Low Ball Construction Co. has determined that the heaviest load to be lifted on one of its projects weighs 22,000 lbs. From the tower crane location on the building site, the required reach for this lift will be 100 ft. The crane is equipped with an L7 jib and a four-part hoist line (Table 16.3 load chart). This critical lift is of a piece of mechanical equipment and will require a 1,000-lb spreader bar attached to a 200-lb set of slings. If assembled in the proposed configuration, can the crane safely make the pick?

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
TABLE 16.3 Lifting capacities in pounds for a tower crane (continued)
Jib model
L1
L2
L3
Maximum
hook reach
Lifting capacities
in pounds,
four-part line
Counterweights
Jib
100' 9"
119' 9"
55,200
55,200
55,200
55,200 55,200 55,200
55,200 55,200 55,200
55,200 55,200
105-HP hoist unit AC
165-HP hoist unit AC
138' 9"
34,600 34,600
30,700
L1
37,200 lb
34,000 lb
L4
157' 9"
55,200
55,200 55,200
L2
176' 9"
55,200 55,200
55,200 55,200
47,600 lb
44,000 lb
L5
55,200 55,200 55,200 55,200
51,300
48,300
55,200 55,200 55,200 50,700 47,100 44,600
46,200 46,200 46,200
42,800 39,700
37,400
39,400
39,400
39,400
36,500
34,100
31,900
55,200
55,200
34,600 31,900 29,700 27,700
30,700 30,700 28,200 26,100 24,100
27,800
27,800
25,400
25,400 23,200 21,300
23,100 21,100 19,300
21,300
19,400
17,600
16,400
L3
50,800 lb
47,600 lb
L6
195' 9"
55,200
55,200
55,200 55,200
55,200 51,400
51,500
48,500
L4
37,200 lb
34,000 lb
17,800 16,300
16,200 14,700
15,100 13,800
26,100
22,600
25,600 23,600 21,700 20,300
19,600 18,300
17,700 16,400
15,100
13,600
12,700
13,600 12,400
12,900
L7
214' 9"
L5
40,800 lb
40,800 lb
45,600
42,100
35,200
29,900
11,400
11,800 10,800
11,500 10,600
10,700
9,800
10,200
9,300
9,100
8,300
8,100
L6
44,000 lb
40,800 lb
Hook
reach
13' 6"
48' 9"
51' 0"
53' 6"
56' 6"
60' 6"
70' 0"
80' 0"
90' 0"
100' 9"
110' 0"
119' 9"
130' 0"
138' 9"
150' 0"
157' 9"
170' 0"
176' 9"
180' 0"
190' 0"
195' 9"
200' 0"
210' 0"
214' 9"
L7
54,400 lb
54,800 lb
Transcribed Image Text:TABLE 16.3 Lifting capacities in pounds for a tower crane (continued) Jib model L1 L2 L3 Maximum hook reach Lifting capacities in pounds, four-part line Counterweights Jib 100' 9" 119' 9" 55,200 55,200 55,200 55,200 55,200 55,200 55,200 55,200 55,200 55,200 55,200 105-HP hoist unit AC 165-HP hoist unit AC 138' 9" 34,600 34,600 30,700 L1 37,200 lb 34,000 lb L4 157' 9" 55,200 55,200 55,200 L2 176' 9" 55,200 55,200 55,200 55,200 47,600 lb 44,000 lb L5 55,200 55,200 55,200 55,200 51,300 48,300 55,200 55,200 55,200 50,700 47,100 44,600 46,200 46,200 46,200 42,800 39,700 37,400 39,400 39,400 39,400 36,500 34,100 31,900 55,200 55,200 34,600 31,900 29,700 27,700 30,700 30,700 28,200 26,100 24,100 27,800 27,800 25,400 25,400 23,200 21,300 23,100 21,100 19,300 21,300 19,400 17,600 16,400 L3 50,800 lb 47,600 lb L6 195' 9" 55,200 55,200 55,200 55,200 55,200 51,400 51,500 48,500 L4 37,200 lb 34,000 lb 17,800 16,300 16,200 14,700 15,100 13,800 26,100 22,600 25,600 23,600 21,700 20,300 19,600 18,300 17,700 16,400 15,100 13,600 12,700 13,600 12,400 12,900 L7 214' 9" L5 40,800 lb 40,800 lb 45,600 42,100 35,200 29,900 11,400 11,800 10,800 11,500 10,600 10,700 9,800 10,200 9,300 9,100 8,300 8,100 L6 44,000 lb 40,800 lb Hook reach 13' 6" 48' 9" 51' 0" 53' 6" 56' 6" 60' 6" 70' 0" 80' 0" 90' 0" 100' 9" 110' 0" 119' 9" 130' 0" 138' 9" 150' 0" 157' 9" 170' 0" 176' 9" 180' 0" 190' 0" 195' 9" 200' 0" 210' 0" 214' 9" L7 54,400 lb 54,800 lb
Low Ball Construction Co. has determined that the heaviest load to be
lifted on one of its projects weighs 22,000 lbs. From the tower crane
location on the building site, the required reach for this lift will be 100 ft.
The crane is equipped with an L7 jib and a four-part hoist line (Table 16.3
load chart). This critical lift is of a piece of mechanical equipment and
will require a 1,000-lb spreader bar attached to a 200-lb set of slings. If
assembled in the proposed configuration, can the crane safely make the
pick?
Sintom
Transcribed Image Text:Low Ball Construction Co. has determined that the heaviest load to be lifted on one of its projects weighs 22,000 lbs. From the tower crane location on the building site, the required reach for this lift will be 100 ft. The crane is equipped with an L7 jib and a four-part hoist line (Table 16.3 load chart). This critical lift is of a piece of mechanical equipment and will require a 1,000-lb spreader bar attached to a 200-lb set of slings. If assembled in the proposed configuration, can the crane safely make the pick? Sintom
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps

Blurred answer
Knowledge Booster
Management of materials
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning