manufacturing time, and each Lady-Sport engine requires 3 hours of manufacturing time. The Des Moines plant has 2100 hours of engine manufacturing time available for the next production period. Embassy's motorcycle frame supplier can supply as many EZ-Rider frames as needed. However, the Lady-Sport frame is more complex and the supplier can only provide up to 280 Lady-Sport frames for the next production period. Final assembly and testing requires 2 hours for each EZ-Rider model and 2.5 hours for each Lady-Sport model. A maximum of 1000 hours of assembly and testing time are available for the next production period. The company's accounting department projects a profit contribution of $2400 for each EZ-Rider produced and $1800 for each Lady-Sport produced. a. Formulate a linear programming model that can be used to determine the number of units of each model that should be produced in order to maximize the total contribution to profit. b. Solve the problem graphically. What is the optimal solution? c. Which constraints are binding? Embassy Motorcycles (EM) manufactures two lightweight motorcycles designed for easy handling and safety. The EZ-Rider model has a new engine and a low profile that make it easy to balance. The Lady-Sport model is slightly larger, uses a more traditional engine, and is specifically designed to appeal to women riders. Embassy produces the engines for both models at its Des Moines, Iowa, plant. Each EZ-Rider engine requires 6 hours of

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter12: Queueing Models
Section: Chapter Questions
Problem 59P
icon
Related questions
Question
manufacturing time, and each Lady-Sport engine requires 3 hours of manufacturing time.
The Des Moines plant has 2100 hours of engine manufacturing time available for the next
production period. Embassy's motorcycle frame supplier can supply as many EZ-Rider
frames as needed. However, the Lady-Sport frame is more complex and the supplier can
only provide up to 280 Lady-Sport frames for the next production period. Final assembly
and testing requires 2 hours for each EZ-Rider model and 2.5 hours for each Lady-Sport
model. A maximum of 1000 hours of assembly and testing time are available for the next
production period. The company's accounting department projects a profit contribution of
$2400 for each EZ-Rider produced and $1800 for each Lady-Sport produced.
a. Formulate a linear programming model that can be used to determine the number of units
of each model that should be produced in order to maximize the total contribution to profit.
b. Solve the problem graphically. What is the optimal solution?
c. Which constraints are binding?
Transcribed Image Text:manufacturing time, and each Lady-Sport engine requires 3 hours of manufacturing time. The Des Moines plant has 2100 hours of engine manufacturing time available for the next production period. Embassy's motorcycle frame supplier can supply as many EZ-Rider frames as needed. However, the Lady-Sport frame is more complex and the supplier can only provide up to 280 Lady-Sport frames for the next production period. Final assembly and testing requires 2 hours for each EZ-Rider model and 2.5 hours for each Lady-Sport model. A maximum of 1000 hours of assembly and testing time are available for the next production period. The company's accounting department projects a profit contribution of $2400 for each EZ-Rider produced and $1800 for each Lady-Sport produced. a. Formulate a linear programming model that can be used to determine the number of units of each model that should be produced in order to maximize the total contribution to profit. b. Solve the problem graphically. What is the optimal solution? c. Which constraints are binding?
Embassy Motorcycles (EM) manufactures two lightweight motorcycles designed for easy
handling and safety. The EZ-Rider model has a new engine and a low profile that make it
easy to balance. The Lady-Sport model is slightly larger, uses a more traditional engine,
and is specifically designed to appeal to women riders. Embassy produces the engines for
both models at its Des Moines, Iowa, plant. Each EZ-Rider engine requires 6 hours of
Transcribed Image Text:Embassy Motorcycles (EM) manufactures two lightweight motorcycles designed for easy handling and safety. The EZ-Rider model has a new engine and a low profile that make it easy to balance. The Lady-Sport model is slightly larger, uses a more traditional engine, and is specifically designed to appeal to women riders. Embassy produces the engines for both models at its Des Moines, Iowa, plant. Each EZ-Rider engine requires 6 hours of
AI-Generated Solution
AI-generated content may present inaccurate or offensive content that does not represent bartleby’s views.
steps

Unlock instant AI solutions

Tap the button
to generate a solution

Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,