Two cylinders act right after one another. Each cylinder is metered, and some actions are slow, and there is a dwell between some actions. What is the minimum flow rate required (CFM) to operate this cylinders? (enter answer with 2 decimal places) Sequence of operations: Cyl. A extends with metering (takes 1.5 second) Dwell time for 2 seconds for part machining Cyl. B extend and retracts without metering (2 second) Dwell time for 10 seconds while an electric mixer is operated Cyl. A retracts quicky with no metering (0.5 seconds) Dwell time for 5 seconds while a part is placed before next cycle Assuming the displacements of the cylinders are: Cyl. A DE = 65 in³ Cyl. A DR = 62 in³ Cyl. B DE 44 in³ Cyl. B DR = 41 in³

Precision Machining Technology (MindTap Course List)
2nd Edition
ISBN:9781285444543
Author:Peter J. Hoffman, Eric S. Hopewell, Brian Janes
Publisher:Peter J. Hoffman, Eric S. Hopewell, Brian Janes
Chapter8: Computer Numerical Control
Section8.3: Cnc Turning: Programming
Problem 7RQ: If a G1 code command is programmed partway through a machining operation, but no F-value is given in...
icon
Related questions
Question
Two cylinders act right after one another. Each cylinder is metered, and some actions are slow, and there is a dwell between some
actions. What is the minimum flow rate required (CFM) to operate this cylinders? (enter answer with 2 decimal places)
Sequence of operations:
Cyl. A extends with metering (takes 1.5 second)
Dwell time for 2 seconds for part machining
Cyl. B extend and retracts without metering (2 second)
Dwell time for 10 seconds while an electric mixer is operated
Cyl. A retracts quicky with no metering (0.5 seconds)
Dwell time for 5 seconds while a part is placed before next cycle
Assuming the displacements of the cylinders are:
Cyl. A DE 65 in³
=
Cyl. A DR = 62 in³
=
Cyl. B DE 44 in³
Cyl. B DR=41 in³
Transcribed Image Text:Two cylinders act right after one another. Each cylinder is metered, and some actions are slow, and there is a dwell between some actions. What is the minimum flow rate required (CFM) to operate this cylinders? (enter answer with 2 decimal places) Sequence of operations: Cyl. A extends with metering (takes 1.5 second) Dwell time for 2 seconds for part machining Cyl. B extend and retracts without metering (2 second) Dwell time for 10 seconds while an electric mixer is operated Cyl. A retracts quicky with no metering (0.5 seconds) Dwell time for 5 seconds while a part is placed before next cycle Assuming the displacements of the cylinders are: Cyl. A DE 65 in³ = Cyl. A DR = 62 in³ = Cyl. B DE 44 in³ Cyl. B DR=41 in³
Expert Solution
steps

Step by step

Solved in 4 steps with 2 images

Blurred answer
Knowledge Booster
Applied Fluid Mechanics
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, mechanical-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Precision Machining Technology (MindTap Course Li…
Precision Machining Technology (MindTap Course Li…
Mechanical Engineering
ISBN:
9781285444543
Author:
Peter J. Hoffman, Eric S. Hopewell, Brian Janes
Publisher:
Cengage Learning