Your company has won a contract to provide and compact the fill material for an earth levee (an embankment built to prevent overflow of a river), with the dimensions shown below. The levee fill is a silty clay soil to be compacted to atleast 95.1% of maximum standard Proctor of dry unit weight= 109lb/cu.ft at an OMC of 18.6%. Your borrow pit has a silty clay with an in-situ moist density of 112.6lb/cu.ft at 18.1% water content and a Gs = 2.679. When the soil is excavated and loaded on to your trucks, the void ratio of the material is e = 1.46. Your trucks can haul 401 cu.ft of material per trip.   DETERMINE THE FF AND SHOW COMPELETE SOLUTION. ALL FINAL ANSWER WILL BE IN 3 DECIMAL PLACES. 1. Determine the volume of fill required for the levee in cu.ft 2. Determine the volume required from the borrow pit in cu.ft 3. Determine the required number of truck loads.

Architectural Drafting and Design (MindTap Course List)
7th Edition
ISBN:9781285165738
Author:Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:Alan Jefferis, David A. Madsen, David P. Madsen
Chapter17: Floor Plan Dimensions And Notes
Section: Chapter Questions
Problem 17.15Q
icon
Related questions
Question

Your company has won a contract to provide and compact the fill material for an earth levee (an embankment built to prevent overflow of a river), with the dimensions shown below.

The levee fill is a silty clay soil to be compacted to atleast 95.1% of maximum standard Proctor of dry unit weight= 109lb/cu.ft at an OMC of 18.6%.

Your borrow pit has a silty clay with an in-situ moist density of 112.6lb/cu.ft at 18.1% water content and a Gs = 2.679.

When the soil is excavated and loaded on to your trucks, the void ratio of the material is e = 1.46. Your trucks can haul 401 cu.ft of material per trip.

 

DETERMINE THE FF AND SHOW COMPELETE SOLUTION. ALL FINAL ANSWER WILL BE IN 3 DECIMAL PLACES.

1. Determine the volume of fill required for the levee in cu.ft

2. Determine the volume required from the borrow pit in cu.ft

3. Determine the required number of truck loads.

Dimensions shown below are in ft.
20-
20
21
20
60
Transcribed Image Text:Dimensions shown below are in ft. 20- 20 21 20 60
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Knowledge Booster
Basic concepts of water resources sustainability
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Recommended textbooks for you
Architectural Drafting and Design (MindTap Course…
Architectural Drafting and Design (MindTap Course…
Civil Engineering
ISBN:
9781285165738
Author:
Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:
Cengage Learning