Table Q2: Result of Standard Proctor Test Mass of wet soil in the mold (kg) Moisture content (%) 1.68 9.9 1.71 10.6 1.77 12.1 1.83 13.8 1.86 15.1 1.88 17.4 1.87 19.4 1.85 21.2

Principles of Geotechnical Engineering (MindTap Course List)
9th Edition
ISBN:9781305970939
Author:Braja M. Das, Khaled Sobhan
Publisher:Braja M. Das, Khaled Sobhan
Chapter4: Plasticity And Structure Of Soil
Section: Chapter Questions
Problem 4.5P: The following data were obtained by conducting liquid limit and plastic limit tests on a soil...
icon
Related questions
Question
Table Q2: Result of Standard Proctor Test
Mass of wet soil in the mold
Moisture content
(kg)
(%)
1.68
9.9
1.71
10.6
1.77
12.1
1.83
13.8
1.86
15.1
1.88
17.4
1.87
19.4
1.85
21.2
Transcribed Image Text:Table Q2: Result of Standard Proctor Test Mass of wet soil in the mold Moisture content (kg) (%) 1.68 9.9 1.71 10.6 1.77 12.1 1.83 13.8 1.86 15.1 1.88 17.4 1.87 19.4 1.85 21.2
(b) A soil sample was taken from a site of a proposed borrow pits and sent to the UTHM
laboratory for a Standard Proctor test. Given the volume of proctor mold is 943.3cm³
and the results of the test are as recorded in Table Q2.
(i) From the data given, examine the appropriate method of analysis to determine
the compaction parameter. Discuss the moisture range permitted from your
investigation, if contractor must achieve 95% relative compaction.
(ii) A field density test for the soil describe in Q2 obtained the moisture content
10.5% and moist density 1705kg/m³. Determine the relative compaction
Transcribed Image Text:(b) A soil sample was taken from a site of a proposed borrow pits and sent to the UTHM laboratory for a Standard Proctor test. Given the volume of proctor mold is 943.3cm³ and the results of the test are as recorded in Table Q2. (i) From the data given, examine the appropriate method of analysis to determine the compaction parameter. Discuss the moisture range permitted from your investigation, if contractor must achieve 95% relative compaction. (ii) A field density test for the soil describe in Q2 obtained the moisture content 10.5% and moist density 1705kg/m³. Determine the relative compaction
Expert Solution
steps

Step by step

Solved in 3 steps with 1 images

Blurred answer
Knowledge Booster
Soil engineering for highway design
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Principles of Geotechnical Engineering (MindTap C…
Principles of Geotechnical Engineering (MindTap C…
Civil Engineering
ISBN:
9781305970939
Author:
Braja M. Das, Khaled Sobhan
Publisher:
Cengage Learning