An engineer must decide between two ways to pump concrete to the top of a seven-story building. Plan 1 requires the leasing of equipment for $60,000 initially and will cost between $0.40 and $0.95 per metric ton to operate, with a most likely cost of $0.50 per metric ton. The pumper can pump 100 metric tons per 8-hour day. If leased, the asset will have a contract period of 5 years. Plan 2 is a rental option that will cost $18,000 per year. In addition, an extra $13.5 per hour labor cost will be incurred for operating the rented equipment per 8-hour day. Which plan should the engineer recommend if the equipment will be needed for 50 days per year? The MARR is 14% per year. The annual worth of plan 1 lease optimistic is $ -19,144.5 The annual worth of plan 1 most likely is $ The annual worth of plan 1 pessimistic is $

ENGR.ECONOMIC ANALYSIS
14th Edition
ISBN:9780190931919
Author:NEWNAN
Publisher:NEWNAN
Chapter1: Making Economics Decisions
Section: Chapter Questions
Problem 1QTC
icon
Related questions
Question
An engineer must decide between two ways to pump concrete to the top of a seven-story building. Plan 1 requires the leasing of
equipment for $60,000 initially and will cost between $0.40 and $0.95 per metric ton to operate, with a most likely cost of $0.50 per
metric ton. The pumper can pump 100 metric tons per 8-hour day. If leased, the asset will have a contract period of 5 years. Plan 2 is a
rental option that will cost $18,000 per year. In addition, an extra $13.5 per hour labor cost will be incurred for operating the rented
equipment per 8-hour day. Which plan should the engineer recommend if the equipment will be needed for 50 days per year? The
MARR is 14% per year.
The annual worth of plan 1 lease optimistic is $ -19,144.5
The annual worth of plan 1 most likely is $
The annual worth of plan 1 pessimistic is $
The annual worth of plan 2 rental is $ -21,000
Plan 1 lease optimistic is higher
Plan 1 most likely is better
Plan 1 lease pessimistic is higher
✓than rental of plan 2.
than rental of plan 2.
✓than rental of plan 2.
Transcribed Image Text:An engineer must decide between two ways to pump concrete to the top of a seven-story building. Plan 1 requires the leasing of equipment for $60,000 initially and will cost between $0.40 and $0.95 per metric ton to operate, with a most likely cost of $0.50 per metric ton. The pumper can pump 100 metric tons per 8-hour day. If leased, the asset will have a contract period of 5 years. Plan 2 is a rental option that will cost $18,000 per year. In addition, an extra $13.5 per hour labor cost will be incurred for operating the rented equipment per 8-hour day. Which plan should the engineer recommend if the equipment will be needed for 50 days per year? The MARR is 14% per year. The annual worth of plan 1 lease optimistic is $ -19,144.5 The annual worth of plan 1 most likely is $ The annual worth of plan 1 pessimistic is $ The annual worth of plan 2 rental is $ -21,000 Plan 1 lease optimistic is higher Plan 1 most likely is better Plan 1 lease pessimistic is higher ✓than rental of plan 2. than rental of plan 2. ✓than rental of plan 2.
Expert Solution
steps

Step by step

Solved in 3 steps

Blurred answer
Knowledge Booster
Contracts
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, economics and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
ENGR.ECONOMIC ANALYSIS
ENGR.ECONOMIC ANALYSIS
Economics
ISBN:
9780190931919
Author:
NEWNAN
Publisher:
Oxford University Press
Principles of Economics (12th Edition)
Principles of Economics (12th Edition)
Economics
ISBN:
9780134078779
Author:
Karl E. Case, Ray C. Fair, Sharon E. Oster
Publisher:
PEARSON
Engineering Economy (17th Edition)
Engineering Economy (17th Edition)
Economics
ISBN:
9780134870069
Author:
William G. Sullivan, Elin M. Wicks, C. Patrick Koelling
Publisher:
PEARSON
Principles of Economics (MindTap Course List)
Principles of Economics (MindTap Course List)
Economics
ISBN:
9781305585126
Author:
N. Gregory Mankiw
Publisher:
Cengage Learning
Managerial Economics: A Problem Solving Approach
Managerial Economics: A Problem Solving Approach
Economics
ISBN:
9781337106665
Author:
Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike Shor
Publisher:
Cengage Learning
Managerial Economics & Business Strategy (Mcgraw-…
Managerial Economics & Business Strategy (Mcgraw-…
Economics
ISBN:
9781259290619
Author:
Michael Baye, Jeff Prince
Publisher:
McGraw-Hill Education