_up
School
Liberty University *
*We aren’t endorsed by this school
Course
345
Subject
Civil Engineering
Date
Apr 29, 2024
Type
docx
Pages
3
Uploaded by MagistrateHummingbird626
Whitaker EDUC 380
F
INAL
P
ROJECT
: S
ELF
-E
VALUATION
P
ART
1: R
UBRIC
Criteria
Levels of Achievement
Content
Advanced
Proficient
Developing
Not present
Points Earned
Following Final
Project:
Proposal
Assignment
22 to 24 points
Doing what was outlined in
Final Project: Proposal Assignment, notifying instructor if changes needed to be made.
17 to 21 points
Starting to take a different
turn than what was mentioned in the Final Project: Proposal Assignment.
1 to 16 points
Not following the Final Project: Proposal Assignment. Going in a different direction without notifying instructor.
0 points
Missing.
24
Demonstrates
SCRIP (Social
Responsibility,
Commitment,
Reflective
Practice,
Integrity,
Professionalism)
22 to 24 points
Reflects on each of the five areas.
17 to 21 points
Reflects on only three or four areas.
*I have only touched on 4
out of 5 SCRIP components. I am having a difficult time integrating
Integrity. 1 to 16 points
Does not reflect on any of the areas or only one or two are addressed.
0 points
Missing.
19
Conceptual
Framework
(Knows,
Implements,
20 to 22 points
Reflects on each of the three areas.
15 to 19 points
Reflects on only two areas.
1 to 14 points
Does not reflect on any of the areas or only one is addressed.
0 points
Missing.
22
Page 1
of 3
Whitaker EDUC 380
Believes)
Structure
Advanced
Proficient
Developing
Not present
Mechanics
14 to 15 points
Includes no grammatical or spelling errors.
11 to 13 points
Includes one to five grammatical or spelling errors.
*I have not finished editing all of the slides so there may still be spelling or grammatical errors.
1 to 10 points
Includes six or more grammatical or spelling errors.
0 points
Missing.
12
Research
Sources
14 to 15 points
Strong evidence of three or more sources well-used in project. References are documented in current APA style.
11 to 13 points
One or two sources cited, but not very evident in project. References are not documented in current
APA style.
1 to 10 points
No sources provided nor evident in the work of the project.
0 points
Missing.
15
Total Points
61
31
92/100
P
ART
2: R
EFLECTIVE
P
ARAGRAPH
Page 2
of 3
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
Related Questions
Internship Program Goals and Professional Plans of Civil Engineering Student (200-500 words)
arrow_forward
Write short notes on any two of the following:
PPRA
a)
b) DPR
arrow_forward
The three basic stages of construction planning are:
(A) Preconstruction planning, post-construction planning, and legal review
(B) Pre-conceptual planning, preconstruction planning, and construction planning
(C) Pre-conceptual planning, conceptual planning, and post-conceptual planning
(D) Pre-construction planning, construction planning, and planning review
OD
O No answer text provided.
O No answer text provided.
O No answer text provided.
Question 2
arrow_forward
One-page resume that can be apply jobs for civil engineering after 3-4 years when you graduate in Civil Engineering
arrow_forward
a. Identify the M222C Advance Math for CE course contents and how to achieve the stated purpose of this topic.
b. The overall conclusion of this course.
arrow_forward
Task
A. High Level Analysis
B. Selection of Hardware Platform
C. Installation and Commissioning of hardware
D. Detailed Analysis of core modules
E. Detailed Analysis of supporting Modules
Programming of core modules
F.
G. Programming of supporting Modules
H. Quality Assurance of core modules
1. Quality Assurance of supporting Modules
J. Core module training
K. Development and QA of accounting Report
L. Development and QA of Management reporting
M. Development of Management Information System
N. Detailed Training
Duration Times are in days
5 days work per week (Saturdays and Sundays are day-off)
Create a Gantt Chart starting November 28, 2022.
Duration Prerequisite
1
1
2
2
2
2
3
1
1
1
1
1
1
1
A
B
A
D
D
E
F
G
C, H
E
E
L
I, J, K, M
arrow_forward
Part 1: Take-home and Viva activity related to topics covered in LO1.
|You work as a mechanical software engineer in a mechanical company which provides modelling and
design services for different types of mechanical applications. Your main tasks are to analyze and assess
different designs and obtain optimal solutions prior to any prototyping or manufacturing step. Your
direct manager assigned you to work on specific tasks for different running projects.
Project 1:
Simply supported beams are usually used in structures due to their high stability and performance in resisting
shear stress and bending moment, they are applied in variety of applications such as steel-frame used for
advertisement cars' chassis and bridges. Your role in a structure design company is to analyze and design the
bridge based on simply supported beam theory. Your manager asked you to calculate the distribution of shear
force, bending moment and stress đue to bending for bridge modeled as simply supported beam…
arrow_forward
Assessment
Take it to your limit. Mastery is a must. Economy counts. As a carpenter,
VOu have to learn every detail of your endeavour. Re-check your learning.
Activity 5: Matching Type
Directions: Read each statement in column A and match it with the choices in
column B. Write the letter of your answer on the activity sheet.
Column A
Column B
10. an organic substance that supports a tree
11. the term used to describe wood once it's no
longer a part of a living tree.
12.a sawn timber or processed timber ready to
p. reusability
q. wood
r. lumber
s. detailed drawing
use
t. once
u. twice
v. hardwood
w. softwood
x. dressed timber
13. a complete sketch of a plan
14.“Measure twice and cut
15. also known as rough timber
16.from broad-leaved tree
y. sawn timber
z. dressing
17. plane and smooth timber
18. from needle-leaved tree
10.the simplest way of fixing two pieces of timber
together
11.other term for timber
aa.nails
bb. timber
cc. measurement
12. a method used in making plans.
13. the…
arrow_forward
One-page resume that can be used when you apply for your dream jobs after 3-4 years when you graduate in Civil Engineering.
arrow_forward
Please make a PERT CPM use the activity and duration below. Also use the format stated.
PLEASE DON'T ANSWER IF YOU DON'T KNOW HOW. Thank you.
arrow_forward
Question 48
schedule is a schedule in which the resources for a project are assigned to activities so the activities can be closely monitored.
O resource-loaded
O time-loaded
A
look-ahead
O preliminary
amazon
Bcer
F12
Scr Lk
Artêtdéf
PrtSclimpréc
SysRg/Syst.
F4
F5
F6
F7
F8
F9
F10
F11
Bre
VA
arrow_forward
4
arrow_forward
Given ann assessment on the role of the course in your education for CONSTRUCTION MATERIALS AND TESTING. No plagiarism and it must be not less than 10 sentences.
For strict compliance.
Thank you!
arrow_forward
pls answer ASAP
Why is safety management important? How will it affect the entire project construction? 10 points (Minimum of 100 words)
arrow_forward
Student Names:
Scheduling Construction Projects
Chapter 6
Fill in Graph
Color Critical Path Red
A
Activity ID
ES Duration EF
LS
TF
Act No.
LF
B
E
C
F
G
D
Activity #
Duration
ABCDEFC
5
5
10
25
15
5
G
10
arrow_forward
Write the five basic project planning steps when setting up a CPM Schedule?
arrow_forward
OSHA Subject ( give sample answer ) 5 lines
arrow_forward
Using the same CPM diagram, what is the total project duration?
Immediate
Estimated
Activity
Activity Description
Predecessors
Duration
A
Excavate
2 weeks
Lay the foundation
Put up the rough wall
Put up the roof
Install the exterior plumbing
Install the interior plumbing
Put up the exterior siding
Do the exterior painting
B
A
4 weeks
C
10 weeks
D
C
6 weeks
4 weeks
5 weeks
7 weeks
9 weeks
7 weeks
8 weeks
4 weeks
E
C
F
E
G
D
E, G
Do the electrical work
F, I
Put up the wallboard
Install the flooring
Do the interior painting
Install the exterior fixtures
K
5 weeks
M
2 weeks
N
Install the interior fixtures
K, L
6 weeks
Total = 79 weeks
arrow_forward
F3
C
The document typically marking the beginning of a project is called a
O Substantial start
Notice to proceed
4
$
Request for information
Substantial completion
1.8
F4
R
F
[
C
|| V
F5
%
5
T
G
F6
‹ CO
6
B
W
✈
F7
Y
H
&
7
F8
U
N
* 00
8
J
F9
M
019
9
F10
K
76°F Light rain
☀-
O
F11
9
$0
arrow_forward
Describe the procedure for ensuring that all tools and equipment are available prior to undertaking the activity.
arrow_forward
Edit
1.
2.
9:22 St
Instructions: In preparation for our first completion exam, solve this problem set. Write your solution on
bond paper with a border line and a 1 inch margin on all sides. Follow the format of the sample problem set.
Use engineering lettering and include FBD with a complete and proper label. Our first exam will be held on
October 1, 2022, from 1:00p.m. to 4:00p.m. The exam will cover the same topic as our problem set.
STATICS OF RIGID BODIES
PROBLEM SET NO. 1
300 lb
K
Three chains act on the bracket such that they create a resultant force having a magnitude of 500 lb. If
two of the chains are subjected to known forces, as shown, determine the angle of the third chain
measured clockwise from the positive x axis, so that the magnitude of the force F in this chain is a
minimum. All forces lie in the x-y plane. What is the magnitude of F? Hint: First find the resultant of the
two known forces. Forces F acts in this direction.
200 lb
Determine the magnitude of the…
arrow_forward
Please give correct answer. The answers presented are incorrect.
Subject is construction engineering
arrow_forward
topic: early childhood learning center
- design concept
arrow_forward
TASK:
QUALITY MANAGEMENT TOOLS
12th September 2024
QUALITY MANAGEMENT PLAN - INDUSTRIAL GARAGE
For the Industrial Garage Case Study (week 2) - prepare a high level quality management plan
outlining three key (for each component):
•
Quality Planning tools;
•
Quality Assurance tools; and
•
Quality Control tools
Try to keep cost/benefit considerations in mind when selecting your methods.
Note: Your plan is to address ONLY the construction phase through to project commissioning.
arrow_forward
You will design and implement a study plan for one unit you are currently studying. Study Plan and Schedule 1. Pick a unit (maths is suggested) 2. Self-assess your performance so far 3. Write a plan and schedule of study from next week until the end of semester for this unit that includes (Excel/Word/Gantt/draw.io/etc): a) For what duration and when you will study (times, what days of the week, include breaks) b) Specific detail on what and how you are going to study (what methods and tools and on what sessions — i.e. flashcards) 4. Conduct at least 2 study/revision sessions by next tutorial 5. Study according to plan! 6. Reflect and Optimise (apply best practice to your other units)
arrow_forward
only do part A
arrow_forward
Engineering Management
arrow_forward
What are the practical constraint?
arrow_forward
What is the project completion time?
a. 14 days
b. 12 days
c. 15 days
d. 13 days
When will fund raising activity end?
a. April 19
b. April 16
c. April 15
d. April 18
When will fund raising activity start?
a. April 15
b. April 13
c. April 14
d. April 18
arrow_forward
SEE MORE QUESTIONS
Recommended textbooks for you
Architectural Drafting and Design (MindTap Course...
Civil Engineering
ISBN:9781285165738
Author:Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:Cengage Learning
Related Questions
- Internship Program Goals and Professional Plans of Civil Engineering Student (200-500 words)arrow_forwardWrite short notes on any two of the following: PPRA a) b) DPRarrow_forwardThe three basic stages of construction planning are: (A) Preconstruction planning, post-construction planning, and legal review (B) Pre-conceptual planning, preconstruction planning, and construction planning (C) Pre-conceptual planning, conceptual planning, and post-conceptual planning (D) Pre-construction planning, construction planning, and planning review OD O No answer text provided. O No answer text provided. O No answer text provided. Question 2arrow_forward
- One-page resume that can be apply jobs for civil engineering after 3-4 years when you graduate in Civil Engineeringarrow_forwarda. Identify the M222C Advance Math for CE course contents and how to achieve the stated purpose of this topic. b. The overall conclusion of this course.arrow_forwardTask A. High Level Analysis B. Selection of Hardware Platform C. Installation and Commissioning of hardware D. Detailed Analysis of core modules E. Detailed Analysis of supporting Modules Programming of core modules F. G. Programming of supporting Modules H. Quality Assurance of core modules 1. Quality Assurance of supporting Modules J. Core module training K. Development and QA of accounting Report L. Development and QA of Management reporting M. Development of Management Information System N. Detailed Training Duration Times are in days 5 days work per week (Saturdays and Sundays are day-off) Create a Gantt Chart starting November 28, 2022. Duration Prerequisite 1 1 2 2 2 2 3 1 1 1 1 1 1 1 A B A D D E F G C, H E E L I, J, K, Marrow_forward
- Part 1: Take-home and Viva activity related to topics covered in LO1. |You work as a mechanical software engineer in a mechanical company which provides modelling and design services for different types of mechanical applications. Your main tasks are to analyze and assess different designs and obtain optimal solutions prior to any prototyping or manufacturing step. Your direct manager assigned you to work on specific tasks for different running projects. Project 1: Simply supported beams are usually used in structures due to their high stability and performance in resisting shear stress and bending moment, they are applied in variety of applications such as steel-frame used for advertisement cars' chassis and bridges. Your role in a structure design company is to analyze and design the bridge based on simply supported beam theory. Your manager asked you to calculate the distribution of shear force, bending moment and stress đue to bending for bridge modeled as simply supported beam…arrow_forwardAssessment Take it to your limit. Mastery is a must. Economy counts. As a carpenter, VOu have to learn every detail of your endeavour. Re-check your learning. Activity 5: Matching Type Directions: Read each statement in column A and match it with the choices in column B. Write the letter of your answer on the activity sheet. Column A Column B 10. an organic substance that supports a tree 11. the term used to describe wood once it's no longer a part of a living tree. 12.a sawn timber or processed timber ready to p. reusability q. wood r. lumber s. detailed drawing use t. once u. twice v. hardwood w. softwood x. dressed timber 13. a complete sketch of a plan 14.“Measure twice and cut 15. also known as rough timber 16.from broad-leaved tree y. sawn timber z. dressing 17. plane and smooth timber 18. from needle-leaved tree 10.the simplest way of fixing two pieces of timber together 11.other term for timber aa.nails bb. timber cc. measurement 12. a method used in making plans. 13. the…arrow_forwardOne-page resume that can be used when you apply for your dream jobs after 3-4 years when you graduate in Civil Engineering.arrow_forward
- Please make a PERT CPM use the activity and duration below. Also use the format stated. PLEASE DON'T ANSWER IF YOU DON'T KNOW HOW. Thank you.arrow_forwardQuestion 48 schedule is a schedule in which the resources for a project are assigned to activities so the activities can be closely monitored. O resource-loaded O time-loaded A look-ahead O preliminary amazon Bcer F12 Scr Lk Artêtdéf PrtSclimpréc SysRg/Syst. F4 F5 F6 F7 F8 F9 F10 F11 Bre VAarrow_forward4arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Architectural Drafting and Design (MindTap Course...Civil EngineeringISBN:9781285165738Author:Alan Jefferis, David A. Madsen, David P. MadsenPublisher:Cengage Learning
Architectural Drafting and Design (MindTap Course...
Civil Engineering
ISBN:9781285165738
Author:Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:Cengage Learning