From 20 tickets marked 1 to 20, one ticket is drawn at random. What is the probability that it will be multiples of 4 or 7? Select one: O a. 2/5 O b. 1/5 O c. 7/20 O d. 8/15
Q: As shown in the figure, calculate the angle of twist at A relative to D? ... 250-mm diameter shaft 0...
A:
Q: Draw (and explain) a flow diagram of your municipal wastewater and chromium treatment system.
A: Step: 1 Municipal wastewater: - It is defined as mixture of wastewater from households, industry an...
Q: 60 kN/m 30 kN/m A C Hinge /B -10 m- 5 m Determine the deflection at B in mm. E = 200 GPa and I = 600...
A:
Q: A vertical curve with a length of 260 m is used to connect a 2.5 % and -2.5% gradients with a PVC at...
A:
Q: THE RELEVANCE OF IST AND SECOND LAW OF THERMODYNAMICS IN YOUR CAREER AS A CIVIL ENGINEER
A: Brief concept introduction- First Law of Thermodynamics- Heat is a form of energy, according to the ...
Q: The 50 KN block is on top of an inclined plane shown in the figure. Determine the weight (W) of the ...
A: Given: The weight of the block is 50 kN. The inclined velocity is 2 m/sec. The displacement is 2 m. ...
Q: Example 5.2. Design a three barrel siphon for carrying sewage across a river stream. The total lengt...
A:
Q: 5' Water 4'
A:
Q: The specific energy in m- expressed by V=2.22 m/sec and y = 1 m is a) 1.25 b) 2.22 c) 3.22 d) 4.22
A:
Q: A 10.0 m long with a cross sectional area 180 mm? copper rod carries a tensile load of 5 kN at 30°C....
A:
Q: A certain amount of excess charge is transferred a conducting sphere with a diameter of 30 cm such t...
A: Given that Diameter of sphere D = 30 cm Potential at center is Vo= 2.5 kV
Q: 2.3g as it follows the horizontal path shown. Determine the magnitude and direction of its total acc...
A:
Q: 2. DETERMINE THE FOROE IN MEMBER IJ.BI,GH & IH. STATE WHETHER THE MEMBERS ARE IN TENSION OR COMPRESS...
A:
Q: What is the required volume of Fine Aggregates(s.g. = 2.4) if the mass needed for the concrete mix i...
A: Given S.g of fine aggregate = 2.4 Mass of fine aggregate = 850 kg
Q: Determine the force in each member of the truss. State whether the members are in tension or compres...
A:
Q: A STuare footing is 1.8 x 1.8 m with a 0.4 × 0.4 m? square column. It is loaded with an zxia! load o...
A:
Q: Calculate the weaving ratio for the legs 1 and 2 out of the four legs rotary intersection mentioned ...
A: Given data,
Q: l00 KN A D bm
A:
Q: The weight of a dry aggregate sample is 1300 gms, and it is desired to prepare a specimen of aspha c...
A:
Q: Mile! l T431,6r| go |103 An Engineer has the following data for a highway segment o (MpIK)| 60l5211 ...
A:
Q: isotropic confined aquifer of hydraulic conductivity 2 m/day.
A: Given: Diameter = 15 cm Rate of flow = 265 L/min Hydraulic conductivity = 2m/day To determine drop ...
Q: A flanged-bolt coupling consisting of six % inch diameter steel bolts evenly spaced around a bolt ci...
A:
Q: vertical curve with a length of 260 m is used to connect a 2.5 % and - evation 1035.3 m. he location...
A:
Q: Design a 1 way slab to carry a live load of 4.8 KPa on a simple span of 4.50 m. Use f'c = 20.70 MPa,...
A:
Q: A plan drawn to a scale of 1:2500 was measured by mistake by a scale of 1:3000. What are the percent...
A:
Q: T 11 175 k 175 k The bolted connection shown is to be used to transmit a tension of 175 kips by usin...
A:
Q: The sum of forces in the member BC and GH in the following pin jointed frame is kN. Take compression...
A:
Q: p, thank you.
A:
Q: A vertical curve with a length of 260 m is used to connect a 2.5 % and-2.5% gradients with a PVC at ...
A:
Q: A vertical curve with a length of 260 m is used to connect a 2.5% and -2.5 % gradients with a P elev...
A:
Q: Section 4.4. 3. Draw the shear and moment diagrams for each member of the frame. Assume A is fixed, ...
A:
Q: a minor component that primarily contributes to total alkali content in portland cement
A: PORTLAND CEMENT:
Q: A sample coarse grained soil is 60mm. In diameter and 150mm long was tested in a constant-head appar...
A: To Determine a) temperature correction factor b) corrected coefficient of permeability C) interstiti...
Q: Find the resultant force which acts on the gate's submerged face if the gate is 4 m long. 5m 5m 60° ...
A: Given, Length of gate = 4m
Q: Compute for the corrected amount of water needed in the concrete mix if the mass of fine and coarse ...
A:
Q: y 100 lb 80 lb le 2 ft> + 2 ft 4 ft + 3 ft → FIG. P6.24
A:
Q: The uniform 8-ft board is pushed down into the water so it makes an angle of 30 degrees with the wat...
A:
Q: A piece of wood 305mm square and 3.0m long, weighing 6288.46 N/m3, is submerged vertically in a body...
A:
Q: What is the probability that event A will occur if the odds against that event A will occur is 5:7? ...
A:
Q: A garden hose attached with a nozzle is used to fill a 10-gal bucket. The inner diameter of the hose...
A:
Q: Annual flood data of the river Kaveri covering the period from 1952 to 1983 yielded a discharge of 2...
A:
Q: 1. The beam is subjected to a load F = 400 N and is supported by the rope and the smooth surfaces at...
A: To Determine a. Draw the free-body diagram of the beam. b. What are the magnitudes of the reactions ...
Q: The footing of a wall is 1.5 m wide at the base and is located in a homogeneous cohesive soil at a d...
A:
Q: Given the following data: slump requirement = 4" max aggregate size = 1" mass pf water = .193 kg/m...
A:
Q: Consider the following projects: Project A has a cost of 50, uniform annual benefit of 6.1 and salva...
A: Given, Project A has a cost o= 50 Project B has a cost = 40 Project C has a cost =30 Project D ha...
Q: A composite beam is made by attaching the timber and steel portions as shown in the figure with bolt...
A:
Q: The coefficient of active earth pressure for a loose sand having an angle of internal friction of 30...
A:
Q: The weight of a dry aggregate sample is 1300 gms, and it is desired to prepare a specimen of asphalt...
A:
Q: A machine having a mass of 4200 kg is supported by three solid steel rods arranged as shown in Figur...
A:
Q: The figure shows a siphon discharging oil (s=0.90). The siphon is composed of 8 cm pipe from A to B ...
A:
Fast pleaseee!!!
Trending now
This is a popular solution!
Step by step
Solved in 2 steps
- Determine the Departure Misclosure and Latitude Misclosure for the four sided parcel shown below. Start your closure at point "A" and perform the closure in a counter clockwise direction. -All calculations are to be taken to 4 decimal places and final answers are to be entered with 4 decimal places. I need a quick solution within 15 minutes With my best wishesTon.10. From the following table, draw the precedence network, perform the CPM calculations, and complete the table entries, assuming interruptible activities. Activity A ABCO с Duration IPA Type Rel Lag ES 3 3526 5 2 6 LAABC А B с SS FF 3 EF LS LF TF FF "If the relationship type is not mentioned, it is finish to start (FS). If no lag is mentioned, it is zero.3 1. Factors that affect scheduling are limitations and availability of: O Materials, payments and permits Contracts, Crews and concerns X O Equipment, tires and techniques 4 $ Equipment, materials and labor 1.8 F4 R F [ V F5 % 5 T 17 G F6 6 B W Y F7 H & 7 F8 U N DP * 00 8 J F9 09 ہ ۔ M F10 K 76°F Light ☀- F11 0 L
- The required total period for the completion of the project and the critical path after calculating the values in the empty boxes as in the symbol attached to the drawing9:38 O A O 4 .l 414 4woa9idón4Eqd0c32r5kmr.J. A university is considering two alternative types of bleachers for a new gymnasium. One of the two alternatives will be chosen. Assume that the benefits of the gymnasium are the same for both construction methods. Alternative A: Wooden bleachers on earth fill The first cost of $110.000 for the earth fill and $100.000 for the wooden bleachers. The annual painting costs are $5.000. The wooden bleachers must be replaced every 30 years at a cost of $100,000. The earth fill will last the entire 120 years Alternative B: Concrete Bleachers The first cost is $350,000. The expected life of the concrete bleachers is 120 years and the annual upkeep costs are $2.500 The university Uses a MARR of 7%. Which of the two alternatives is better? Opening in Google Drive.Please answer. I'll rate Thankyouuu!
- 2. Find the shortest path from point A to ALL points in the network, list each route and the time it takes. You should have 6 routes in total. a 8 b 6 10 C 15 d 9 14 4 e 13 f 17 7 6.0 gQuestion 31 The steel hollow shaft is rigidly attached to a solid bronze shaft by a bolt coupling. A maximum torque T can be applied to the ends of the shaft without failure. Use G = 83 GPa for steel and G = 35 GPa for bronze. T 100 mm 70 mm 70 mm 1.5 m 2 m 1. Determine the maximum torque T in kN·m without exceeding a shear stress of 70 MPa in steel and 50 MPa for bronze. A) 10.44 Determine the maximum torque T in kN·m without exceeding an angle of twist of 2.5° in the 3.5-m length. B) 9.82 C) 8.56 D) 7.35 2. A) 1.20 Determine the number of 16 mm bolts required to attach the two shafts if the B) 13.51 C) 2.40 D) 12.68 3. allowable shear stress in each bolt is 30 MPa and the diameter of bolt circle is 150 mm. A) 4 B) 5 C) 6 D) 7Given the list of construction activities for your newly-acquired residential project. Determine the critical path for this project. Activity Depends on Duration (weeks) D A 5 B A 3 G E 3 4 E В. С 2 G. H, I 2 A 4 F C. D 5 E. F A none The critical path for this project is Note: Use this format in your final answer/s, such as if your answer is S, T, U, V, W, then type your final answer as S-T-U-V-W
- Multinomial Logit Model - Sample Problem Let the number of trips from zone i to zone j is 5000, and two modes are available which has the characteristics given in below. Compute the trips made by the three modes and the fare required to travel by each mode. coefficient car bus train ti twalk tij Fij 0.03 0.04 0.06 0.1 20 18 30 6 12 5 10 3 2 Pij 0.1 Cij = a₁tij + a₂tij + asti; +astnij + a5 Fij + a60j + d3.37 A company produces four products in its production facility. The facility has four de- partments labeled A-D. The routing information, production quantities, and volumes for each product are given in the table below. Product 1 2 3 4 Production Quantities (per day) 15 20 14 10 Routing B-A-D-C-A A-D-C-B A-C-D-B B-A-C-D Volume (compared to Product 1) 1 1 2 0.5 Determine the from-to chart. Recommend a flow pattern.9:37 O A O *49 .l 404 4woa9idón2EqdOc32r5kmr.J. You must recommend one of two machines into an upgraded manufacturing line. You obtain estimates from salespeople from two companies. Salesman A gave the estimates in constant-value dollars, while salesman B provided in future (then-current) dollars. The company's MARR is equal to the real rate of return of 20% per year, and inflation is estimated at 4% per year. Use present worth analysis to determine which machine the engineer should recommend. A. First Cost $ 140.000 $ 25,000 $150,000 $ 43,000 Annual Cost Life (years) 10 10 Opening in Google Drive. ...