The City Commission of Nashville has decided to build a botanical garden and picnic area in the heart of the city for the recreation of its citizens. The precedence table for all the activities required to construct this area successfully is as follows: Code Description A BCDEFGH C D Find location; determine resource requirements Requisition of lumber and sand H I Dig and grade Saw lumber into appropriate sizes Position lumber in correct locations F Nail lumber together G Put sand in and under the equipment Put dirt around the equipment Put grass all over the garden, landscape, paint Time (hrs) 20 60 100 35 20 10 20 5 30 Immediate Predecessor(s) None A << D, C F- G, H Refer to the legend for the activity that corresponds to each code. Using the line drawing tool, draw a Gantt chart for activities E through I of the project. ***
Q: What is the sample mean, sample standard deviation, minimum, and maximum of the total time in the…
A: Since there are multiple questions being asked. We will answer the first questions, which still…
Q: 1. Problem: If a car driven 50,000 miles, how much would be the maintenance cost? 2. Use Linear…
A: Given-
Q: Question: How does Anna balance demand and capacity by doing a special on bagels from 2 to 4 pm?
A: Anna balances demand and capacity by doing a special on bagels from 2 to 4 pm in several ways: By…
Q: In what sequence would the jobs be ranked according to the fol- lowing rules: (a) FCFS, (b) EDD, (c)…
A: Job sequencing is an important concept in the field of operations research. It involves the…
Q: A company wishes to produce two types of souvenirs: Type A and Type B. Each Type A souvenir will…
A: Maximize profit = 0.80 A + 1.60 B subject to 2A + 1B <= 3x 60 minutes 1A + 3B <= 5x60…
Q: The feasible region and the path taken by Phase I and Phase II to reach the optimal point are shown…
A: Linear programming is a mathematical technique that is commonly used in the operations management…
Q: Weighted-average costs per equivalent unit are $2 for direct materials and $3 for conversion. There…
A: Given: Direct materials 2 Conversion 3 Goods completed 10000 Ending inventory 1000
Q: Solve the following exercise using dynamic programming: a company distributes an article with a…
A: Dear Student please mention exact criteria to be calculated. Assuming cost minimization:-…
Q: Six new staff have been appointed by ABC store as sales people. Below is a table showing the number…
A: “Since you have posted a question with multiple sub parts, we will provide the solution only to the…
Q: What are the international transport modes? Identify the criteria that a company might consider to…
A: Business is a very vast field where many processes are executed simultaneously to provide a good…
Q: Upper Control Limit (UCLx) =
A: Control charts are also known as process-behavior charts. It is a statistical process that helps in…
Q: Green Capital, Inc. (GC) is a small investment banking firm that specializes in securing funds for…
A: Find the Given details below: Activity Predecessor Optimistic Time(To) a(Week) Pessimistic…
Q: a-b) One of the possible assignment of tasks to workstations is shown correctly in Fig. 2. The…
A: The cycle time is given as 11 mins. To find out which activity belongs to which workstation we start…
Q: Please put the data in excel , or at least try to do so. --------- Company Z has the following…
A:
Q: Due to a sudden increase in students applying for civil engineering courses, the University of…
A: The University of Greenfields wants to expand its civil engineering department due to an increase in…
Q: Kuantan ATV, Inc. assembles five different models of all-terrain vehicles (ATVs) from various…
A: The supplier with lowest cost will be chosen. The value might change wrt the number of days…
Q: In the context of Business Performance Management, please explain the value of meeting business…
A: Meeting business requirements is essential for an organization's success in the context of business…
Q: Office applications are often called productivitytools. Why?
A: By knowing the fundamentals of operations management the owners, students, and interns will get a…
Q: Lower Control Limit (LCLx) = 12.179412.1794 inches (round your response to four decimal…
A: Formulae used: Centre line of the X bar chart = Average of the X bar chart Control limit of the X…
Q: Explain the relationship between planning and management of resources and the performance of the…
A: To explain: The relationship between planning and management of resources and the performance of the…
Q: The cement additive, Tuf should not contain more than 70% of Lime and the cement additive, Rok must…
A:
Q: Given the following data, use exponential smoothing (a=0.10) to develop a demand forecast. Assume…
A: Exponential smoothing is time series method which uses for forecasting univariate time series data.…
Q: What precisely is the purpose of doing a technical analysis? Explain not just how and why it is used…
A: Meaning of Technical Analysis Technical analysis is a device or technique, used to foresee the…
Q: Cite some sources of nonlinearities that arise in the three components of problem formulation.
A: Nonlinearities can occur in the three components of problem formulation which are: objective…
Q: hello I need help with number 13 please and I need it only in excel
A: Product Structure tree: a. Develop a master schedule for this revised plan. (Leave no cells blank -…
Q: With examples, discuss how companies adopting sustainable methods of production and marketing can…
A: Sustainable marketing is the strategic promotion of environmentally and socially responsible…
Q: What elements of Shortest Job First Scheduling and Priority Scheduling are comparable?
A: In Shortest Job First Scheduling the processes are executed on the basis of their burst times, that…
Q: Calculate the minimum cost of crashing by 2 weeks.
A: To solve this, we need to first find the critical path for the Activity Network. Critical path is…
Q: 4. Construct a Gantt chart to represent the various activities of the project with a date. The…
A: Find the Given details below: Activity Predecessor Optimistic Time(To) a(Week) Pessimistic…
Q: Problem 5-12 A manager must decide how many machines of a certain type to purchase. Each machine can…
A: Given- Machine capacity = 100 customers/dayOne Machine Fixed cost = $2100 per dayTwo Machine Fixed…
Q: a) Design a reorder point system using the 99% probability of being in stock and (i) state the…
A: Since there are more than 10 questions, we will answer only first 3. For others please submit as…
Q: For the given data, the x = enter your response here inches (round your response to four decimal…
A: For the given dataset, I could see that there is a total of twelve samples, the number of…
Q: Upper Control Limit (UCLx) = inches (round your response to four decimal places). LCL R =…
A: X-bar and R-bar control charts are two of the most common tools used for quality control in…
Q: onal companies considering cultural differences when engaging in Foreign Direct Investment.
A: For developing and rising market nations, foreign direct investment (FDI) is essential. To grow,…
Q: Upper Control Limit (UCLx) =
A: For the given dataset, we could see the sample size or the number of subgroups=4 there are a total…
Q: Provide an explanation of the methods and resources that constitute the foundation of information…
A: Methods and Resources that constitute the foundation of information technology project management:…
Q: Technology Trends in Services, except for: As humans travel globally they carry and spread disease…
A: NOTE: We are allowed to do one question only. Technology is transforming the way services are…
Q: a-b) One of the possible assignment of tasks to workstations is shown correctly in Fig. 2 The…
A: Project schedule helps in calculating different values all related to the production cycle like the…
Q: I need a Business Plan including the executive summary and so forth for a day Care business.
A: Executive Summary : There are many families who are become dependent on child care industry.…
Q: Reverse auctions Multiple Choice O put downward pressure on prices. have an increasing number of…
A: A reverse auction process is based on the system of procurement, where in sellers must fulfill the…
Q: The G&E Company is preparing a bid to build the new 47,000-seat Shoreline baseball stadium. The…
A: 1. During forward pass in case of more than two preceding activities the early start will be…
Q: Rather to outsourcing the development of a new system, why shouldn't Petrie's staff do it…
A: Introduction- The above-given question is of Jim Watanabe, the project manager, at Petrie…
Q: You are given a linear programming problem. Maximize P = 6x + 4y subject to 2x + 3y ≤ 12…
A: Given LP- Maximize P = 6x + 4ySubject to-2x + 3y≤ 12 (Resource 1)2x + y≤ 8 (Resource 2)x, y≥ 0
Q: At a small but growing airport, the local airline company is purchasing a new tractor for a…
A:
Q: Consider the following from an estate agent business: Month Houses Sold Jan…
A: Note: - Since all the questions are different from each other and they are not subparts, we will…
Q: Sampling 4 pieces of precision-cut wire (to be used in computer assembly) every hour for the past…
A: Given-
Q: Is it possible that lean management overlooks certain factors that contribute to a thriving…
A: By raising the value of the items and processes, the form of Lean management seeks to maximise…
Q: Look for a sample healthcare project charter document on the Internet from the Univerisity of…
A: ANSWER : A sample healthcare project charter document from the University of Michigan on their site…
Q: ou have recently gained your APM Risk qualification and have been asked to join the University’s…
A: 1. List 5 Stakeholders in the project: Government Contactors & Subcontractors, Top Management…
Q: QUESTION 2: The Advanced Tech Company has a project to design an integrated information database for…
A: Path Duration Is duration maximum critical A-C-E-F 6+3+6+2 = 17 yes yes B-C-E-F 4+3+6+2 = 15 no…
Trending now
This is a popular solution!
Step by step
Solved in 4 steps with 5 images
- The City Commission of Nashville has decided to build a botanical garden and picnic area in the heart of the city for the recreation of its citizens. The precedence table for all the activities required to construct this area successfully is as follows: Code Description Time (hrs) Immediate Predecessor(s) A Find location; determine resource requirements 20 None B Requisition of lumber and sand 55 A C Dig and grade 100 A D Saw lumber into appropriate sizes 35 B E Position lumber in correct locations 25 D, C F Nail lumber together 5 E G Put sand in and under the equipment 20 F H Put dirt around the equipment 10 F I Put grass all over the garden, landscape, paint 35 G, H Refer to the legend LOADING... for the activity that corresponds to each code. Part 2 Using the line drawing tool, draw a…The City Commission of Nashville has decided to build a botanical garden and picnic area in the heart of the city for the recreation of its citizens. The precedence table for all the activities required to construct this area successfully is as follows: Code A B с D E F G H I Description Find location; determine resource requirements Requisition of lumber and sand Dig and grade Saw lumber into appropriate sizes Position lumber in correct locations Time (hrs) 20 60 100 30 20 10 20 10 30 Nail lumber together Put sand in and under the equipment Put dirt around the equipment Put grass all over the garden, landscape, paint Refer to the legend for the activity that corresponds to each code. Using the line drawing tool, draw a Gantt chart for activites E through I of the project. Immediate Predecessor(s) None A A B D, C E F F G, H A B C- D- E F G H- H 0 20 40 60 80 100 120 140 160 180 200 Q ✔The City Commission of Nashville has decided to build a botanical garden and picnic area in the heart of the city for the recreation of its citizens. The precedence table for all the activities required to construct this area successfully is as follows: Code Description Time (hrs) Immediate Predecessor(s) A Find location; determine resource requirements 15 None B Requisition of lumber and sand 60 A C Dig and grade 100 A D Saw lumber into appropriate sizes 30 B E Position lumber in correct locations 20 D, C F Nail lumber together 5 E G Put sand in and under the equipment 25 F H Put dirt around the equipment 10 F I Put grass all over the garden, landscape, paint 35 G, H Refer to the legend Code Activity A Planning B Purchasing C Excavation D Sawing E…
- Roy Creasey Enterprises, a machine shop, is planningto move to a new, larger location. The new building will be 60 feetlong by 40 feet wide. Creasey envisions the building as having sixdistinct production areas, roughly equal in size. He feels stronglyabout safety and intends to have marked pathways throughoutthe building to facilitate the movement of people and materials.See the following building schematic. His foreman has completed a month-long study of the number ofloads of material that have moved from one process to another inthe current building. Tllis information is contained in the following flow matrix. Finally, Creasey has developed the following matrix to indicatedistances between the work areas shown in the building schematic. What is the appropriate layout of the…155) The Marionettes Company is noted for an exceptionally impressive line of Mardi Gras masks. Marionettes has established the following selling and distribution support activity-cost pools and their corresponding activity drivers for the year 2010: Activity Cost Cost Driver Marketing $30 000 $500 000 of sales Customer service 10 000 5000 customer Order execution 5000 100 orders Warehousing 5000 50 product lines Required: a. Determine the activity-cost-driver rate for each of the four selling and distribution activities. b. Under what circumstances is it appropriate to use each of the activity-cost drivers? c. Describe at least one possible negative behavioural consequence for each of the four activity-cost drivers. 156) For each of the following activities identify an appropriate activity-cost driver. a. machine maintenance b. machine setup c. quality control d. material ordering e. production scheduling f.…1. Selecting a manufacturing facility or service providers 2. Part (a) should be supported with justification on why it is selected. 3. Discuss the steps required for the layout design of the facility. 4. Study the layout design of the existing systems. 5. Study the layout design of the suggested systems. 6. Suggest on the mechanism of improving the layout design.
- A company needs to rebalance a product layout for producing new plastic license plates. They plan to use the assembly line six hours in order to meet projected demand of 2,160 license plates each day. The following table describes the tasks involved in the production of this product: Without regard to projected demand, what is the maximum possible cycle time for this assembly line? Task Time (secs) Immediate Predecessor a 3 none b 4 none c 5 a,b d 7 none e 9 c,d15.12 Tigers Sports Club has to select four separate co-ed doubles teams to participate in an inter-club table tennis tourna- ment. The pre-selection results in the selection of a group of four men Raul, Jack, Gray, and Ajay-and four women-Barbara, Dona, Stella, and Jackie. Now, the task ahead lies in pairing these men and women in the best fashion. The table below shows a matrix that has been designed for this purpose, indicating how each of the men complements the game of each of the women. A higher score indicates a higher degree of compatibility in the games of the two individuals concerned. Find the best pairs. Game Compatibility Matrix BARBARA DONA STELLA JACKIE Raul 30 20 10 40 Jack 70 10 60 70 Gray 40 20 50 40 Ajay 60 70 30 90 PXLine balancing As the Operations Manager of Shane Manufacturing Ltd., you are given the task to balance the assembly line that is used to produce a special type of toy. a. Develop your own scenario (quantitative example) of this line balancing problem. Include all relevant information. b. Draw the precedence diagram for the problem that you set up in part “a" above. c. Use the example that you set up to demonstrate how you will balance the line. d. Calculate the efficiency of the line.
- 1. ART Contractors must locate an equipment staging area to serve three construction sites, located at coordinates (2, 2), (1, 4), and (5, 5). Noteshaper Quick Start Question #14) a. If traffic between the staging area and the first two construction sites (2,2) and (1,4) is 50 trips per week and the traffic between the staging area and the construction area at (5,5) is 20 trips per week, what is the best coordinates for theequipment staging area?The City Commission of Nashville has decided to build a botanical garden and picnic area in the heart of the city for the recreation of its citizens. The precedence table for all the activities required to construct this area successfully is as follows: A- Time B- Code Description (hrs) Immediate Predecessor(s) C- A Find location; determine resource requirements 25 None Requisition of lumber and sand Dig and grade Saw lumber into appropriate sizes 55 A D- C 100 A E- 30 В E Position lumber in correct locations 20 D, C F- F Nail lumber together 10 E G- Put sand in and under the equipment Put dirt around the equipment G 25 F H F H- Put grass all over the garden, landscape, paint 35 G, H Refer to the legend for the activity that corresponds to each code. Using the line drawing tool, draw a Gantt chart for activities E through I of the project. 20 40 60 80 100 120 140 160 180 200 220What is a precedence diagramand what are its various components? Briefly explain.