Q: Stack parameters: Height = 75.0 m Diameter = 1.50 m Exit velocity = 12.0 m/s Temperature = 322°C Atm...
A:
Q: 2. Seismic Velocity Given the geophone data below, calculate the seismic wave velocity in each layer...
A: Prob 4: Step 1: Seismic velocity = distance/time V1= 10/8 = 1.25 ft/msec V2= 1.428 ft/msec V3= 1.25 ...
Q: PROBLEM 3 GIVEN: Parameters 14 in 28 in 84 kips 187 kips REQUIRED: The force-couple system shown act...
A:
Q: In your engineering survey course, your instructor put you in a group to help a transportation engin...
A:
Q: Consider the compound beam with segmentsAB and BCD joined by a pin connection(moment release) just r...
A: Given data:
Q: half-submerged in a tank of oil with a specific gravity of 0.82. Find the minimum weight of an ancho...
A:
Q: A curved line in a level surface all points of which are normal to the direction of gravity and equi...
A: To Determine Which of the given term is correct for the definition given.
Q: The 30-mm-diameter A-36 steel rod is subjected to the axial forces shown. Take E = 200 GPa. (Figure ...
A:
Q: Solve for the horizontal components of the force at pin B (See the Figure below). 3' 6' 5' 3' A 8' E...
A: To determine the horizontal component of reaction at B. In order to determine the reaction at pin ...
Q: A tensile load of 190 kN is applied to a round metal bar with a diameter of 16 mm and a gage length ...
A: Given: Tensile load=190 kN =190000N dia of bar=16mm ...
Q: Determine the Skempton's pore pressure parameter 'A' using the following values given in table below...
A: Given data, determine skemptom pore water pressure
Q: Given a compound curve I1=24 deg, I2=36 deg, D1=6 deg, D2=4 deg., Stationing PC is at 6+029.21. Com...
A: Given- I1=24o D1=6o I2=36o D1=4o Stationing PC is at 6+029.21
Q: 2: A ship is 200 m long. What is the range delay extent seen by a radar?
A:
Q: coarse aggregate with a nominal maximum size of 2 inches and dry rodded density of 110 lb/ft3 will b...
A: Given, Is a mix design for preparing concrete, wherein The coarse aggregate is having Nominal max s...
Q: truck makes a 14 trips per day. Calculate job TMPH for truck.
A: TMPH: - It stands ton mile per hour. It is used to analyze job done by vehicle like truck.
Q: 1. Determine the value of M1 if the system shown is equivalent to a single force acting at point C. ...
A:
Q: A tie bar 50 mm x 8 mm is to carry a load of 80 kN. A specimen of same quality steel of cross-sectio...
A: Given- Tie bar=50 mm×8 mmLoad=80 kNArea=250 mm2Maximum load=125 kN
Q: A saturated compressible clay layer of thickness h is sandwiched between two sand layers, as shown i...
A: Given-Thickness of clay layer=hpore water pressure, u=25 kPavertical stress,σ=150 kPaadditional vert...
Q: For a given section of road, relationship between speed and density is obtained as u = 53 – 0.43 k, ...
A:
Q: link traverse has been conducted between two temporary benchmarks of known elevation and includes an...
A: Step 1: BS IS FS Rise Fall RL 2.325 52.716 1.139 1...
Q: What is the application of Statistics in Civil Engineering? Give examples and Provide a thorough dis...
A: Statistics is a science that helps us make decisions and draw conclusions in the presence of variabi...
Q: b = 331 E = 186 KN.m. M = 6.5 KN.m. 420mm 1. Calculate the maximum tensile and compressive strength....
A:
Q: A steel tube is rigidly attached between an aluminum rod and a bronze rod as shown. The maximum P va...
A:
Q: A noise meter located at a distance of 30 m from a point source recorded 74 dB. The reading at a dis...
A: Given, Sound recorded at 1st location: L1 = 74dB Sound recorded at 2nd location: L2 = ?? Distance of...
Q: Verify the adequacy of W18x50 beam with a simple span of 10.00m Due to architectural limitations, th...
A: given data A W18x50 beam with a simple span of 10.00m dead load = 6.50 KN/m live load=10. 90KN/m F...
Q: Calculate the amount of soil that need to be excavated for wall footing that has a depth of (h). Foo...
A: Que:- Calculate the amount of soil that needs to be excavated for wall footing that has a depth of (...
Q: You were then told that the whole structure will be left exposed and unprotected from all sides. Giv...
A: For fire requirements in a building an extra cross section for fire requirements of the member must ...
Q: a circular curve is to be constructed with a 225 ft radius and an interior angle of 55 degree. deter...
A: The circular curve in surveying : To link intersecting straight lines, circular curves are employed ...
Q: 1. The observed interior angles of a triangle and their corresponding number of times measured are a...
A:
Q: A simply supported beam of span 8 m is carrying a uniformly distributed load of 4 kN/m over a length...
A: Given, A simply supported beam, Length = L = 8m
Q: The three consecutive readings taken from a level are 1.325 m, 0.985 m and 2.546 m. If the instrumen...
A: Given data, Three conseutive readings taken from a level are 1.325 m , 0.985 m and 2.546 m the inst...
Q: A square plate having one of its side equal to 3 meters is immersed in water surface in a vertical p...
A: Given : 3 m square plate Distance between center of pressure and center of gravity is 8 cm = 0.08 m
Q: Your team want to measure line AB but there is an obstruction on line. You set up two lines AC and C...
A: To find length of line AB,BD,AD
Q: A cylindrical drum of 1500 m diameter contains 1000 litres of water and is open at the top. Find the...
A: Introduction : When cylindrical vessel containing liquid rotating with its axis vertical then the li...
Q: An off highway truck weights 70,000 lb empty and 150,000 Ib when loaded. The weight distribution emp...
A: 1. When the truck is empty ; Total weight on front Tyre = Truck weights * Weight distribution empty ...
Q: Question Number 2 and 3 required hand calculation.
A:
Q: 24000-ton coal/day having 4.2% Sulphur and emits gases at velocity of 18.3 m/s and temperature 140 °...
A: Plume height (∆h): For Neutral conditions Holland’s Equation is often used ∆h=vsdu1.5+2.68×10-3×ρ∆T...
Q: PROBLEM 1: Determine the mass of the heaviest uniform bar that can be supported in the positic if th...
A: T=16kN X=1.1m To find mass of bar
Q: The inclined truss is subjected to two forces as shown. Determine the moments at A and B due to the ...
A: For the given inclined truss,
Q: Determine the Skempton's pore pressure parameter 'A' using the following values given in table below...
A:
Q: Determine the value of concentrated load that must be placed at the crown of a two hinged parabolic ...
A:
Q: What is the Nominal Shear Capacity of the following shear splice 3/4" A325N bolts W18x35 W24x55 F1 1...
A: Anb = 3.14 x (3/4)2 = 1.76625 sq inch fu = 105ksi FOS = 1.25
Q: A steel rod, circular in cross-section, tapers from 30 mm diameter to 15 mm diameter over a length o...
A:
Q: A retaining wall with a smooth vertical back retains a purely cohesive fill. Height of wall is 12 m....
A: The active pressure arises when the wall moves away from the backfill. The total active thrust actin...
Q: A wet sand sample has a volume of 4.64 x 10-4 m3 and weighs 8N. After oven-drying, the weight reduce...
A:
Q: A noise meter located at a distance of 30 m from a point source recorded 74 dB. The reading at a dis...
A:
Q: A steel rod, circular in cross-section, tapers from 30 mm diameter to 15 mm diameter over a length o...
A:
Q: In a hydraulic jump occurring in a horizontal channel, the Froude's number before the jump is 10.0 a...
A:
Q: A simple curve of the proposed highway extension have a direction of tangents AB due North and BC wi...
A:
Q: Determine the maximum uniformly distributed service live load that a 40 ft. cantilever beam can carr...
A: Solution: Given: Span = 40 ft ϕ = 0.9; fc=4,000 psi, and fy=60,000 psi. Thew total cross sectional a...
what resources are the primary target of "resource management"
Step by step
Solved in 2 steps
- Describe the Project Delivery System?5. Give 5 components of a Project Management Information System. 6. Give 4 key types of estimates.Quantity Surveyors routinely engage in unethical behaviour in the course of preparing payment certificates. Displays the potential unethical behaviours in preparing payment certificates.
- A schedule narrative can be used to O request an extension or further information from the owner plan the assignment of resources and costs conduct a sensitivity analysis highlight the effects that major changes have on the schedulePlease examine and provide solutionDescribe the project time management with the processes of time management?