While setting the cycle time as the minimum possible will result in more output rate O a. TRUE O b. FALSE
Q: A Printed Circuit Board (PCB) machine installs integrated circuits onto a board. Before starting to…
A: given, machine requires a 20-minute setup the PCB machine requires only 0.15 minute per board the…
Q: A company that makes shopping carts for supermarkets and other stores recently purchased some new…
A: Note: - As in the question it is specified to answer the 2nd question, only the 2nd question is…
Q: While setting the cycle time as the maximum possible will result in more out Oa. FALSE O b. TRUE
A: The cycle time is the length of time it takes to execute a task from beginning to end. It's the time…
Q: . If the takt time increases, the operation requires:a. more workers.b. fewer workers.
A: The operation manager has the responsibility to keep an eye on working on the marketing manager so…
Q: f. Given e, what is the maximum number of orders waiting to be picked? Maximum number of orders…
A: The maximum output for any process is equal to the output at the bottlenck workstation
Q: Kanban is the Japanese word for:a) car.b) pull.c) card.d) continuous improvement.e) level schedule.
A: c) card.
Q: If the batch size is increased, inventory increases, which implies that flow units arelikely to…
A: Inventory is an aggregate of material which are in the form of finished goods for selling purpose,…
Q: In a Job-Shop processing system, it generally requires less skilled workers than a repetitive…
A: Production is the process of converting raw resources into finished products for consumption…
Q: Students have to change buildings between classes, which often involves walks of5 minutes or more.…
A: The correct option is B: Non-value-added time The Non-value-added time refers to the time that does…
Q: Suppose Dunkin Donuts prepares its Munchkins before opening each day. Each batch consists of 500…
A: Given, Batch size = 500 Setup time = 15 minutes Processing time = 1 minute
Q: The objective of line balancing is to assign tasks to workstations in such a way that the…
A: Line balancing refers to assigning the right number of workers and machines to every assembly line…
Q: Four hundred and eighty minutes of production time are available per day. Scheduled production is…
A: cycle time implies how long individual can complete a exact task from start to end. this cycle time…
Q: The process capacity- students/hour.(Difficulty Level-Hard)
A: The efficiency of any input, be it labor or machine is assessed based on its ability to produce or…
Q: The resource with the largest total demand rate is the bottleneck. True or false?a. Trueb. False
A: Resources are a kind of supply that can be drawn on by an individual or organization in order to…
Q: hundred picces will flow through from the first machinc A to the final machine 1 on the given…
A:
Q: How manazing a time is different from an operation
A: Time management can be defined as the management of the time spent, progress made on the tasks and…
Q: The students information like Name, GPA, Major subjects etc., about a particular is stored in the…
A: A) Student Record:- An understudy/student record is one that: Is kept up by the University or…
Q: Rene steering makes 100 000 steering wheels per month. The firm works for 20 days in month, each day…
A: Given: Number of steering wheel = 1,00,000/ month Working days in a month = 20 total shifts in a day…
Q: The slowest point in a process is a ________.
A: The slowest point in a process is a ________
Q: For a given process, the raw processing time is 102 sec, the bottleneck cycle time is 20 sec/item,…
A: The work-in-progress is those products that still want some work to make the finished products.
Q: CodeDeskInc matches programmers with freelance jobs. It has 30 employees who staffits online chat…
A: Active chat sessions=Average request per hour×Chat session timeMinutes per hour=240×560=20
Q: If the takt time is shorter than the cycle time, the process needs to run faster. True orfalse?a.…
A: Project requirements are conditions that must be completed to ensure the completion of the project.…
Q: Customers are served in a two-step process with two resources. The processing times for the…
A: Given: Resource 1 = 0.83 hours Resource 2 = 0.35 hours
Q: Claims received by Healthwise Insurance Company are en-tered into the database at one station, and…
A: Solution Applying Johnsons rule, we get - Johnson's rule is: Pick the one with the shortest…
Q: The machine requires maintenance in each working day. Each maintenance takes 20 minutes. Find the…
A: Capacity is the maximum amount that any manufacturing operation can produce. Capacity is increased…
Q: If the demand rate increases, the takt time:a. increases.b. decreases.
A: Takt time is the time needed by the manufacturer to complete per unit of a product to meet the…
Q: A resource that limits the output of a process by limiting capacity is called this.
A: A resource that limits the output of a process by limiting capacity is called bottlenecks.
Q: Clients are served in a two-step process with two resources. The processing times for the resources…
A: Small Introduction about Processing Time Your consumer will have to wait until all of the…
Q: Increasing the batch size on a resource with setups always increases the capacity of theresource.…
A: The business operations run on various input resources to reach a certain level of output. It is the…
Q: In-basket training requires trainees to physically attend classes, interact with the class…
A: Training is one of the most important part of the human resource development program in an…
Q: e resource with the largest total demand rate is the bottleneck. True or false?a. Trueb. Fals
A: Resources are a kind of supply that can be drawn on by an individual or organization in order to…
Q: true or false 3 The same person requires different combinations of products and service depending…
A: There are different products and services that are required in society. The products and services…
Q: Why is maintenance schedule needed by the maintenance team/department ?
A: Maintenance Scheduling: Maintenance scheduling is defined as it is a kind of…
Q: Applications are scanned in a process with two resources. The first resource has a capacity of 0.38…
A: GIven Information: Capacity for the first resource: 0.38 applications per minute Capacity for the…
Q: The definition of work-in-process (WIP) inventory is: Select one: a. An end item ready to be sold,…
A: A manufacturing unit has different kinds of inventories such as; Raw material inventory Material…
Q: The batch size is tripled on a resource that has a setup time. What is the likely impact onthe…
A: c. Increase by less than 300 percent =.
Q: Rework can increase the costs of an operation but has no impact on the capacity of theprocess. True…
A: True. Because Capacity is the most extreme yield that an organization can support to make an item or…
Q: While setting the cycle time as the maximum possible will result in more output rate O a. TRUE O b.…
A: ANSWER IS AS BELOW
Q: A Printed Circuit Board (PCB) machine installs integrated circuits onto a board. Before starting to…
A: given, PCB machine requires a 20-minute setup PCB machine requires only 0.15 minute per board
Q: Drivers are trained in a process with two resources. The processing times for the resources are 32…
A: The implied utilization informs us how much resource is being utilized according to the customer…
Q: Having too much capacity is just problematic as not having enough capacity. Select one: True False
A: Having too much capacity is just problematic as not having enough capacity
Q: Balancing a process with a fixed sequence of activities will achieve a higher averagelabor…
A: The right option is B. False Balancing for a fixed succession of exercises implies adjusting a line…
Q: Does increasing the capacity of a resource ever increase the arrival rate to the resource group that…
A: Increasing the ability of resources often improves the flow of the operation. By increasing power,…
Q: The implied utilization can never be bigger than 100 percent. True or false?a. Trueb. False
A: The implied utilization can never be bigger than 100 percent. This statement is true. The correct…
Q: Considering the constraint in processing, which combination of Products A and B maximizes the total…
A: The answer is as below:
Q: The bottleneck resource in a process has the least idle time. True or false?a. Trueb. False
A: The bottleneck resource in a process has the least idle time.
Q: The objective of line balancing is to assign tasks to workstations in such a way that the…
A: Production is the process of manufacturing products for consumption purposes to sell in the market.…
Q: For a particular process, suppose the bottleneck cycle time is 40, and the raw processing time is…
A: The Process Cycle Efficiency, in some cases alluded to as the Value Added Ratio, is an estimation of…
Q: Which of the following statements about takt time and cycle time is true?a. Takt time only depends…
A: The correct option is option a). Takt time talks about the time required to complete a product to…
Step by step
Solved in 2 steps
- Multiple choice: 6. Scope change control MUST be integrated with all of the following control processes EXCEPT ( ).A. ScheduleB. CostC. ProcurementD. Quality7. In the PDCA cycle of quality management, the function of "D" is ( ).A. transforms quality target values into actual values through input-output activitiesB. take corrective actions to correct the problems or failures in quality inspectionC. determine quality objectives and develop action plans to achieve quality objectivesD. examines the implementation and results of the plan8. As the project enters the execution phase, the project manager learns that the team members are workingovertime doing unanticipated work without a change in scope. What is the most likely reason for thissituation? ( )A. Unclear communications management planB. Insufficient work breakdown structureC. Incorrect estimation in activity durationD. Poor resource planning9. Large and medium-sized engineering projects are composed of several ( ) .A. single…Saved Required information [The following information applies to the questions displayed below.] Raner, Harris & Chan is a consulting firm that specializes in information systems for medical and dental clinics. The firm has two offices-one in Chicago and one in Minneapolis. The firm classifies the direct costs of consulting jobs as variable costs. A contribution format segmented income statement for the company's most recent year is given: Office Sales Variable expenses Contribution margin Traceable fixed expenses Total Company $ 513,000 256,500 256, 500 143,640 Chicago $ 171,000 51,300 119,700 88,920 $ 30,780 Minneapolis $ 342,000 100.00% 50.00% 50.00% 28.00% 100.00% 30.00% 70.00% 52.00% 100.00% 205, 200 136,800 54,720 $ 82,080 60.00% 40.00% 16.00% Office segment margin 112,860 22.00% 18.00% 24.00% Common fixed expenses not traceable to offices 71,820 14.00% Net operating income $ 41,040 8.00% Required: 1-a. Compute the companywide break-even point in dollar sales. 1-b. Compute the…Hardware departm 8. Decision Tree A wine maker must decide whether to harvest grapes now or in four weeks. Harvesting now will yield 100,000 bottles of wine, netting P 2 per bottle. If the wine maker waits for four weeks and weather turns cold (probability: 20%), the yield will be cut in half but net P 3 per bottle. If the weather does not turn cold, the yield depends on rain. With rain (probability: 50%), a full yield netting P 4 per bottle will result. Without rain, there will still be a full 100,000-bottle yield, but the net amount will be P 3 per bottle only. REQUIRED: Determine the optimal expected value. D NOW LATER (4 weeks) COLD ( ): NOT COLD Decision Alternative Stock 0 unit Stock 1 unit Stock 2 units ( RAIN ( NO RAIN ): 9. Decision (Payoff) Table ESA Dealers, Inc. is contemplating on how many units of cars to order to meet the customer demands for the month based on the following projection: ): Demand 0 unit 1 unit 2 units The profit for each unit sold is P 200,000 while the…
- %24 W WA 6.4 custom - Mat x C The Willingnes Zoom Xb The daily demand for X A clemson canvcas - Bin X Cohnect to Canvas at X https://www.webassign.net/web/Student/Assignment-Responses/submit?pos=D2&dep=27166051&tags=autosave#question4697815 2 -> The willingness of saddle-producers to supply saddles can be modeled as for p < 5 = (d)s 2.194(1.295P) for p 2 5 where S(p) is measured in thousand saddles and saddles are sold for p thousand dollars per saddle. (a) How many saddles will producers supply when the market price is $2000? thousand saddles How many saddles will producers supply when the market price is $9000? (Round your answer to three decimal places.) thousand saddles (b) At what price will producers supply 10 thousand saddles? (Round your answer to three decimal places.) thousand per saddle (c) Calculate the producer revenue when the market price is $6500. (Round your answer to three decimal places.) x million 24 (d) Calculate the producer surplus when the market price is $6500.…J as a Production Planner is highly concerned about the capacity for various reasons. Select which ones are valid reasons that J needs to be concerned about.. Multiple choice. Sufficient capacity in place to meet the customers demand on time. Capacity affects the cost efficiency of operations and the scheduling system. Capacity creation does require further investments. Capacity planning is the first step when an organization decides to produce more or new products.W AutoSave Off H 2.0 = PDPMT_PL102_06 June 2023_1 No Label ✓ File Home Insert Draw Design X Paste Clipboard F Page 4 of 6 ▬ Arial B I U U 961 words Q Search V ✓11 Layout References A A A Aa A D x² A✓ ✓ A. А ab ab X₂ X Font 9° 1.1 Questions: 1.2 Review Mailings View Help EE F✓ = = £↓¶ 스 1.3 === Search Paragraph 5 Normal No Spacing 3 Styles Heading 1 "Project, programme and portfolio managers need be as well-versed in leadership skills as they are in technical skills, _._." Do you agree with this statement? Motivate your answer. ".. not just classic leadership skills like communication, problem solving and team building." "..skills like communication, empathy and problem solving are all still integral to project leadership." ".. classic leadership skills like communication, problem solving and team building." In terms of the reference to team building, explain the role of team cohesiveness in team building and discuss the steps involved in the development of the cohesiveness English…
- Required information Camp Rainbow offers overnight summer camp programs for children ages 10–14 every summer during June and July. Each camp session is one week and can accommodate up to 200 children. The camp is not coed, so boys attend during the odd-numbered weeks and girls attend during the even-numbered weeks. While at the camp, participants make crafts, participate in various sports, help care for the camp's resident animals, have cookouts and hayrides, and help assemble toys for local underprivileged children. The camp provides all food as well as materials for all craft classes and the toys to be assembled. One cabin can accommodate up to 10 children, and one camp counselor is assigned to each cabin. Three camp managers are on- site regardless of the number of campers enrolled. Following is the cost information for Camp Rainbow's operations last summer: Number of Cost to Run Campers 172 Week Camp $13,810 9,350 11,360 14,380 14,000 12,440 10,180 8,440 112 3 148 4 184 5 174 152…l AT&T ? C 2:01 PM ... mple Practice Math Flov Sample 1 You have an upstream Picking department that feeds two downstream packing departments: A and B. 75% of your Pick volume goes to department A, which has a packing rate of 150 units per labor hour (uph). 25% of the Pick volume goes to department B, which is for large items, and has a pack rate of 25 units per labor hour. Your pickers pick both large and small items throughout the day at an overall average rate of 100 units per labor hour. You have 25 people today for all 3 departments, and you absolutely must pack 7,500 units in department A to meet a customer promise metric. How do you allocate labor to balance the flow in your department if you work a 10 hour shift? Do not assume breaks or lunches in your answer Department % of Rate Реople Daily volume| (uph) volume Pick 100% 100 Pick A 75% 150 ? 7,500 Pick B 25% 25 ?12 Assuming there is no change in a product's price or the quantity demanded, if a business owner wants to increase her advertising expenses by $500 monthly, ut of this would cause total costs to and the break-even quantity to question Select one: O a. stay the same; increase. O b. increase; increase. O c. decrease; increase. O d. stay the same; decrease. O. e. decrease; stay the same. car wash pays $2.500 in rent, $500 in
- Q4. Manufacturing (HW). A manufacturer is currently producing an item which has a variable cost of $0.75 per unit and a selling price of $2.00 per unit. Fixed costs are $20,000. Current volume is 40,000 units. The firm can produce what it believes is a better product by adding a new piece of equipment to the process line. This equipment represents an increase of $5,000 in fixed cost. The variable cost increase would be $0.50 per unit. Volume for the new and improved product should rise to 50,000 units. (a) What is total profit now? (b) What will be the profit with the new machine? (c) Should the company invest in the new equipment?W AutoSave Off H 2.0 = PDPMT_PQM102_08 June 2023_1 - Read-Only No Label ✓ Layout References Mailings A A Aa A D x² A✓ ✓ A. А File Home Insert Draw Design X Paste Clipboard F Page 6 of 7 ■ Arial B I U U 1599 words Q Search V ✓11 ab ab X₂ X Font English (South Africa) 13° A EE¹F✓ 1.5 5 Text Predictions: On ■ Review View Help E = T 4 Paragraph 5 Accessibility: Unavailable Search W Normal Discuss the benefits of quality in relation to project performance. No Spacing e Styles Heading 1 R A Thembi Mdepa TM Editing Focus Comments Editing Dictate Sensitivity Editor Voice Sensitivity Editor ENG US Share Reuse Files Reuse Files + 09:36 2023/06/08 100%Pls help ASAP. Pls do it again as it is not the same as the previous one. It has a different equation