A defense department assigned its highest priority to develop an advanced aircraft using materials not previously used and untested technologies. A firm fixed-price contract was awarded to a qualified vendor. Controls were in place at all levels, and progress reports—noting challenges—were sent to top officials. Top officials reported that progress was excellent, but the project failed due to enormous expenditures with no aircraft developed. Which risks were not adequately considered? I. Because the requirements were not specific, the use of a firm fixed-price contract made the project risky. II. The personnel at many levels sent false reports forward on cost incurred and progress made. III. The contractor lacked adequate technical skills to deal with technology that was still evolving. IV. Top procurement officials did not act on “red flags” due to a “can do” mentality on a high priority of the program.   Group of answer choices I and IV only I only

Elements Of Electromagnetics
7th Edition
ISBN:9780190698614
Author:Sadiku, Matthew N. O.
Publisher:Sadiku, Matthew N. O.
ChapterMA: Math Assessment
Section: Chapter Questions
Problem 1.1MA
icon
Related questions
Question

25.

A defense department assigned its highest priority to develop an advanced aircraft using materials not previously used and untested technologies. A firm fixed-price contract was awarded to a qualified vendor. Controls were in place at all levels, and progress reports—noting challenges—were sent to top officials. Top officials reported that progress was excellent, but the project failed due to enormous expenditures with no aircraft developed. Which risks were not adequately considered?

I. Because the requirements were not specific, the use of a firm fixed-price contract made the project risky.

II. The personnel at many levels sent false reports forward on cost incurred and progress made.

III. The contractor lacked adequate technical skills to deal with technology that was still evolving.

IV. Top procurement officials did not act on “red flags” due to a “can do” mentality on a high priority of the program.

 

Group of answer choices
I and IV only
I only
II and III only
None of the choices
I, II, III, and IV
Expert Solution
steps

Step by step

Solved in 3 steps

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Elements Of Electromagnetics
Elements Of Electromagnetics
Mechanical Engineering
ISBN:
9780190698614
Author:
Sadiku, Matthew N. O.
Publisher:
Oxford University Press
Mechanics of Materials (10th Edition)
Mechanics of Materials (10th Edition)
Mechanical Engineering
ISBN:
9780134319650
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Thermodynamics: An Engineering Approach
Thermodynamics: An Engineering Approach
Mechanical Engineering
ISBN:
9781259822674
Author:
Yunus A. Cengel Dr., Michael A. Boles
Publisher:
McGraw-Hill Education
Control Systems Engineering
Control Systems Engineering
Mechanical Engineering
ISBN:
9781118170519
Author:
Norman S. Nise
Publisher:
WILEY
Mechanics of Materials (MindTap Course List)
Mechanics of Materials (MindTap Course List)
Mechanical Engineering
ISBN:
9781337093347
Author:
Barry J. Goodno, James M. Gere
Publisher:
Cengage Learning
Engineering Mechanics: Statics
Engineering Mechanics: Statics
Mechanical Engineering
ISBN:
9781118807330
Author:
James L. Meriam, L. G. Kraige, J. N. Bolton
Publisher:
WILEY