3) For the construction of the final stage of a university laboratory building, the site engineer decided to purchase 12 beams whose value (in dollars) varies according to the length of the beam. In the last quote received by the engineer is the unit cost that the 12 beams would have, it is as follows:

Fundamentals Of Construction Estimating
4th Edition
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Pratt, David J.
Chapter16: Budget Estimating
Section: Chapter Questions
Problem 4RQ: Prepare a typical bay estimate based on the following information: a. Bay size of 350 feet and a...
icon
Related questions
Question
3) For the construction of the final stage of a
university laboratory building, the site engineer
decided to purchase 12 beams whose value (in
dollars) varies according to the length of the
beam. In the last quote received by the engineer
is the unit cost that the 12 beams would have, it
is as follows:
2500
2600 2550
2480 2560 2570
2490 2490 2530 2510 2490
2410
a. The lot purchase criteria establishes that it
should be acquired if its average cost does not
belong to the cheapest 10% of lots or to the
most expensive 10% of lots that have been
purchased for the construction of the entire
building. If it is known that the beams that have
been purchased throughout the project have
had a normally distributed cost with an average
of $2,540, what should the engineer's decision
be and why?
b. What must be the minimum and maximum
average costs of the lot so that it can be
purchased?
Transcribed Image Text:3) For the construction of the final stage of a university laboratory building, the site engineer decided to purchase 12 beams whose value (in dollars) varies according to the length of the beam. In the last quote received by the engineer is the unit cost that the 12 beams would have, it is as follows: 2500 2600 2550 2480 2560 2570 2490 2490 2530 2510 2490 2410 a. The lot purchase criteria establishes that it should be acquired if its average cost does not belong to the cheapest 10% of lots or to the most expensive 10% of lots that have been purchased for the construction of the entire building. If it is known that the beams that have been purchased throughout the project have had a normally distributed cost with an average of $2,540, what should the engineer's decision be and why? b. What must be the minimum and maximum average costs of the lot so that it can be purchased?
Expert Solution
steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Knowledge Booster
Methods to determine productivity
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Fundamentals Of Construction Estimating
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:
9781337399395
Author:
Pratt, David J.
Publisher:
Cengage,