Two generating units are online and have the following characteristics: U₁(Gas Fired) F₁($/day) = 200+20 x P₁ +0.006× P2100MW ≤ P₁ ≤ 900MW U₂(Coal Fired) Q₂ (tons/day) = 100+2× P₂ +0.001 × P100MW ≤ P₂ ≤ 700MW Unit 1 is operating normally while unit 2 is operating under a take-or-pay fuel contract. If the total load is 800 MW for a period of one week (7 days), and for y= 7.5$/ton,, the quantity consumed unit 2 in one week is: Select one: O a. 1471.6 tons b. 10301.2 tons c. None of these d. 8830 tons

Power System Analysis and Design (MindTap Course List)
6th Edition
ISBN:9781305632134
Author:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Chapter2: Fundamentals
Section: Chapter Questions
Problem 2.16P: A single-phase, 120V(rms),60Hz source supplies power to a series R-L circuit consisting of R=10 and...
icon
Related questions
Question
Two generating units are online and have the following characteristics:
U₁(Gas Fired) F₁($/day) = 200+20 x P₁ +0.006× P2100MW ≤ P ≤ 900MW
U₂(Coal Fired) Q₂ (tons/day) = 100 +2 x P₂ +0.001 × P²100MW ≤ P₂ ≤ 700MW
Unit 1 is operating normally while unit 2 is operating under a take-or-pay fuel contract.
If the total load is 800 MW for a period of one week (7 days), and for y= 7.5$/ton,, the quantity consumed unit 2 in one week is:
Select one:
O a. 1471.6 tons
b. 10301.2 tons
c. None of these
d. 8830 tons
Transcribed Image Text:Two generating units are online and have the following characteristics: U₁(Gas Fired) F₁($/day) = 200+20 x P₁ +0.006× P2100MW ≤ P ≤ 900MW U₂(Coal Fired) Q₂ (tons/day) = 100 +2 x P₂ +0.001 × P²100MW ≤ P₂ ≤ 700MW Unit 1 is operating normally while unit 2 is operating under a take-or-pay fuel contract. If the total load is 800 MW for a period of one week (7 days), and for y= 7.5$/ton,, the quantity consumed unit 2 in one week is: Select one: O a. 1471.6 tons b. 10301.2 tons c. None of these d. 8830 tons
Expert Solution
steps

Step by step

Solved in 5 steps

Blurred answer
Knowledge Booster
Types of Power Station and Its Characteristics
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Power System Analysis and Design (MindTap Course …
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning
Electricity for Refrigeration, Heating, and Air C…
Electricity for Refrigeration, Heating, and Air C…
Mechanical Engineering
ISBN:
9781337399128
Author:
Russell E. Smith
Publisher:
Cengage Learning