Please USE 3.0 instead of 2.5 for the rolling terrain. Thanks! 6.20 A divided multilane highway in a recreational area has four lanes (two lanes in each direction) and is on rolling terrain. The highway has 10-ft lanes with a 6-ft right-side shoulder and a 3-ft left-side shoulder. The posted speed is 50 mi/h. Previously, there were 4 access points per mile, but recent development has increased the number of access points to 12 per mile. Before development, the peak- hour factor was 0.95 and the directional hourly volume was 2200 vehicles with 13% heavy vehicles. After development, the peak-hour directional flow is 2600 vehicles with the same vehicle percentages and peak-hour factor. What is the level of service before and after the development?

Traffic and Highway Engineering
5th Edition
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Garber, Nicholas J.
Chapter9: Capacity And Level Of Service For Highway Segments
Section: Chapter Questions
Problem 16P
icon
Related questions
Question
Please USE 3.0 instead of 2.5 for the rolling terrain.
Thanks!
6.20 A divided multilane highway in a recreational
area has four lanes (two lanes in each direction) and
is on rolling terrain. The highway has 10-ft lanes
with a 6-ft right-side shoulder and a 3-ft left-side
shoulder. The posted speed is 50 mi/h. Previously,
there were 4 access points per mile, but recent
development has increased the number of access
points to 12 per mile. Before development, the peak-
hour factor was 0.95 and the directional hourly
volume was 2200 vehicles with 13% heavy vehicles.
After development, the peak-hour directional flow is
2600 vehicles with the same vehicle percentages and
peak-hour factor. What is the level of service before
and after the development?
Transcribed Image Text:Please USE 3.0 instead of 2.5 for the rolling terrain. Thanks! 6.20 A divided multilane highway in a recreational area has four lanes (two lanes in each direction) and is on rolling terrain. The highway has 10-ft lanes with a 6-ft right-side shoulder and a 3-ft left-side shoulder. The posted speed is 50 mi/h. Previously, there were 4 access points per mile, but recent development has increased the number of access points to 12 per mile. Before development, the peak- hour factor was 0.95 and the directional hourly volume was 2200 vehicles with 13% heavy vehicles. After development, the peak-hour directional flow is 2600 vehicles with the same vehicle percentages and peak-hour factor. What is the level of service before and after the development?
Expert Solution
steps

Step by step

Solved in 4 steps

Blurred answer
Knowledge Booster
Geometric design of highway facilities
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning