Given the standard times associated with six sequential operations, calculate the efficiency of the assembly line: Operation Standard Minutes 1 0.54 2 1.32 3 2.40 4 0.88 5 1.35 6 0.97
Q: An assembly plant for the Blood Pressure RX, a portable blood pressure device, has 400 minutes…
A: Given - Task Performance Time (minutes) Task Must Follow Task Listed Below A 4 -…
Q: Stanford Rosenberg Computing wants to establish an assembly line for producing a new product, the…
A: Task Time (in sec) Immediate predecessor A 11 - B 15 A C 7 A D 4…
Q: 1. An assembly line with 17 tasks is to be balanced. The longest task is 2.4 minutes, and the total…
A: Given data, Longest Task = 2.4 minutes Total time for all task = 18 minutes Operating Time = 450…
Q: An electricity power plant was redesigned so that the old system consisting of a single large…
A: Here in the given case the main agenda was the issue regarding the new system of workstation where…
Q: The cost of improving the plant layout is $50,000 to be depreciated over a three-year period. The…
A: Given, Cost of improving the plant layout is $50000 and is depreciated over 3 year period. Annual…
Q: How does technology influence process selection? How may layout decisions be influenced by…
A: The selection of processes is described as how an organization chooses to produce its services or…
Q: 2. Determine the theoretical minimum number of workstations. 3. Balance this assembly line using the…
A: Cycle time refers to the actual time that is spent on the production of a particular item, counted…
Q: There are several effects on process selection, one of which is that technological. In terms of…
A: Changes in computer-related technology and associated skills have a big impact on how you choose…
Q: An assembly line must be designed to produce 40 containers per hour. The following data give the…
A: Given data, TASK IMMEDIATE PREDECESSOR TASK TIME (sec) A None 60 B A 12 C B 35 D A 55 E…
Q: You have started your own business. Please explain your Business with a detail Operational Diagram…
A: Excellence and magnificence items have consistently discovered a great crowd and keep on being well…
Q: Sue Helms Appliances wants to establish an assembly line to manufacture its new product, the Micro…
A: Given details: Activity Performance time(min) A 10 B 12 C 8 D 7 E…
Q: From the following table calculate and identify the Total distance travelled per month for layout A…
A: Given data: Products Products per month (load/units) Distance per product (feet) Layout…
Q: The following information is given about an assembly line. The desired output rate is 360 units per…
A: Given Information: Task Time (sec) Immediate Predecessor(s) A 30 - B 25 A…
Q: From the following table calculate and identify the Total distance travelled for per month for…
A: Load distance method is a mathematical model used to evaluate the locations based on weighted…
Q: Given in the following table are the tasks necessary forfinal assembly of a hospital bed, the length…
A:
Q: Francis Johnson's plant needs to design an efficient assembly line to make a new product. The…
A: This Line balancing Problem, it falls under Business- Operations Management, For this problem, I…
Q: What are the trade-offs that occur when a process layout is used? What are the trade-offs that…
A: Process layout benefits from high flexibility to be able to produce a variety of products, while…
Q: Describe the process employed in Layout planning for a Luxury Clothing Retail Store in a Mall. Give…
A: Layout planning :- Making alternatives related to the physical affiliation of all available…
Q: A small formwork subcontractor is awarded to erect formwork. It has been estimated 75labor-days. The…
A: Production is the process of converting inputs into finished products and services for the…
Q: Figure 1 and Figure 2 show a procedure for the industrial ergonomics in factory. Explain the effect…
A: Ergonomics is described as a scientific discipline that is associated with having proper…
Q: From the following table calculate and identify the Total distance travelled for per month for…
A: Given, roducts Products per month (load/units) Distance per product (feet) Layout A…
Q: The desired daily output for an assembly line is 540 units. This assembly line will operate 720…
A: Line balancing is a process which allocate activity to right workstation based on different…
Q: Which of these items would be most likely to be made with a fixed position layout ? Select one :…
A: The correct answer is option (a). Fixed position layout is a type of layout in which the transformed…
Q: Explain the term traditional assembly line operations? how are these operations efficient?
A: Managers are in a charge of overseeing the operation and other stages involved in creating a product…
Q: Jack has gathered the following information for Work Center 2, the work center that directly feeds…
A: Given data:
Q: A paced assembly line has been devised to manufacture calculators, as the following data show:…
A: The slowest station of the given line is S3 as it takes the highest time 3 minutes/unit. Hence, the…
Q: snip
A: Make-to-stock would be expected to be less expensive to the customer.
Q: Before considering a product-oriented layout, it is important to be certain of:…
A: The layout is a strategic choice because layout impacts the long-run efficiency of an operations…
Q: A paced assembly line has been devised to manufacture calculators, as the following data show:…
A: The station which is slowest is S3 which takes a time of nearly 3 minutes/units. Production…
Q: Identify the store layout of your chosen retail business. Do you think the store layout helps the…
A: Store layout refers to the physical setting of the shop providing lucrative ambience and strategic…
Q: a) Draw the precedence diagram and assign tasks using five workstations. b) What is the efficiency…
A: A project schedule network diagram shows the sequence of the task that are performed to complete a…
Q: 1. An assembly line with 17 tasks is to be balanced. The longest task is 2.4 minutes, and the total…
A: Given data,Operational time (OT) = 450 minutes a dayLongest task = 2.4 minutes Total time for all…
Q: What is the objective of assembly-line balancing? How would you deal with the situation where one…
A: The objective of the assembly line balancing is to efficiently arrange the machines, tasks, and…
Q: Some production/assembly line jobs are dull and routine. This can lead to labor turnover. As a…
A: Below is the solution:-
Q: A shop works a 400-minute day. The manager of the shop wants an output of 200 units per day for the…
A: The precedence diagram is contained bolts and nodes. Nodes show the exercises engaged with an…
Q: work(s) effectively with Cellular layout a. All of the choices bwireless telecommunication C. part…
A: A cell layout is a designing process that is involved in making a layout consisting of dissimilar…
Q: A B C D − 480 500 50 350 − 175 0 0 0 − 750 0 0 0 −…
A: Work centers is a common word used in operations management where people are employed for performing…
Q: State some ways that a layout can help or hinder productivity
A: Productivity is expressed as the ratio of output to input in an industrial system, machine, or…
Q: List five advantages and disadvantages of product-oriented layouts
A: 1. Smooth flow of production: The whole production process is incorporated. In this way, the chance…
Q: "I'm not sure we should lay out $265,000 for that automated welding machine," said Jim Alder,…
A: Net present value (NPV) is applied to estimate the current worth of a future stream of cash. The…
Q: Find examples of a product layout in local businesses.Draw a picture to show the workstations and…
A: Product layout can be defined as the production process setup that includes the arrangement of the…
Q: In what ways does technology have an impact on process selection? How can technology impact layout…
A: Technology has a tremendous impact on process selection due to changes in computer-related…
Q: Gordon Miller's job shop has four work areas, A, B, C, and D. Distances in feet between centers…
A: Material handling is the change, security, storage, and control of supplies and goods during…
Q: Professional Image Briefcases is an exclusive producer of handcrafted, stylish cases. The company…
A:
Q: According to a study by the Alliance of American Insurers, it costs more than three times the…
A: Assembling an original car is a process where the company needs to minimize the cost to keep the…
Q: What type of process—project, job shop, flow shop, and continuous flow—would most likely be used to…
A: Great administration includes fitting the sort of the board to the kind of assembling or other task…
Q: What is the objective of assembly-line balancing?
A: Assembly line balancing adjusting is a creative technique that sets a planned pace of creation to…
Given the standard times associated with six sequential operations, calculate the efficiency of the assembly line:
Operation |
Standard Minutes |
1 |
0.54 |
2 |
1.32 |
3 |
2.40 |
4 |
0.88 |
5 |
1.35 |
6 |
0.97 |
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 1 images
- A paced assembly line has been devised to manufacture calculators, as the following data show: Station Work ElementAssigned Work ElementTime (min) S1 S2 S3 S4 S5 S6 A D,E C B,F,G H,I,J K 2.7 0.6, 0.9 3.0 0.7, 0.7, 0.9 0.7, 0.3, 1.2 2.4 a. What is the maximum hourly output rate from this line? (Hint: The line can go only as fast as its slowest workstation.)b. What cycle time corresponds to this maximum output rate?c. If a worker is at each station and the line operates at this maximum output rate, how much idle time is lost during each 10-hour shift?d. What is the line’s efficiency?A paced assembly line has been devised to manufacture calculators, as the following data show: LOADING... Station Work Element Assigned Work Element Time (min) S1 A 4.0 S2 D, E 0.9, 1.5 S3 C 5.0 S4 B, F, G 1.1, 1.0, 1.3 S5 H, I, J 1.1, 0.5, 1.8 S6 K 4.0 a. What is the maximum hourly output rate from this line? (Hint: The line can only go as fast as its slowest workstation.) The maximum hourly output rate is nothing calculators per hour. (Enter your response as an integer.) B. What cycle time corresponds to this maximum output rate? C. If a worker is at each station and the line operates at this maximum output rate, how much idle time is lost during each? 10-hour shift? D. What is the line's efficiency?A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with, the sawing and sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel). A) is the bottleneck. b) The bottleneck time isminutes per unit (round your response to two decimal places). c) The throughput time of the overall system is enter your response here minutes (round your response to two decimal places). D) If the firm operates 8 hours per day, 20 days per month, the monthly capacity of the manufacturing process isunits (enter your response as a whole number).
- The process design team at a manufacturer has broken an assembly process into eight basic steps, each with a required time and predecessor as shown in the table. They work an 8-hour day and want to produce at a rate of 360 units per day. What should their takt time be?The maker of the world-famous Chocolate Chip Cookies needs to design a product layout for a new product, Mint Chocolate Chip. The company plans to use this new production line eight hours a day in order to meet projected demand of 1,440 cases per day. The following table describes the tasks involved in the production of a case of Mint Chocolate Chip Cookies. 27 seconds 0.3333 seconds 18 seconds 14 seconds 56 seconds 20 secondsA production process at Kenneth Day Manufacturing is shown in Figure S7.9. The drilling operation occurs separately from, and simultaneously with, sawing and sanding, which are independent and sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel).a) Which operation is the bottleneck?b) What is the bottleneck time?c) What is the throughput time of the overall system?d) If the firm operates 8 hours per day, 20 days per month, whatis the monthly capacity of the manufacturing process?
- An assembly line with 20 activities is to be balanced. The total amount of time to complete all 20 activities is 50 minutes. The longest activity takes 2.4 minutes and the shortest takes 0.9 minute. The line will operate for 300 minutes per day. What are the maximum and minimum cycle times? Round your answers to one decimal place. Maximum cycle time: minutes Minimum cycle time: minutes How much daily output will be achieved by each of those cycle times? Round your answers to the nearest whole number. Daily output achieved by maximum cycle time: units/day Daily output achieved by minimum cycle time: units/dayMr. Aris Benn manages an assembly line that produces a piece of equipment that is used to clean floors. The process to produce this piece of equipment consists of 10 steps. Determine what other information is needed in order to balance this assembly line. Also, set up a numerical example of the line balancing problem at hand. Using this example, demonstrate how to balance the line and how to calculate its efficiency.The following table shows the process times in minutes (or minutes/unit - how many minutes to process one unit) of a six-station serial production line (1-2-3-4-5-6). Station 1 2 3 4 5 6 Which station(s) is (are) the bottleneck(s)? Station 2 Station 5 Stations 3 and 4 Stations 2 and 5 Process Time (minutes/unit) 8 11 7 7 11 4
- Dr. Lori Baker, operations manager at Nesa Electronics, prides herself on excellent assembly line balancing. She has been told that the firm needs to complete 96 instruments per 24-hour day. The assembly-line tasks for the production of the instrument are: Task Time (minutes) Predecessors A 3 ---- B 6 ---- C 7 A D 5 A, B E 2 B F 4 C G 5 F H 7 D, E I 1 H J 6 E K 4 G, I, J Draw the precedence diagram If the daily production (24-hour) production rate is 96 units, what is the highest allowable cycle time? If the cycle time after allowances is given as 12 minutes, what is the daily (24-hour) production rate? With a 12-minute cycle time, what is the theoretical minimum number of stations with which the line can be balanced? Assign task to workstations. Use the following decision rules (heuristics): longest task first, break ties by assigning the task with the most followers. What are the efficiency and the balance delay of the assembly line? Show detil of…What type of process—project, job shop, flow shop, and continuous flow—would most likely be used to produce the following? Explain your reasoning. Apple iPads Weddings Paper Tax preparationgiven information: which step is in bottleneck=30 min for tan leather 60/30=2 briefcases per hr are processed at the bottleneck workstation per hour throughput time of the overall process Throughput = 75 minutes PLEASE answer the following 3 questions: If the manufacturing facility operates 8 hours per day, 250 days a year, what is the annual capacity of this manufacturing process. Assume the company decides to hire additional workers in order to duplicate the bottleneck step identified in part a so that there are 3 of these workstations instead of 1. Redraw the diagram showing the flow of the revised process. Answer parts a through d again based on the new process created in part e?