table below. Labor costs is RM11/hour and materials costs are RM3.5/pound. Calculate multifactor productivity for e ek.
Q: Do you believe that breaking down projects into tiny, achievable tasks is an essential aspect of…
A: Project management refers to proper planning and controlling the project activities in an standard…
Q: The progression of cell phone technology to smart phone would be considered what type of innovation?…
A: Innovation refers to the use of latest and innovative measures to develop a new product which is…
Q: PDM stand for; O a. Product development methodology O b. Project development measure O c. Precedence…
A: As per our guidelines, we are supposed to answer only the first question when multiple questions are…
Q: A one-day vaccination clinic has forecast the number of workers needed according to the table shown…
A: A worker in 10 hour shift can start from either 8 am or 10 am because after 10 am shift, the 10 hour…
Q: To begin, what is a performance test? And what are the bottlenecks in performance testing?
A: A performance test is conducted to find out the evaluations of the a system in order to measure the…
Q: b. AON diagram 3 18 10 13 3. 8. 11
A: Critical path is the path with longest duration which indicates the minimum time the project would…
Q: List and describe five (5) ways in which a project manager may seek to motivate their team.
A: Organizations are dependent on their employees. Businesses must rely on qualified project managers…
Q: agement studies at CPUT, he projected that e nated that the side will all need the same am plete the…
A: Given: Total project cost=R4000 70% of the project completes We have to calculate the earned value…
Q: Valencia Products makes automobile radar detectors and assembles two models: LaserStop and…
A: Given data is L = number of laserstop model S = number of speedbuster model Objective function: Max…
Q: a. Simulate the machine breakdowns per week for 20 weeks, b. Compute the average number of machines…
A: Machine breakdown is when the specified machine does not work at all or does not operate in the…
Q: How can a KMS system be implemented in any company such that workers may utilise it but not rely on…
A: In the ever-changing world of cloud computing, business leaders need to be able to adapt to stay…
Q: What are the drawbacks of using a Data Model in a project?
A: You are working on an important project and you have realized that you should use a data model for…
Q: Question 2 Alpha Electronics (AE) is a large manufacturer of electronics products. The company sells…
A: (a)
Q: Question 1 : Identify an appropriate inventory management strategy which Nike could implement in…
A: Inventory management is the complete process of ordering, storing, using, and selling a company's…
Q: 3 Problems seen in the situation: 1. It does not earn too much but it makes sales enough for…
A: From the case details, the following information can be extracted. 1. The company is not earning…
Q: Why Globalisation is a competition set for those who can keep up in the contemporary world
A: Globalisation refers to integration of one economy with the other economies where there is no…
Q: In what ways and for what reasons can we examine our business solution to provide the organisation…
A: Business solutions are only as valuable as the insights they provide, so it’s essential to examine…
Q: What is best, product or service? Why?
A: A product or service is output of a company which company provides to its targeted customers who…
Q: operations Manageme A contract of sale is distinct from other types of contracts because it has two…
A: A contract of sale is a contract in which a seller agrees to sell a specified quantity of a product…
Q: Do you agree that over the years Cricket and other sports has transformed in to a global industry?…
A: Global industry refers to the industry which does not have any fixed place of its operations and it…
Q: Please answer it immediately sir Linear Programming The Booboo sawmill in Batangas produces pine and…
A: Linear programming is a mathematical technique that is also used in operations management…
Q: Tell us why it's so critical to integrate product requirements with production procedures.
A: Product requirement refers to the quality of a output which a firm wants from its production units…
Q: a. Draw the precedence diagram. b. What is the probability that the project can be completed in 24…
A: A project schedule network diagram shows the sequence of the task that are performed to complete a…
Q: HOW is Risk Assessment done?
A: Risk assesment is a process of identifying a potential risk which might impact the business in there…
Q: Draw the network diagram for the project.
A: A project schedule network diagram shows the sequence of the task that are performed to complete a…
Q: An industrial manufacturing fim can produce up to 250 units per week of a machine tool; the selling…
A: Every new business's primary purpose is to sell a product or service in order to generate income…
Q: Forecasting, whether quantitative or qualitative in nature, is used every day in all business to…
A: Forecasting is an approach to expecting the tomorrow based on the outcomes of earlier data. It…
Q: Discuss the most critical topics in risk management. How important is risk management in determining…
A: Risk management refers to the management of unforseen activities of future events which might have…
Q: Digos Mineral Inc. is in water refilling. The following information pertains to its operations…
A: Given data is Processing time = 40 minutes Inspection time = 7.5 minutes Waiting time = 7.5 minutes…
Q: The contract of sale is distinct from other types of contracts because it has two additional…
A: A contract of a sale is a contract in which the one party agrees to buy and another party agrees to…
Q: Why is the police called as the initiator of the Criminal Justice System?
A: Police are the part of administration system which helps to maintain a specified decorum in the…
Q: The Tubular Ride Boogie Board Company has manufacturing plants in Tucson, Arizona and Toronto,…
A:
Q: Project X has the data points below. The schedule performance index (SPI) for task P is .. Task BCWS…
A: Here, we first understand the values given for each task BCWS = Budgeted Cost of work scheduled -…
Q: How can management challenges be faced by the manager in an organization
A: Management challenges are present in every organization. They can take many different forms, but all…
Q: A company has found that its cost to purchase a component is ETB 50 per order and the carrying cost…
A: D = annual demand H = holding cost S = setup cost
Q: Provide insight on W. Edwards Deming contributions to the quality movement?
A: Quality is an important matter for an organsiation as the quality improvement helps the firm to…
Q: What stakeholders on a project can be represented as Stakeholder A and Stakeholder B on the Power/…
A: Stakeholders are individuals or groups that have an interest in the outcome of a project.…
Q: Active listening and controlled emotion for business communication?
A: Active listening means listening to a particular thing very accurately and implementing it by…
Q: alifornia. The assembly area is ava lach 10 for 200 minutes per day. (T making other products.) The…
A: Given: Time availability to produce Mach 10 is 200mins Required output rate r=60 units/day Time…
Q: ission-only alary plus c
A: Fairness and accuracy are two important elements for businesses to bear in mind when developing a…
Q: What are the three most significant concerns when purchasing hardware?
A: Hardware refers to the physical part which we can see and has physical apperance and we can touch…
Q: in the table shown, do each of the following: 1. Draw a precedence diagram. Assuming an eight-hour…
A: A project schedule network diagram shows the sequence of the task that are performed to complete a…
Q: Forecasts must be continually adjusted in response to unforeseen changes in projected revenues…
A: Ideal forecasts are the forecasts that predict the values in the most accurate way or with the least…
Q: What was one national security policy the United States established during the Covid-19 pandemic?
A: Covid-19 pandemic has resulted in huge loss to human life. It presented an extraordinary challenge…
Q: a) A manufacturer wishes to create a flow line which will produce 555 pumps/day (8 hrs/ day). The…
A:
Q: It costs Gordon $1 to move 1 work piece 1 foot. What is the weekly total material handling cost of…
A: Cost of handling layout = Sum total of (distance*workpieces moved*Cost to move 1 workpiece 1 foot)
Q: Maximize C = 13x + 3y subject to 12x + 14y ≤ 21 15x + 20y ≤ 37 and x ≥ 0, y ≥ 0. What is the…
A: Linear programming is a mathematical technique that is also used in operations management…
Q: Principles of effective procurement and sourcing processes in food industry
A: Procurement and sourcing are two of the more confusing aspects of modern business. However,…
Q: To what extent does the law of frustration enable clear advice to be given out for specific…
A: Law of frustration is a part of contract in which both parties are ready to fulfill there part but…
Step by step
Solved in 4 steps with 2 images
- a) Wang Ceramics makes ceramic pots for a chain of stores. The output and cost figures over the past two weeks are shown in the table below. Labor costs is RM11/hour and materials costs are RM3.5/pound. Calculate multifactor productivity for each week. Week 1 2 Units of output 4200 5000 No. of workers 4 5 Hours per week per worker 52 54 Materials (lbs) 570 720Various financial data for SunPath Manufacturing for 2019 and 2020 follow. Output: Sales Inputs: Labor Raw Materials Energy Capital Employed Other Multiple Choice What is the percentage change in the multifactor labor and raw materials productivity measure for SunPath between 2019 and 2020? O O 10.39 -0.53 -2.88 2.33 2019 2020 $300,000 $330,000 43,000 51,000 9,000 262,000 6,000 -9.22 40,000 45,000 10,000 250,000 2,000A garments manufacturing firmm produces high end fashion garments. The following is information about the inputs and outpns for one ul ther latest design. Calculate the followings a Total measure productivity bMultifactor productivity based on Labor and Energy Units sold Unit price Labor hours per unit Wage rate Total material Total energy 1200 AED 700 12.5 AED 15/ hour 60% of price 5% of price
- Posey Ceramics makes ceramic vases for a chain of de-partment stores. The output and cost figures over the past four weeks are shown here. Labor costs $10 an hour, and materials are $4 a pound. Calculate the (a) labor produc-tivity (in hrs), (b) material productivity (in lbs), and (c) multifactor productivity for each week. Comment on theresults. Week 1 2 3 4Units of output 2000 4000 5000 7000No. of workers 4 4 5 6Hours per week per worker 40 48 56 70Material (lbs) 286 570 720 1000Akhbo Itd. Produces 2001 units of pen with the use of labour input of Rs. 655 abd miscellaneous input of Rs. 540 . Calculate the mutlifactor productivity of the company ?Q2: Solve the following problem and Comparison (A and B) ( O1, 2) A: Determine the productivity for these cases. 1. Two workers installed 720 square yards of carpeting in 8 hrs. 2. Four workers produced 20 Cakes in 5 hrs. B: Distinguish in detail between manufacturing and service and give me example about process in manufacturing and service.
- 1.9 David Upton is president of Upton Manufacturing, a producer of Go-Kart tires. Upton makes 1,000 tires per day with the following resources: 400 hours per day @ $12.50 per hour 20,000 pounds per day @ $1 per pound $5,000 per day $10,000 per đay Labor: Raw material: Energy: Capital costs: a) What is the labor productivity per labor-hour for these tires at Upton Manufacturing? b) What is the multifactor productivity for these tires at Upton Manufacturing? c) What is the percent change in multifactor productivity if Upton can reduce the energy bill by $1,000 per day without cutting pro- duction cr changing any other inputs? KLillian Fok is president of Lakefront Manufacturing,a producer of bicycle tires. Fok makes 1,000 tires per day with thefollowing resources:Labor: 400 hours per day @ $12.50 per hourRaw material: 20,000 pounds per day @ $1 per poundEnergy: $5,000 per dayCapital costs: $10,000 per day What is the labor productivity per labor-hour for these tires atLakefront Manufacturing?b) What is the multifactor productivity for these tires atLakefront Manufacturing?c) What is the percent change in multifactor productivity if Fokcan reduce the energy bill by $1,000 per day without cuttingproduction or changing any other inputs?The manager of a crew that installs carpeting has tracked the crew’s output over the past severalweeks, obtaining these figures:Week Crew Size Yards Installed1 4 962 3 723 4 924 2 505 3 696 2 52Compute the labor productivity for each of the weeks. On the basis of your calculations, what canyou conclude about crew size and productivity?
- Pak Andi is a director of a cake factory in the Bekasi area. To produce 900 cakes per day it takes the following things: Labor 300 hours per day @ $ 96 per hour Raw material 3 tons per day @ $ 2 per kg Energy $ 10,000 per day Capital cost $ 5,000 per day a. What is the labor productivity per labor-hour for the production of cakes at the factory?b. What is the multifactor productivity for cake production at the factory?c. If Mr. Andi wants to increase his production to 1,500 cakes per day without changingother variables, what is the productivity now?Problem 2-3 (Algo) Compute the multifactor productivity measure for each of the weeks shown for production of chocolate bars. Assume 40-hour weeks and an hourly wage of $16. Overhead Is 1.5 times weekly labor cost. Material cost is $9 per pound. (Round your answers to 2 decimal places.) Week 1 AWNF 2 3 4 Output (units) 34,000 39,000 26,000 36,000 Click here for the Excel Data File Week 1 2 3 4 Workers 7 8 4 7 MFP (Output/Total Cost) Material (lbs) 490 540 460 560Cranston Company estimates the following overhead costs for the coming year: Equipment depreciation $160,000Equipment maintenance 60,000Supervisory salaries 40,000Factory rent 100,000Total $360,000 Cranston is also budgeting $600,000 in direct labor costs and 15,000 machine hours for the coming year.(a) Calculate the predetermined overhead rate using direct labor costs as the allocation base. (b) Calculate the predetermined overhead rate using machine hours as the allocation base.