A recurring maintenance job in a factory is being done by a three-man crew. Due to the nature of the job and space limitations, it was observed that two of the men were idle 37% of the time; one of the men was also idle an additional of the time, and at any given time only one man was required. The men were each paid P24.00 per hour. Each time the job was performed a set of tools and equipment with a value equivalent to P36.00 per hour was used. If the three-men crew could complete the work in 5 hours, which crew size would be the most economical
Q: For a certain company, the monthly percentages of all shipments received on time over the past 12…
A: MonthsShipment Monthly %180282384483584684785884982108311841283
Q: A committee in charge of promoting a Ladies Professional Golf Association tournament is trying to…
A: Find the given details below:
Q: respectively; A and C represents the locations of two coal users, with a demand of 8000t and 1600t…
A:
Q: The emergence of e-commerce has brought with it new challenges when doing business. One of these…
A: Shrinkwrap occurs when the license or an agreement governing a copyrighted work or a part thereof,…
Q: Mickey takes his seven cats to the pet salon for their weekly shampoo and styling. Experience has…
A: Find the given details below:
Q: Existing case study online: Resilience in Recovery: A journey through the value chain of wood:…
A: Project management is the branch of management that deals with organizing and overseeing the…
Q: a. Determine how to meet demands for the next two months (on time) at minimum cost. Assume that 100…
A: During month 1 and 2 with the regular and overtime labor The objective for minimization the cost…
Q: 60. Consider the following product structure. B(1) A) 3 40 C) 70 D) 60 E) 110 A C (1) D (2) E (1) F…
A: Product structure is the hierarchical representation of the finished product and the components…
Q: Dave Fletcher was able to determine the activity times for constructing his laser scanning machine.…
A: Project management is important for the project manager so that all the activities have to be…
Q: Barbara Flynn's company has compiled the data below on a small set of products. Based on the…
A: ItemAnnual DemandUnit costA5090B75140C150100D50070E40090
Q: Which number correctly identifies the Feasible Region? List the appropriate Extreme Points based on…
A: First, let me show the LP formulation, Here, I will solve the given LP using the Graphical method,
Q: If 22 units of the end item are to be assembled, how many additional units of E are needed? (Hint…
A: Here, I am given the table data, where for each item, I am given the lead time and amount on hand…
Q: The Chiemsee Knee Replacement Clinic (CKRC) is a sports clinic located at the northern edge of the…
A: Capacity management helps the organization in identifying as well as fulfilling the IT capacity…
Q: Question Explain five activities Cavendish University team has undertaken as part of its systematic…
A: Business Environment refers to external variables or pressures that may be impacting upon how a…
Q: Batman runs a produce stand in an inner-city neighborhood. With the recent layoff in he community,…
A: Community development refers to the active involvement and cooperation between members of a…
Q: L. Houts Plastics is a large manufacturer of injection-molded plastics in North Carolina. An…
A: The A-B-C approach classifies inventory items according to some measure of importance, usually…
Q: __________ provides insights into how manufacturing automation is expected to evolve in the future.…
A: Manufacturing is an important process in an organization. It facilitates the conversion of raw…
Q: Ford Motor Company had realized returns of 5%, 15%, -10%, and -5% over four quarters. What is the…
A: QuarterReturn percentage15%215%3-10%4-5%For the given data, I will determine the quarterly standard…
Q: The Johnny Ho Manufacturing Company in Columbus, Ohio, is putting out fou The unit-manufacturing…
A: Manufacturing cost is the total cost of all assets consumed during the time spent making a…
Q: The Ostrya Virginiana furniture company produces wooden chairs. The demand for chairs is 500 units…
A: Monthly demand5000Production rate100Setup costs300Holding cost12number of days30
Q: Complete the table of observed responses to the question "Should legislative pay be cut for every…
A: In the context of the Western New York survey:Democrats: Individuals affiliated with the Democratic…
Q: A supplier has three plants (A, B and C) with available capacity of 100, 50 and 200 units…
A:
Q: If you use data from months 1-6 to obtain the regression line y - 60x +8, what is your forecast for…
A: The technique of guessing or projecting future occurrences, patterns, or results based on historical…
Q: A manufacturer of disk drives for notebook computers wants a MTBF of at least 50,000 hours. Recent…
A: Let me state the given data,
Q: Location decision often depends on the type of business. Which of the following is NOT correct? O…
A: Location decision is a critical strategic decision for any business. It involves selecting a…
Q: a) What is the highest annual dollar volume for any one item? S (enter your response as a whole…
A:
Q: 7-3. Nowjuice, Inc., produces Shakewell fruit juice. A planner has developed an aggregate forecast…
A: Given information to develop aggregate plans:Regular production cost: $10.00 per caseRegular…
Q: The gross requirements for Item X are specified for the beginning of weeks 1 through 8 in the table…
A: MRP shows the quantity and timing of materials required for production MRP Table:Consider…
Q: Janet's Bouquets stocks fresh-cut flower bouquets on a weekly basis that sell for $60 each and have…
A: 5 demand states are possible-75,80,85,90,95Similarly we can have 5 order quantities=75,80,85,90,95
Q: a) The correct activity on node network diagram is shown in Figure 2 Figure 1 Figure 3
A:
Q: Determine whether it is best for you to continue manufacturing the part or purchase it from the…
A: Let me state the given data,
Q: The following table gives the number of pints of type A blood used at Woodlawn Hospital in the past…
A: Forecasting is a process that predict the future demand using available past actual information. The…
Q: Read the case study below and answer the questions that follow. Supply chain strain: China’s COVID…
A: By leveraging the expertise and economies of scale of external providers, businesses can reduce…
Q: The critical path a. | b. The minimum project duration a. a. . The amount of slack for each activity
A: A network diagram is a graphical representation of a network, depicting the network's components and…
Q: determine the forecasts for the first four months of 2024 (January, February, March, and April)…
A: MonthSalesJan51Feb55Mar54Apr57May50Jun68Jul66Aug59Sep67Oct69Nov75Dec77
Q: cy Ships deploys hospital ships to combat several overwhelming statistics. The first statistic is…
A: JOB SequencingFCFS –jobs arranged from earliest to latest in terms of arrival(in numerical order)Job…
Q: Why are international assignments important to global organisations?
A: Global organizations have a physical presence in various nations, with subsidiaries, branches, or…
Q: There are four fare classes on a flight with the following rates: Y: $800 B: $500 M: $350 T:…
A: The EMSR (Expected Marginal Seat Revenue) is a metric used in airline revenue management to…
Q: Grave City is considering the relocation of several police substations to obtain better enforcement…
A: Find the given details below:
Q: What are workplace flexibility issues that women face within Organization? Write in Essay from
A: Organizations consist of several employees who work together to fulfill organizational goals. It is…
Q: How can AI-driven manufacturing processes be designed to minimize environmental impact, optimize…
A: Artificial Intelligence (AI) has emerged as a transformative technology in various sectors,…
Q: Q2: A company invested an amount of $85,000 to implement a project, and the expected receipts from…
A: IRR (Internal Rate of Return)- The discount rate that results in a zero NPV for the project.-shows…
Q: Transporting Coal. The Calcio Coal Company produces coal at four mines and ships it to four power…
A: Find the given details below:
Q: Annual physical inventories usually do not require shutdown of production facility. O True O False
A: Annual physical inventories are typically conducted without the need for a shutdown of the entire…
Q: Data Collection and Perception of a Situation 1) Data and analysis are important to use in many…
A: “Since you have posted multiple questions, we will provide the solution only to the first question…
Q: Ten weeks of data on the Commodity Futures Index are 7.36, 7.41, 7.56, 7.57, 7.61, 7.53, 7.53, 7.71,…
A: Find the given details below:
Q: A firm is attempting to minimize its shipping costs. The firm has 3 factories and must supply the…
A: FactoryCustomer 1Customer 2Customer 3CapacityA61214170B111113110C10119170Requirement22575150
Q: What type of pattern exists in the data? b. Develop a three-week moving average for this time…
A: First, let me state the given data, WeekValue118215316413517616For the given data, first, I will…
Q: "There is a short-term and frequent representation of Patients in the emergency department" Address…
A: Plan-Do-Study-Act (PDSA) model of improvement framework has proven to be effective when implemented…
Q: product has a fixed dail
A:
A recurring maintenance job in a factory is being done by a three-man crew. Due to the nature of the job and space limitations, it was observed that two of the men were idle 37% of the time; one of the men was also idle an additional of the time, and at any given time only one man was required. The men were each paid P24.00 per hour. Each time the job was performed a set of tools and equipment with a value equivalent to P36.00 per hour was used. If the three-men crew could complete the work in 5 hours, which crew size would be the most economical
Step by step
Solved in 3 steps with 9 images
- A company that makes shopping carts for supermarkets and other stores recently purchased somenew equipment that reduces the labor content of the jobs needed to produce the shopping carts.Prior to buying the new equipment, the company used five workers, who produced an average of80 carts per hour. Workers receive $10 per hour, and machine cost was $40 per hour. With the newequipment, it was possible to transfer one of the workers to another department, and equipment costincreased by $10 per hour while output increased by four carts per hour.a. Compute labor productivity under each system. Use carts per worker per hour as the measure oflabor productivity.A company that makes shopping carts for supermarkets and other stores recently purchased somenew equipment that reduces the labor content of the jobs needed to produce the shopping carts.Prior to buying the new equipment, the company used five workers, who produced an average of80 carts per hour. Workers receive $10 per hour, and machine cost was $40 per hour. With the newequipment, it was possible to transfer one of the workers to another department, and equipment costincreased by $10 per hour while output increased by four carts per hour.a. Compute labor productivity under each system. Use carts per worker per hour as the measure oflabor productivity.b. Compute the multifactor productivity under each system. Use carts per dollar cost (labor plusequipment) as the measure.c. Comment on the changes in productivity according to the two measures, and on which one youbelieve is the more pertinent for this situation..A team of 10 unloaders is employed in good reception bay of a large warehouse. During an 8 hour day 40 lorries arrive and it takes the team 10 minutes to unload each lorry. Each team member is paid RM3 per hour and it costs RM10 per hour to keep lorries waiting. Studies show that increasing the team to 14 men would reduce the unloading time to 7 minutes. Would it be worthwhile increasing the team to 14?
- Tica (Pty) Limited manufactures and sells combined fax and telephone answering machines. In order to tender for a specific contract, the technical team of the company has developed a new model called FINO. To date, two units of FINO have been manufactured and are being used as demonstration models. The following information is available: Direct labour hours taken to manufacture the first two units: Hours First unit 60 Second unit 48 The following average direct variable costs relate to the manufacture of the first two units of FINO: R/unit Material 620 Labour 440Variable overheads 324 1384 · Since the first two units were manufactured, material costs have increased by 10% and labour costs by 5%. · Variable overheads – variable per…1. A company that makes shopping carts for supermarkets and other stores recently purchased some new equipment that reduces the labor content of the jobs needed to produce the shopping carts. Prior to buying the new equipment, the company used five workers, who produced an average of 100 carts per hour. Workers receive $20 per hour, and machine cost was $50 per hour. With the new equipment, it was possible to transfer one of the workers to another department, and equipment cost increased by $10 per hour while output increased by four carts per hour. a. Compute labor productivity under each system. Use carts per worker per hour as the measure of labor productivity. b. Compute the multifactor productivity under each system. Use carts per dollar cost (labor plus equipment) as the measure. Comment on the changes in productivity according to the two measures, and on which one you believe is the more pertinent for this situation. C.Jefferson Company's demand for its only product exceeds its manufacturing capacity. The company provided the following information for the machine whose limited capacity is prohibiting the company from producing and selling additional units. 4,900 minutes 7,000 minutes 3.8 units per minute 4.0 units per minute 15,827 units 18,620 units Actual run time this week Machine time available per week Actual run rate this week Ideal run rate Defect-free output this week Total output this week (including defects) Required: 1. Compute the utilization rate. (Round your answer to 2 decimal places.) 2. Compute the efficiency rate. (Round your answer to 2 decimal places.) 3. Compute the quality rate. (Round your answer to 2 decimal places.) 4. Compute the overall equipment effectiveness (OEE). (Do not round intermediate calculations. Round your final answer to 3 decimal places.) Utilization rate Efficiency rate Quality rate Overall equipment effectiveness
- A) A company using material requirement planning (MRP) with no safety begins to safety lead times on manufactured items. Which of the following results is likely to occur? Lot sizes will go up Lot sizes will go down Work-in-process (WIP) will go up Work-in-process (WIP) will go down B) A customer requests an order of 100 units in Period 1. The master schedule for the items indicates an available to promise (ATP) of 85 for period 1. Which of the following approaches is the most appropriate course of action? Increase the master production schedule (MPS) quantity in period 1 by 15 units Promise the 100 units and then check on component availability. Promise the 85 units in period 1 and the remaining 15 units in the next possible ATP period. Promise the 100 units by removing 15 from another customer order a smaller revenue value C) An organization has seen inventory increase every month for the past year. And financial performance has not met expectations. Which of the following…A company that makes a product recently purchased some new equipment that reduces the labor content of the jobs needed to produce the product. Prior to buying the new equipment, the company used six workers, who produced an average of 90 units per hour. Workers receive P35 per hour and machine cost was P2,000 per hour. With the new equipment, it was possible to transfer one of the workers to another department, and equipment cost increased by P500 per hour while output increased by four units per hour. Compute labor productivity under each system. Use units per worker per hour as the measure of labor productivity.A company that makes a product recently purchased some new equipment that reduces the labor content of the jobs needed to produce the product. Prior to buying the new equipment, the company used six workers, who produced an average of 90 units per hour. Workers receive P35 per hour and machine cost was P2,000 per hour. With the new equipment, it was possible to transfer one of the workers to another department, and equipment cost increased by P500 per hour while output increased by four units per hour. Compute the multifactor productivity under each system. Use units per peso cost (labor plus equipment) as the measure.
- For the production of part R-193, two operations are being considered. The capital investment associated with each operation is identical. Operation 1 produces 2,100 parts per hour. After each hour, the tooling must be adjusted by the machine operator. This adjustment takes 15 minutes. The machine operator for Operation 1 is paid $24 per hour (this includes fringe benefits). Operation 2 produces 2,350 parts per hour, but the tooling needs to be adjusted by the operator only once every two hours. This adjustment takes 45 minutes. The machine operator for Operation 2 is paid $13 per hour (this includes fringe benefits). Assume an 8-hour workday. Further assume that all parts produced can be sold for $0.35 each. a. Should Operation 1 or Operation 2 be recommended? b. What is the basic tradeoff in this problem?A machine shop manufactures two types of bolts. The bolts require time on each of the three groups of machines, but the time required on each group differs, as shown in the table below. Type I Type IIMachine 1 0.2 min 0.2 minMachine 2 0.6 min 0.2 minMachine 3 0.04 min. 0.08 min Production schedules are made up one day at a time. In a day, 300, 720, and 100 minutes are available, respectively, on these machines. Type I bolts sell for 15¢ and type II bolts for 20¢. (a) How many of each type of bolt should be manufactured per day to maximize revenue?(b) What is the maximum revenue?(c) Suppose the selling price of type I bolts began to increase. Beyond what amount would this price have to increase before a different number of each type of bolts should be produced to maximize revenue?PLEASE ANSWER URGENTLY AND SHOW ALL CALCULATIONS QUESTION It takes a cycle of 12 minutes to mould 50 defect-free standard bricks plus 1 minute to adjust the machine for a brick-making machine operated by two machine operators paid R70/hr each. Another lower-capacity machine also takes 12 minutes to mould the bricks plus 36 seconds to adjust the machine, to produce 25 standard bricks operated by one operator paid R100 per hour. If both machines are operated 8 hours a day and a standard brick is sold at R2.00, determine which process should be selected?